2021MDRRM

You might also like

You are on page 1of 39

The 1987 Philippine Constitution mandated all Local Government Unit to come up with development plans and programs

e up with development plans and programs which guarantee


inclusive growth for all sectors. Furthermore, this serves as a comprehensive blueprint to the holistic government approach towards
different social concerns.

Through the years, we have noticed that majority of our development plans has been implemented and capacitated communities. Together
we have identified projects and programs that directly give immediate solutions to long time problems. Under our brand of service “Serbisyong
Kay Bilis” our people has been with us from planning up to the implementations and realizations of our shared dreams and aspirations.

These Thematic Plans and Programs for the year 2021 are by-product of multi-sectoral planning that focused on the current and eminent
problems of Pinamaleños, especially under the state of “new normal”. With the help of different key individuals from Non-Government
Organizations (NGO’s), Civil Society Organizations (CSO’s), National Government Agencies (NGA), Municipal Government of Pinamalayan (MGOP) and Local Leaders, our people
has the assurance that no one will be left behind. Moreover, the demand of the fast changing world is one of the major considerations in crafting these manuscripts.

Our heartfelt commendation and appreciation goes to the selfless man and women of this Municipality who made these thematic plans and programs possible and reliable.

Tuloy ang Serbisyo, Tuloy ang Asenso! Sama-sama po nating isigaw ang nagkaka-isang pangarap at aspirasyon ng bawat Pinamaleño “PILIPINAS PINAMALAYAN NAMAN”.

HON. ARISTEO APASAN BALDOS, JR.


Municipal Mayor
Planning is essential in all agencies, regardless of being private or public. It helps us to easily review the strengths and weaknesses of the
agency and to determine predicaments that require serious attention and immediate actions. Proper preparation will put our agency in a
better position to achieve success.

Hence, the foregoing Thematic Plans and Programs (TPP) 2021 of this municipality contain identified programs/projects/activities that this local
government unit believes needed to be implemented and can have the most impact to address different issues and concerns of various sectors
of this municipality. Also, through this, we as leaders and employees of this municipal government are more equipped and focused in handling
uncertainties and different scenarios that may occur in the future with a list of resources.

However, to materialize all of these, we should act and work as one to meet our development goals and objectives for the betterment of our constituents and continuous improvement
of our beloved town, Pinamalayan.

Remember, “Great things in business are never done by one person. They are done by a team of people” – Steve Jobs

HON. RODOLFO M. MAGSINO


Municipal Vice Mayor
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

DISASTER PREPAREDNESS

GOAL: Establish and strengthen capacity of communities to anticipate, cope and recover from the negative impact disaster..

OBJECTIVES:
1. Increase the level of awareness of the community to the threat and impact of all hazards, risks and vulnerabilities;
2. Equip the community with the necessary skills to cope with negative impacts of disasters;
3. Develop and implement comprehensive local and barangay disaster preparedness policies, plans and system.

OUTCOME 1: Communities will be equipped with necessary skills to cope with the impact of disasters.

INDICATORS
• Number of orientation/training, number of trained volunteers trained.
• Approved BDRRM Plan/ Approved Contingency Plan
• MDRRM and CCA Plan developed
• Number of drills/exercises conducted
• Number of info drive
• Number of fire, storm surge, flood drill earthquake drill
• Number of signage’s posted
• Number of ERT institutionalized
• Number of partnership established
• Number of lot acquired
• Number of mobile clinic established
• Number of capacity building conducted
• DRRM and CCA Plan integrated to CLUP
• MOP developed
• Number of BDRRMC Reorganized and BDRRM and Contingency Plan updated
• Number
LEAD of inventory
AGENCY: MDRRMC conducted/documented
IMPLEMENTING PARTNERS: MEO, MHO, PCG, PNP, BFP, MBO, MAO, ABC President, MDRRMO, NGO, ACADEME, CENRO

Page 1 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
Budgetary Requirements
OUTCOME OUTPUTS ACTIVITIES Performance Indicators Timeline Other Sources
2019 2020 2021 2022 2019 2020 2021 2022
Communities will be 1. Increase level of awareness 1.Creation of permanent 8 Permanent Positions created
equipped with and enhanced capacity of positions Municipal Government
necessary skills to cope communities to the threats and Department Head 1 SG 24/1
with the impact of impacts of all hazards Assistant Municipal Government
disasters. Department Head 1 SG 22/1
LDRRM Assistant SG 8/1 50% 50% 50% 50% 3,000,000 3,000,000 4,000,000 4,000,000 LGU GF
Driver I SG 3/1
Administrative IV SG 4/1
Computer Operator 1 SG 7/1
Administrative Aide III SG 3/1

1.1 Conduct of Drills, Simulation


Exercises, Orientation Trainings
and other related seminar on
disaster preparedness and
response

1.1.1 Skills Training and 1 Skills Training and


Development on Search and Development on Search and
Rescue, Basic Life Support/First Rescue, Basic Life Support/First 100% 100% 100% 100% 300,000 300,000 300,000 300,000
Aid with AED and Extraction Aid with AED and Extraction
Implemented
1.1.2 Skills Training on Water 1 Skills Training on Water
Search and Rescue (WASAR) Search and Rescue (WASAR) 100% 100% 100% 100% 150,000 150,000 150,000 150,000

1.1.3 Skills Training on 1 Skills Training on Mountain


Mountain Search and Rescue Search and Rescue (MOSAR) 100% 100% 100% 100% 150,000 150,000 150,000 150,000
(MOSAR) Conducted Conducted
1.1.4 Training on Incident 1 Training on Incident
Command System Conducted Command System Conducted 100% 100% 100% 100% 300,000 300,000 300,000 300,000

1.1.5 Post Disaster Damage 1 Post Disaster Damage and


and Needs Assessment and Needs Assessment and Rapid
100% 100% 100% 100% 400,000 400,000 400,000 400,000
Rapid Disaster Damage and Disaster Damage and Needs
Needs Analysis facilitated Analysis

Page 2 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
Budgetary Requirements
OUTCOME OUTPUTS ACTIVITIES Performance Indicators Timeline Other Sources
2019 2020 2021 2022 2019 2020 2021 2022
1.1.6 Cluster Conducted 9 Cluster Conducted Training
Training on Community Based on Community Based Disaster
100% 100% 100% 100% 300,000 300,000 300,000 300,000
Disaster Risk Reduction and Risk Reduction and
Management Management
1.1.7 Land Search and Rescue 1 Land Search and Rescue
100% 100% 100% 100% 200,000 200,000 200,000 200,000
Training Training
1.1.8 High Angle Training 1 High Angle Training 100% 100% 100% 100% 400,000 400,000 400,000 400,000
1.1.9 Urban Search and Rescue 1 Urban Search and Rescue
100% 100% 100% 100% 200,000 200,000 200,000 200,000
Training (USAR) Training (USAR)
1.1.10 Open Water Diving 1 Open Water Diving Training
100% 100% 100% 100% 300,000 300,000 300,000 300,000
Training
1.1.11 Nutrition in Emergency 1 Nutrition in Emergency 100% 100% 100% 100% 200,000 200,000 200,000 200,000
1.1.12 Camp Management and 1 Camp Management and Lamp
camp Coordination Training Coordinator Training 100% 100% 100% 100% 200,000 200,000 200,000 200,000

1.1.13 Conduct of Drills, 1 Conduct of Drills, Simulation


Simulation Exercise and other Exercise and other Related 100% 100% 100% 100% 700,000 700,000 700,000 700,000
Related Training Training
1.1.14 Benchmarking, cross 1 Benchmarking, cross visitation
visitation of MDRRMC and of MDRRMC and MDRRM 100% 100% 100% 100% 500,000 500,000 500,000 500,000
MDRRM Personnel Personnel
1.1.15 Review BDRRM Plan All 37 BDRRM plan and
100% 100% 100% 100% 300,000 300,000 300,000 300,000
and Contingency Plan Contingency Plan Reviewed
1.1.16 Training on Management 1 Training on Management of
of the Dead and Missing the Dead and Missing 100% 100% 200,000 200,000
conducted
1.1.17 Training on Contact 1 Training on Contact Tracing
100% 100% 200,000 200,000
Tracing facilitated
1.1.18 Posting of Signage’s All signage warning and info
Warning and Info materials in materials posted
100% 100% 100% 100% 200,000 200,000 200,000 200,000
conspicuous and hazard prone
places
1.1.19 Printing and Distribution All leaflets and pamphlets
of leaflets and pamphlets printed and distributed 100% 100% 100% 100% 200,000 200,000 200,000 200,000

Page 3 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
Budgetary Requirements
OUTCOME OUTPUTS ACTIVITIES Performance Indicators Timeline Other Sources
2019 2020 2021 2022 2019 2020 2021 2022
1.1.20 Improvement of EWS All EWS Device ( Signage’s,
Devices and Communication poster, siren, rain gauge and
System other related Equipment’s for
EWS and Communication
System(Handheld Radio base, 100% 100% 100% 100% 300,000 300,000 300,000 300,000
mobile phones and other
support apparatus infrastraction
purchased and installed and
procured
1.1.21 Develop Manual 1 Manual Operator for DRRM
Operator for DRRM developed 100% 100% 100% 100% 200,000 200,000 200,000 200,000

2. Increase DRRM and CCA 2.1 Stockpiling of goods and Stockpiled of goods
capacity of Local DRRM NFI and medicines for relief
Councils and Offices of All level operations as well as physical
100% 100% 100% 100% 1,000,000 1,000,000 10,000,000 10,000,000
logistics for response operation
in the municipal and barangay
level
2.2 Stockpiling of goods for MOA or pledge of Commitment
emergency response ( goods Signed
and nonfood items and
medicines) MOA with private
sectors for using resource 100% 100% 100% 100% 20,000 20,000 20,000 20,000
including manpower, vehicle ,
warehouse, building, expertise
and goods on credit for
business establishments
3.Well managed Emergency 3.1 Establishment and Central Communications and
Disaster Operation Center Construction of Central Emergency Response Center 70% 30% 70,000,000 30,000,000
Communication and Emergency established and constructed
Response Center
Improvement of Municipal Improvement of Municipal
Evacuation Center, MDRRM Evacuation Center, MDRRM
Office and EOC Office and Emergency 100% 15,000,000
Operation Center procured,
installed and improved

Page 4 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
Budgetary Requirements
OUTCOME OUTPUTS ACTIVITIES Performance Indicators Timeline Other Sources
2019 2020 2021 2022 2019 2020 2021 2022
Procurement of DRRM tools, All DRRM tools, equipment,
devices, machineries and devices, machineries, personal
Personal Protective Equipment protective equipment/gears and 100% 100% 1,200,000 5,000,000 5,000,000
other related for search and
rescue operation procured

Procurement of MDRRMO All MDRRMO Rescue Vehicle


Rescue Vehicle, Heavy (Emergency Response Vehicle),
Equipment and other vehicles Heavy Equipment (bulldozer,
intended for the search and grader, back hoe, loader,
100% 100% 20,000,000 20,000,000
rescue operation dumptruck) and other vehicles
intended for the search and
rescue operation procured

Page 5 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

DISASTER PREVENTION AND MITIGATION

GOAL: Avoid hazards and mitigate their potential impacts by reducing vulnerabilities and exposure and enhancing capacities and communities.

OBJECTIVES:
1. Reduce vulnerability and exposure of communities to all hazards.
2. Enhance capacities of communities to reduce their own risks and cope with the impacts of hazard

OUTCOME 1: DRRM and CCA mainstreamed and integrated into local development policies, plans and budget.

INDICATORS
1. At the Municipal level 100% utilization of the 5% P/C/MDRRMF for the implementation of DRRM-responsive and CCA activities
2. At the Barangay level, 100% utilization of the 5% BDRRMF for DRRM-responsive BDP/AIP, CCA & related activities
3. DRRM and CCA mainstreamed in various plans (CDP and CLUP), policies and/or ordinances enacted
4. The MDRRM Council and Office/Barangay DRRM Committees created and functional

LEAD AGENCY: MDRRMC


IMPLEMENTING PARTNERS: MEO, MHO, PCG, PNP, BFP, MBO, MAO, ABC President, MDRRMO, NGO, ACADEME, CENRO

Percent of Implementation
Budgetary Requirements
OUTCOME OUTPUTS ACTIVITIES Performance Indicators Timeline Other Sources
2019 2020 2021 2022 2019 2020 2021 2022
DRRM and CCA 1. Impacts of risk on 1. Adhere to the provision of the 100% utilization of 70% of the
mainstreamed and development programs and law on the utilization of 5% MDRRM/BDRRM fund Annual 100% 100% 100% 100% 1,000,000 1,000,000 1,000,000 1,000,000 LGU
integrated into local projects are well recognized in MDRRM fund conduct of review of fund
development policies, government plans utilization
plans and budget 2. Impact of climate risk on Inclusion of CCA activities 100 % Implementation of
development programs are well 2.1 Clearing & Construction of clearing, cleaning, construction
recognized in plans and creeks, canals, and drainage, and repair activities
25% 25% 25% 25% 1,200,000 1,500,000 1,500,000 2,000,000 LGU
budgets. rivers and riverbanks and
coastal cleanup and repair
activities implemented
2.2 Tree planting and bamboo 20,000 pieces of trees and
activities along coastal, river, bamboo planted every year
watershed, upland barangays 25% 25% 25% 25% 100,000 100,000 100,000 100,000 LGU, DENR, DA
and other denuded areas.

2.3 Installation of Community 37 units of EWS devices


25% 25% 25% 25% 300,000 300,000 300,000 300,000 MDRRMO, OCD
based early Warning System installed

Page 6 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
Budgetary Requirements
OUTCOME OUTPUTS ACTIVITIES Performance Indicators Timeline Other Sources
2019 2020 2021 2022 2019 2020 2021 2022
2.4 Rehabilitation of Mangrove All coastal barangay with
MDRRMO, LGU,
areas along coastal Barangay. mangrove areas rehabilitated 25% 25% 25% 25% 300,000 300,000 300,000 300,000
BFAR, DENR
3. Decision and Policies 3.1 Formulate provisions and 6 unit vehicles purchased
supported by tools and regulations for the acquisition of
equipment that will enhance the equipment and tools.
capability of MDRRMC for Provision/regulations approved 50% 50% 6,000,000 6,000,000 20,000,000 20,000,000 LGU
mitigation and prevention by Sanggunian to purchase the
ff:
Acquisition of Rescue Vehicles
Acquisition of additional Rescue All necessary tools, equipment’s
equipment’s tools and gears and gears procured and 100% 100% 100% 100% 2,000,000 2,000,000 2,000,000 2,000,000 LDRRMF
purchased
Desktop with printer and other 4 units purchased
100% 300,000 400,000 400,000 LDRRMF
accessories
LCD Projector with screen 1 unit purchased 100% 70,000 100,000 100,000 LDRRMF
CCTV Program for command 1 CCTV command Center and
center 10 cameras installed 50% 25% 25% 100,000 50,000 50,000,000 50,000,000 LDRRMF
TV Monitoring System 2 units procured 50% 50% 80,000 80,000 LDRRMF
Digital Cameras 2 units procured 50% 50% 70,000 70,000 LDRRMF
Photo Copier Machine 1 unit procured 100% 80,000 LDRRMF
Purchased of necessary Regular inclusion of funds for
supplies (oil, fuel, and lubricant
acquisition of oil, fuel and 100% 100% 100% 100% 1,000,000 1,000,000 1,000,000 1,000,000 LDRRMF
for disaster purposes lubricant
Repair and Maintenance of All necessary rescue vehicles
Rescue Vehicles and Rescue machine and rescue equipment
100% 100% 100% 100% 1,000,000 1,000,000 1,000,000 1,000,000 LDRRMF
Equipment, Tools and Gears tools and gears repaired and
maintained
4. Enhanced municipal wide 4. Conduct of IEC on a 100% conduction of IEC and
participation in DRRM and CCA quarterly basis and consultation majority participation of CSO
100% 100% 100% 100% 50,000 50,000 50,000 50,000 LGU, LDRRMF
plans and activities with CSO and other and stakeholders
stakeholders regularly
4.1 Design programs and Directories posted in DOCs as
activities that enhances well as hotlines
100% 100% 100% 100% 50,000 50,000 50,000 50,000 LGU, LDRRMF
coordination with National and
local agencies.

Page 7 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
Budgetary Requirements
OUTCOME OUTPUTS ACTIVITIES Performance Indicators Timeline Other Sources
2019 2020 2021 2022 2019 2020 2021 2022
- Formulation of Directory and
post it inside the
MDOC/BDOC
4.2 Design and Print posters Poster leaflets and directories
and leaflets that will serve as signage’s posted.
awareness campaign materials, 25% 25% 25% 25% 150,000 150,000 150,000 150,000 LGU, LDRRMF
directional signage’s and hazard
awareness
4.3 Operation LISTO awareness LISTO materials distributed
50% 25% 25% 100,000 50,000 50,000 LGU, DILG
5. Measures to reduce 5.1 Conduct capacity Inventory of families in high risk
vulnerability and to increase vulnerability assessment on a areas and critical infra on 4
capacity to cope with disaster regular basis identified hazards in established 50% 50% 100% 100% 50,000 50,000 100,000 100,000 MDRRMO, MEO
are integrated in plans, and regularly validated
programs and projects
5.2 Implementation of Disaster
mitigation related Infrastructure
support facilities and projects
5.2.1 Construction of Flood control/drainage system,
Municipal drainage and flood slope protections constructed 25% 25% 50% 20,000,000 20,000,000 40,000,000
Control/Protection Projects LGU, NGAs,
5.2.2 Construction of Evacuation centers and DOCs
25% 25% 25% 25% 5,000,000 5,000,000 5,000,000 5,000,000 OCD, DPWH
Evacuation Centers/DOC constructed
5.2.3 Construction of Waste Waste water treatment facilities
50% 50% 20,000,000 20,000,000
water treatment Facility constructed
5.2.4 Construction or Bridges constructed and
Retrofitting of timber Bridges repaired 25% 25% 25% 25% 800,000 800,000 800,000 800,000

5.2.5 Installation of water Water sources and latrines


source and latrines for installed in ECs 25% 25% 25% 25% 100,000 100,000 100,000 100,000 LGU, LDRRMF
evacuation centers
5.2.6 Installation of Radio bases and repeaters
communication facilities constructed 100% 100% 100% 1,200,000 2,000,000 2,000,000 LDRRMF, LGU

5.2.7 Improvement and MDOC, EOC and MDRRM


Rehabilitation of MDOC with Office improved and
complete facilities as rehabilitated 50% 50% 100% 100% 1,000,000 1,000,000 15,000,000 15,000,000 LDRMF
command center and MDRRM
office

Page 8 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
Budgetary Requirements
OUTCOME OUTPUTS ACTIVITIES Performance Indicators Timeline Other Sources
2019 2020 2021 2022 2019 2020 2021 2022
5.2.8 Maintenance of all Funds allocated for the
facilities installed, constructed maintenance of the disaster
and purchased for disaster mitigation facilities 25% 25% 25% 25% 1,000,000 1,000,000 1,000,000 1,000,000 LGU, LDRRMF
mitigation and prevention
purposes
5.2.9 Fabrication/ construction Store-rooms and mobile
of mobile store-rooms and command centers fabricated 20% 60% 100% 200,000 600,000 1,000,000 LDRRMF
command centers
6. Local DRRM Councils 6.1 Conduct of regular quarterly Number of Regular meetings
Established council meeting and emergency and emergency meeting
100% 100% 100% 100% 50,000 50,000 50,000 50,000 LGU, LDRRMF
meetings if necessary conduct

6.2 Benchmarking, cross Number of benchmarking and


visitation of Council Meetings cross visitation conduct 25% 25% 25% 25% 400,000 400,000 400,000 400,000 LGU, LDRRMF
conducted
7. Formulation of plans and Plans and activities put into 100% utilization of 70% of the
policies that preserve and action ensuring environment MDRRM/BDRRM fund Annual
100% 100% 100% 100% 40,000 40,000 40,000 40,000 LGU, LDRRMF
develop environment. preservation and development conduct of review of fund
utilization
Revise plans and policies that Regular schedules of coastal Clean-up activities conducted
prevent and mitigate the clean-up and declogging of 100% 100% 100% 100% 10,000 10,000 10,000 10,000 LGU, MENRO
occurrence of waterways and creeks
flooding/flashfloods, landslides Regular implementation of Municipal search for cleanest
MDRRMO,
infectious diseases outbreak fire cleanliness drive relative to and greenest brgy. And coastal 100% 100% 100% 100% 100,000 100,000 100,000 100,000
MENRO
and earthquake health and sanitation areas conducted annually
Provision of adequate water Water testing conducted
supply system and regular annually LGU, MHO,
25% 25% 50% 30,000 30,000 60,000
schedules of water inspection LDRRMF
and testing
Ordinances on the
preservation/maintenance of 100%
water ways easement
Ordinances upland programs of
eliminating fire hazards 100% 100%
materials.
Issuance of ordinance to
eliminate the use of plastic 100%
materials

Page 9 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
Budgetary Requirements
OUTCOME OUTPUTS ACTIVITIES Performance Indicators Timeline Other Sources
2019 2020 2021 2022 2019 2020 2021 2022
8. DRRM and CCA assessment 8.1 Conduct climate vulnerability 100% implementation of climate
and mapping tools assessment on regular basis vulnerability assessment-both
50% 50% 100% 100% 100,000 100,000 200,000 200,000 LDRRMF
municipal and barangay level. municipal and barangay level
and integrated to CLUP
8.2 Printing of climate risk map Maps printed and posted 25% 25% 50% 20,000 20,000 40,000 LDRRMF
8.3 Inventory elements at risk to Database prepared
25% 25% 25% 25% 50,000 50,000 50,000 50,000 LDRRMF
climate hazards
9. Readily usable and access 9.1 Formulation of Municipal Finalized municipal hazard
of DRRM and CCA planning Hazard Profile profile 100% 50,000 MDRRMO
tools and enhancement of use
9.2 Conduct and attendance to Attend research and seminars
of vulnerability assessment 100% 100% 100% 100% 200,000 200,000 200,000 200,000 MDRRMO
capacity building research
mechanism by municipality and
activities (c/o MDRRMC)
barangay. 9.3 Establishment of knowledge Partnership established
management center and
information dissemination 25% 25% 25% 25% 50,000 50,000 50,000 50,000 MDRRMO
through various partners and
stakeholders (c/o MDRRMC)
9.4 Establish Pre-Disaster Risk PDRA finalized
100% 100% 100% 100% 20,000 20,000 20,000 20,000 MDRRMC
Assessment
10. Enhanced monitoring, 10.1 Installation of equipment Equipment installed
forecasting, and hazard warning and establish facilities for EWS (
25% 25% 25% 25% 250,000 250,000 250,000 250,000 LDRRMF, NGAs
flood, tsunami, storm surge,
landslide)
10.2 Development and EWS trainings and seminars
institutionalize EWS information conducted
sharing between LGU- 100% 100% 100% 100% 150,000 150,000 150,000 150,000 LDRRMF
barangay, National and other
partners
10.3 Continuous training on Personnel trained
50% 50% 50% 50% 80,000 80,000 80,000 80,000 LDRRMF
hazard monitoring
11. Sustained DRRM and CCA 11.1 Continuous Implementation DRRM plan sustained
Disaster Prevention and of disaster prevention and
Mitigating measure mitigation related infrastructure
100% 100% 100% 100%

Page 10 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
Budgetary Requirements
OUTCOME OUTPUTS ACTIVITIES Performance Indicators Timeline Other Sources
2019 2020 2021 2022 2019 2020 2021 2022
11.2 Develop and enhance 1 system developed
coordination of info and 100% 100% 100,000 100,000 LDRRMF
communication
11.3 Conduct annual planning 1 planning every year
workshop for the review of 100% 100% 100% 200,000 200,000 200,000 LDRRMF
DRRM Plan
12. Prevention and Mitigation for 12.1 Procurement of Medical Total no. of personal protective
Epidemic and Pandemic Crisis Apparatus, Supplies and equipment (PPE) such as
Situation Equipment gloves, gowns, masks, goggles,
face shield, surgical equipment
medical supplies, tools,
consumables such as
alcohol,reagents,medicines,
vitamins, disinfectants, sprayer, 100% 100% 10,000,000 10,000,000 LDRRMF
disinfection tents, disinfecting
supplies, misting equipment,
thermal scanner and other
necessary PPAs and expenses
for epidemic and pandemic
crisis procured

Page 11 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

DISASTER RESPONSE

GOAL: Provide life preservation and meet the basic subsistence needs of affected population based on acceptable standards during or immediately after a disaster.

OBJECTIVES:
1. Decrease the number of preventable and injuries.
2. Provide basic subsistence needs of affected population.
3. Immediately restore basic social services.
OUTCOME:
• Well established disaster response.
• Adequate and prompt assessment of needs and damages in the Municipality.
• Integrated and coordinated search, rescue and retrieval (SSR) capacity.
• Evacuated safety and on time affected communities.
• Temporary shelter needs are adequately addressed.
• Basic Health Services provided to affected population whether inside or outside ECS.
• Psychosocial well-being promoted and mental health problems and risk reduced.
• Coordinated, integrated system for early recovery implemented on the local levels.
INDICATORS
• ICP installed for every disaster and activated
• Reports from every affected barangay were consolidated.
• Established relief distribution center.
• Creating of three teams to conduct survey in every barangays.
• Number of RDANA coordinated with the PDRRMC.
• Number of person missing VIS-A-VI, retrieval and reconnected with their families.
• Number of vulnerable communities evacuated one day before the impact. VIS-A-VI, Number of population identify as highly vulnerable.
• Number of learning space provided for learning area.
• Number of space in ECs provided for the communities livestock, poultry and pets.
• Number of beneficiaries as compared to affected population needing livelihood assistance.
• Number of medical consultation and medical mission conducted on every barangay’s in coordination with MDRRMC.
• Reduction in the number of persons treated, Number of water quality assessed thru the MDRRMC / MHO.
• Availability of health center in every barangay.
• % of illness restored within acceptable period.
• Number of psychosocial services coordinated in the municipal with the assistance of PHO.
• Number of person provided of psycho-social care as compared to the number of person needing the services.
• One (1) PDNA for every major disaster.
• Number of donors compared to actual requirements.
• Number of MOA establish and or updated.
LEAD AGENCY: MDRRMC
IMPLEMENTING PARTNERS: MEO, MHO, PCG, PNP, BFP, MBO, MAO, ABC President, MDRRMO, NGO, ACADEME, CENRO
Page 12 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
LEAD PERFORMANCE Timeline Budgetary OTHER
IMPLEMENTING PARTNERS OUTCOME OUTPUTS ACTIVITIES
AGENCY INDICATORS Beyond 3 Requirements SOURCES
1-7 Days 1-3 mos.
mos.
MDRRMO DILG, Admin, PCG, AFP, 1.Well established disaster / 1.1 Functional ICS 1.1 Activation of ICS during 1.1 One (1) ICS activated Activation of
BFP, PNP, MBO, MPDO, emergency response disaster or emergency. with the group of first &
50,000 LDRRMF
MAO, MHO,BRRMC, DepEd. operation responder on site secondary
responders
1.1.1. Number of within 24 hour
members emergency after the
response team deployed incident
in the affected
barangays / area.
1.2 Well established system of Issuance of warning signal Availability of timely, Upon receipt
information gathering, and public advisories within accurate and reliable of advisory
reporting and dissemination the protocols developed (upon information during
receipt of the advisory from response.
PDRRMO & OCD) LDRRMF
Deployment of RDANA team
Trained RDANA ready for Immediately 100,000
deployment. after the
impact.
1.3 Established a functional Conduct of relief distribution at Relief distribution of the Within 24 Red Cross,
relief operation as per manual the designated distribution affected area. hours after DSWD, PGOM,
of operation. center. the impact Other NGO’S
30% of
LDRRMF
- Provision of relief assistance
to affected families

Provision of community Number of evacuation Immediately


kitchen at designated centers with community at the onset of
evacuation center with kitchen. the disaster. 30% of
consideration to under MSWDO
LDRRMF
nourished and malnourished
children and breast feeding
mothers.
MEO, MAO, MHO 2. Accurate and prompt 2.1 Submission of disaster and 2.1 Conduct rapid damage 2.1 Rapid needs Within 6
damage assessment in monitoring reports on time assessment. assessment conducted in hours
needs in all barangays all affected areas

Page 13 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
LEAD PERFORMANCE Timeline Budgetary OTHER
IMPLEMENTING PARTNERS OUTCOME OUTPUTS ACTIVITIES
AGENCY INDICATORS Beyond 3 Requirements SOURCES
1-7 Days 1-3 mos.
mos.
2.2 Using the latest DANA 2.2 DANA conducted
assessment tool, consolidate, covering all areas affected
analyze and disseminate data
by the local and national
DRRM Councils
MDRRMO 3. Integrated and coordinated 3.1 Victims found, retrieved 3.1 Adopt and implement the 3.1 Number of persons
Search, Rescue and Retrieval and reconnected with their system for SRR and proper rescued and treated, and
(SRR) Capacity families disposal with concerned number of bodies
agencies retrieved, identified and 30% of
turn-over to their LDRRMF
Coordination with the concern respective families
MDRRMC members headed
by MHO and MSWDO
MSWDO,AFP, 4.Safely evacuated the 4.1 Evacuated affected 4.1 Coordination with 4.1 No. of affected families Within 12
PNP,MEO,MHO,DepED, PAF affected families families and provided appropriate Agencies evacuated at the hours
Reservist Guardians APO immediate assistance designated evacuation 30% of
center, pre-emptive LDRRMF
evacuation and mandatory
action thru coordination

4.2 Master listing of families


inside evacuation center for 30% of
determination of no. of families
LDRRMF
and assistance needed.

4.3 Conduct community


kitchen and provision of other
needs. (e.i clothing, medical,
security etc.)

Page 14 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
LEAD PERFORMANCE Timeline Budgetary OTHER
IMPLEMENTING PARTNERS OUTCOME OUTPUTS ACTIVITIES
AGENCY INDICATORS Beyond 3 Requirements SOURCES
1-7 Days 1-3 mos.
mos.
5.Temporary shelter needs are 5. All evacuees are sheltered 5. Identification of standard- 5. Number of temporary
adequately addressed in adequately equipped based relief shelters and sites shelters identified.
facilities for all (including Identifications of relief shelters
lactating mothers) in the Brgy. With complete
basic facilities (with Comfort 30% of
Room, Beddings, room for LDRRMF
lactating mother, potable
water, lightning system, first
aid kit)

MEO DepEd 5.1 Child friendly spaces or 5.1 Establishment of child- 5.1 Restored education Within 12
temporary learning in the EC friendly space/temporary services when Evacuation hours
for continuity of education learning area in the EC for center are schools
continuity of education of the
evacuees
MHO MAO, Sanitary Inspector 5.2 Safety for the sources of 5.2 Provide spaces for 5.2 Separate area Within 12
30% of
the livelihood of the affected people’s livestock, poultry and provided for the poultry, hours
LDRRMF
families pets in the ECs. livestock and pets
MSWD, DepEd-ALS, TESDA 5.3 Increased and diversified 5.3 Conduct livelihood 5.3 No. of ECs with
MAO people’s livelihood skills orientation activities for livelihood training 30% of
internally displaced affected programs for the affected LDRRMF
families families
MHO BNS’s, BHW’s 6. Basic health services 6. All patients seen/treated 6. Medical consultation and 6. No. of patients seen, Within 12
provided to affected population and epidemics prevented provision of medicines treated and served hours 30% of
weather inside or outside ECS LDRRMF

MHO, MEO BNS’s, BHW’s 6.1 Water-borne diseases 6.1 Assessment of water 6.1 Water sanitation Within 12
CENRO/MENRO prevented quality and conduct of quick services based on hours 30% of
damage repairs and road standard LDRRMF
clearing operations
MHO PHO 6.2 Database of hospitals and 6.2 Determination if there is 6.2 Data based prepared Within 1 - 7
other health care providers enough clinics and hospitals to and number of hospital days
address to casualties. and clinic identified 30% of
- Determine hospitals/clinics LDRRMF
health centers and population
ratio

Page 15 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
LEAD PERFORMANCE Timeline Budgetary OTHER
IMPLEMENTING PARTNERS OUTCOME OUTPUTS ACTIVITIES
AGENCY INDICATORS Beyond 3 Requirements SOURCES
1-7 Days 1-3 mos.
mos.
DPWH,PA MEO 6.3 Lifelines restored 6.3 Immediate restoration of 6.3 Coordinated with
LECO lifelines. proper authorities
30% of
- Restoration of water,
LDRRMF
electricity, communication,
roads and bridges
MSWD, MSWD,MHO, Psychologist 7. Psychological well-being 7. Disaster-affected population 7. Coordination among heads 7. No. of affected With different
DOH promoted and mental health are in good mental and of Mental health psychosocial population which were phases; adopt
problems and risks reduced psychological state services provided with MHPSS the DOH 30% of
guidelines LDRRMF
and/or
protocols

MSWD MSWD, MHO 7.1 Conduct of traumatic 7.1 No. of people who are
and/or psychological stress undergoing trauma
30% of
debriefings debriefing or undergoing
LDRRMF
psychological stress
debriefing
MSWD DOLE, PESO, ALS 8. Coordinated, integrated 8. Mechanism for coordinated 8. Conduct of PDNA 8. No. persons with
30% of
system for Early Recovery and integrated early recovery continuing assistance
LDRRMF
implemented on the national established and essential financial livelihood
DPWH MEO and local levels services restores 8.1 Strengthen partnership 8.1 Percent of vulnerable
mechanisms with utility population provided with 30% of
providers and key adequate and appropriate LDRRMF
stakeholders risk protection measures

Page 16 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

DISASTER REHABILITATION AND RECOVERY

GOAL: Restore and improve facilities, livelihood and living conditions and organization capacities of affected communities and reduce disaster risks in accordance the “Build Back better "principle.

OBJECTIVES:
1. To restore people’s means of livelihood and continuity of economic activities and business.
2. To restore shelter and other building / installation.
3. To reconstruct infrastructure and other public utilities.
4. To assist in the physical and psychological rehabilitation of persons who suffered from the effect of disaster.

OUTCOME:
• Damages and Losses needs assessed.
• Economics activities restored and, if possible strengthened or expanded.
• DRRM / CCA elements incorporated in human settlement.
• Disaster and Climate Change resilient and infrastructure reconstructed.
• A psychologically sound, safe and secured citizenry that is protected from the effects of disaster able to restore to normal functioning after each disaster.

INDICATORS
• Strategic Plan for disaster affected area formulated.
• Appropriate programs and services identified to disaster stricken area.
• Credit Facilities identified and documented.
• Designed Disaster resilient house / constructed / reconstructed.
• Social preparations of host communities and evacuees / relocated families to avoid conflict conducted.
• Necessary assistance provided to victims of calamities / emergencies.
• In restructure facilities retrofitted / reconstructed to withstand effect of unforeseen calamities.
• Building code strictly implemented.
• Approval of infrastructure projects and permits monitored.
• Referral system developed.
• PDANA conducted.
• Training / capacity building for stress de briefers / psychosocial support groups conducted.

LEAD AGENCY: MDRRMC


IMPLEMENTING PARTNERS: MEO, MHO, PCG, PNP, BFP, MBO, MAO, ABC President, MDRRMO, NGO, ACADEME, CENRO

Page 17 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
LEAD PERFORMANCE Timeline Budgetary OTHER
IMPLEMENTING PARTNERS OUTCOME OUTPUTS ACTIVITIES
AGENCY INDICATORS Beyond 3 Requirements SOURCES
1-7 Days 1-3 mos.
mos.
MEO MEO, MSWDO, MHO, MBO, 1. Damages, Losses and 1. Post Disaster Needs 1. Conduct Post-Disaster 1. PDNA conducted for the Immediately LDRRMF,
MA, MAO, DOLE, PSWDO, Needs Assessed. Assessment Needs Assessment (PDANA) municipality after the OCD,
DA, RFU 4B & OPAg emergency PDRRMO,
200,000
a. Health period. PEOPLE'S
b. Infrastructure SURVIVAL
c. Economics FUND
MPDO 1.1 Strategic Action Plan and 1.1 Coordinate the formulation 1.1 No. of livelihoods
proposals. of the SAP for disaster – established through
150,000
affected areas (C/O government support.
MDRRMC, BDC, BDRRMC)
MAO MAO 2. Economic activities restored 2. Livelihood programs and 2. Identify the needed 2. No. of livelihood
and, if possible strengthened projects. assistance and formulate / identified and
or expanded. implement appropriate restores/revived through
program. Municipal support. 3,000,000 LGU, NGA
- Provide cash assistance to
affected families for their
livelihood.
2.1 Credit facilities for affected 2.1 Identify mobilize funding 2.1 No. of person with
families. sources. approved credit for 1,000,000 LGU, NGA
affected sectors.
MEO MPDO 3. DRRM / CCA elements 3. Safe relocation site. 3. Identify and provide suitable 3. Affected
incorporated in human relocation sites for affected persons/families provided
settlement. persons/families (c/o with safe relocation and 3,000,000 LGU, NGA
MDRRMC) resettlement areas.

3.1 Disaster resilient housing 3.1 Designing and 3.1 Constructed and
designed and constructed. construction of disaster designed disaster resilient LGU, NGA
resilient housing. housing (30 units)
3.2 Self-sufficient communities 3.2 Conduct trainings for 3.2 No. of trainings
with access to basic social social preparation of host conducted to host
services. communities and those that communities. LGU, NGA
will be relocated to reduce
conflict (c/o MDRRMC)
3.3 Partially/ totally damaged 3.3 Provision of construction 3.3 No. of partially / totally
houses rehabilitated and materials. damaged houses repaired. 2,500,000
constructed.

Page 18 of 19
DISASTER RISK REDUCTION AND MANAGEMENT PLAN (DRRMP) 2021
Municipality of Pinamalayan

Percent of Implementation
LEAD PERFORMANCE Timeline Budgetary OTHER
IMPLEMENTING PARTNERS OUTCOME OUTPUTS ACTIVITIES
AGENCY INDICATORS Beyond 3 Requirements SOURCES
1-7 Days 1-3 mos.
mos.
MEO MDRRMO 4. Disaster and climate 4. Infrastructure facilities 4. Undertake necessary 4. Repair/rehab of
change resilient and restored/rehabilitated rehabilitation or repair of damaged infrastructure 30% of
infrastructure according to safety and damaged infrastructure (c/o LDRRMF
resiliency. MEO).
4.1 Development permits 4.1 Close monitoring and/ or 4.1 No. of application
approved within prescribed tracking of approval of approved within the 30% of
timeline. infrastructure projects and prescribed time (linked to LDRRMF
permit. risk transfer mechanism
and anti-red tape)
MSWDO MHO / MDRRMO 5. A psychologically sound, 5. Vulnerable persons / 5. Develop systems for 5. No. of vulnerable
safe and secured citizenry that families provided with appropriate risk protection persons / families provided
is protected from the effects of adequate appropriate risk measures such as: with adequate and 30% of
disaster able to restore to protection measures. a. stress debriefing appropriate risk protection LDRRMF
normal functioning after each b. counseling / seminar. measures.
disaster

Prepared by: Reviewed by:

MARLO C. ROSALES VINSCENT B. GAHOL


Local Disaster Risk Reduction Officer III PDDRM Officer - Oriental Mindoro

Page 19 of 19