CHKLST-003 SHEET 1 OF 2

REVIEW CHECKLIST FOR PLAN LAYOUT

END CUSTOMER NEA, Nepal


PROJECT TITLE 132KV GIS Rahughat, Nepal
OUR CLIENT Siemens TSO
DRAWING NUMBER & REV NO. 0-G71770-AE552-V021-0 Sheet 1 (R0)
Following points shall be verified by both Preparer and Reviewer and final signed checklist shall be maintained in project folder:
Review Status
SL. (Yes / NA / Deviation no.)
CHECK
NO.
Preparer Reviewer
Number of Bays & Bay sequence are marked and is matching as per Gas
1 Yes Yes
SLD
2 Colour shade indicated and is matching with Gas SLD Yes Yes
3 PD sensor shown at current locations as per PD Configuration rule book Yes D2
Future extension space and module requirements are matching with Gas
4 Yes Yes
SLD
5 Reference drawing table (including Gas SLD / Customer layout) is included Yes Yes
Notes regarding “Compartment accessories, Location of PD Sensors,
6 Yes D3
Maximum weight of gas compartment” are included
7 North symbol is shown as per Customer layout drawing Yes Yes
Reference Axis-X & Y are marked, and all dimensions are linked with these
8 Yes Yes
Axis
Internal clearance between GIS and nearest building wall is marked on all 4
9 Yes Yes
sides
10 CB Removal / maintenance space is clearly marked as per Product type Yes Yes
Phase Assignment table (L1, L2, L3) is included and relation with R, Y, B
11 Yes D2
verified
12 Phase R, Y, B is marked clearly for all bays as per Customer layout NA D2
Phase wise (Indoor + Outdoor) BD length table is included, if applicable.
13 Dimensions are marked in drawing such that it can be verified with the duct NA/D1 OK
lengths indicated in duct length table
Standard IEC Notes “Ventilation requirement & Closed Operating area
14 Yes Yes
safety” are included
15 Minimum clearance table as per IEC is included for projects with Busducts NA D2
16 Bay descriptions are marked near SF6-Air Bushings for Busduct projects NA OK
17 Unloading platform dimensions is marked and is correct as per product type Yes Yes
18 Rolling shutter dimensions is marked and is correct as per product type Yes D2
Section marking is done and is correctly matching with the orientation of
19 Yes Yes
section views
Building Column positions, its clearance from GIS and any possible fouling
20 Yes Yes
with required floor openings are verified
Checked clash detection of GIS model. Ensure during first submission or
21 NA D4
during major change in GIS configuration.
Circuit symbols are added in plan view and configuration verified with SLD.
22 Yes NA
Applicable specially for bus sectionalizers

D1. BD Length was not mentioned in previous submission in Udipur. So Here also the same
has been followed.
D2. Refer comments marked on PDF.
D3. Note regarding maximum weight of gas compartment is missing.
D4. Need to be checked.
Gupta Digitally signed by Gupta
Debasmit
DN: cn=Gupta Debasmit, c=DE, o
=Siemens, email=debasmit.gupta
Debasmit @siemens.com
Debasmit Gupta
Date: 2023.03.07 09:00:37 +05'30' Gulam Quadir
Preparer Reviewer

RC-IN SE GP T SP EXE EN CHKLST-003 Rev. 01