PROJECT TITLE 132kV GIS at UPPTCL Knowledge Park OUR CLIENT (JSP) PK construction DRAWING NUMBER & REV NO. 0-G71770-AE525-S005-0 Sheet 1 (R0) Following points shall be verified by both Preparer and Reviewer and final signed checklist shall be maintained in project folder: Review Status SL. (Yes / NA / Deviation no.) CHECK NO. Preparer Reviewer 1 Number of Bays & Bay sequence matching as per Customer SLD & Offer SLD Yes 2 Bay Serial No. matching with Master list of Bay Numbering Yes 3 Colour shade indicated in SLD and is matching with input in Data Pool Yes 4 CT-VT table is indicated and is matching with BIC Confirmed inputs Yes/D1 5 Extended Current rating is indicated in CT table and is matching with Data Pool Yes 6 Busbar / feeder current ratings are indicated and are matching with Data Pool Yes 7 Short Circuit current rating is indicated and is matching with Data Pool Yes 8 PD sensor shown at current locations as per PD Configuration rule book Yes 9 Future extension requirements verified with Data Pool and is shown accordingly Yes 10 Control Voltage (AC & DC) is matching with the inputs in Data Pool Yes 11 Reference drawing table (including Customer SLD) is included NA 12 CT P1/P2 marking and Core sequence is verified with Customer SLD NA/D2 Gas pressure table is included, and the pressure values are as per DM specified 13 Yes in Data Pool 14 Rating table is included, and the values are verified with Product TD / IEC. Yes 15 Legend table is included, and all equipment’s from main drawing are covered Yes Indoor & Outdoor Temperature table in included, and the values are verified with 16 Yes Data pool 17 Gas compartment designation details are shown and is matching with drawing Yes Notes regarding “Compartment accessories, Location of PD Sensors, Maximum 18 Yes weight of gas compartment” are included 19 Busbar-1/2 with current & voltage ratings are marked in main drawing Yes Gas compartment details are as per Centralized / Decentralized DM, as specified 20 Yes in Data Pool 21 Line / BBM ES / HSES locations are matching with Customer SLD & Offer SLD Yes
Remarks for any deviation point:
D1. We are assuming the same submitted for GOTA(R1), as confirmed by BIC. D2. It is Verified from BIC factory as submitted for GOTA(R1).