Perform Roughing – in Activities, Wiring and cabling works for single – phase distribution, power,

lighting and auxiliary systems


72 hours
STUDY GUIDE

Prepared by: Josh Assiel Jeih V. Cabansag

INTRODUCTION: This unit covers the knowledge, skills and attitudes on installing electrical metallic
and non-metallic conduit, wire ways and cable clamp, auxiliary terminal cabinet and
distribution frame panel board/ safety switch and used in roughing – in based on the
required performance standards.

This unit also covers the outcomes required in preparing for cable pulling and
installation, performing wiring and cabling lay-out and notifying completion of work
for single – phase distribution, power, lighting and auxiliary systems.

OBJECTIVES

At the end of this module, you should be able to:


1. Install electrical metallic/ non- metallic (PVC conduit)
2. Install wire ways and cable trays
3. Install auxiliary terminal cabinet and distribution panel
4. Prepare for cable pulling and installation
5. Perform wiring and cabling lay out

KEY CONCEPTS

UNIT 1:
Install electrical metallic /nonmetallic (PVC conduit)

 Interpret electrical wiring diagrams and mechanical drawings


 Identify proper usage and types of conduits, fittings in electrical installation
 Identify technique of installation and bending of conduit and fitting.
 Apply proper usage of safety harness.
 Interpret plan and details drawing.
 Practice proper handling of materials, tools and equipment
 Practice procedure in proper bending of conduits
 Practice procedure in Installing conduits
 Perform the installation economically

UNIT 2:
Install wire ways and cable tray

 Identify use of materials, tools and equipment


 Interpret electrical/mechanical drawing
 Determine suitability for installation and used of bus way, cable tray, fittings and panels, conformity
with the provision of the PEC Code
 Practice wire way and cable tray installation
 Practice proper use of safety harness (PPE)
 Interpret technical plan
 Use effective communication skills (written and oral)
 Practice effective use of measuring tape
 Perform the installation economically

UNIT 3:
Install auxiliary terminal cabinet and distribution panel

 Determine blue print reading and materials specification.


 Read proper proofing standards
 Perform proper procedure in installation of auxiliary terminal cabinet and distribution panel.
 Apply proper use of safety harness (PPE).
 Interpret technical plan
 Practice effective use of measuring devices
 Practice proper handling of tools and equipment
 Install terminal cabinet and distribution panel
 Perform the installation economically.

UNIT 4:
Prepare for cable pulling and installation

 Read and familiarize:


 Mensuration
 Blue print reading and materials specification.
 Uses of wires, cables and tools
 Required sizes of cable based on PEC Wire Table
 Prepare cable for installation
 Interpret technical plan and drawing.
 Practice effective use of measuring tapes
 Practice proper handling of tools and equipment
 Apply methods and techniques in various type of wiring wires and cables.

UNIT 5:
Perform wiring and cabling lay out

 Read and familiarize:


 Mensuration
 Blue print reading and materials specification
 Application of pulling compound
 Methods in cable pulling
 Interpret technical plan and drawing.
 Apply methods in cable pulling
 Follow procedures in bending radius and loop tolerances for cables.

LEARNING RESOURCES
1. Self-paced Learning Materials uploaded in LMS (Interactive Book-type lessons, H5Ps,
Online presentations, etc.)
2. Webinars
3. Demonstration Videos
4. Lecture Videos
5. Task Sheets and Performance Criteria Checklist

STUDY QUESTIONS
Unit 1:
Install electrical metallic/ non-metallic (PVC Conduit)
1. What are the different types of electrical conduits?
2. When performing a wiring installation, what materials did you ready first?
3. What are the uses and applications of different types of electrical conduits?

Unit 2:
Install wire ways and cable tray
1. What is Wire Ways and Cable Tray?
2. What is the purpose of Wire Ways and Cable Tray?
3. Applications of Wire Ways and Cable Tray?

Unit 3:
Install auxiliary terminal cabinet and distribution panel
1. What is Auxiliary Terminal Cabinet and Distribution Panel?
2. How to install Auxiliary Terminal Cabinet and Distribution Panel?
3. How to use Auxiliary Terminal Cabinet and Distribution Panel?

Unit 4:
Prepare for cable pulling and installation
1. What are the different types of cables?
2. What tools and equipment when performing cable pulling?
3. What procedure when performing cable pulling?

Unit 5:
Prepare wiring and cabling lay out
1. What is symbol and their purpose in electrical plan?
2. What is blueprint and usage?
3. How to read electrical plan?

ACTIVITIES (Include Online and Offline activities)

A. Online Activities
1. Orientation
a. Attend the Trainees Induction Program to be held via Google Meet Webinar on July 26, 2020,
08:00 AM: https://meet.google.com/hvv-xhgy-zae?authuser=0
b. Access the LMS (Learning Management System),
https://ptctarlacxfelsr3.gnomio.com/course/view.php?id=44 and read the Study Guide.
c. Participate in the Discussion forum (Self – Introduction)
d. Take the Pre-test
e. Based on your assigned Learning Outcome, meet with your facilitators and groupmates,

2. Daily Google Meet Webinars (08:00 AM) – Attendance is checked

3. Activities
a. Read eLearning contents in books and presentations
b. Play videos
c. Use interactive eLearning materials
d. Take Quizzes; (Graded)
e. Participate in Forums; (Required)

Note: A Certificate of Completion shall be awarded to those who participated in all


forum discussions and pass the quizzes and post test

B. Offline Activities

1. Workshops (Individual and group) – creating/enhancing the eLearning environment


a. The participant shall:
- Practice proper using of tools and proper wearing of PPE’s
- Practice correct applications of electrical materials
- Interpret electrical plans and drawings
- Applying techniques and methods in various electrical installations
b. The participant shall refer to the task sheet uploaded in the training site for his/her
Hands-on exercises
c. The participant shall compare his/her performance with the performance criteria checklist
d. He/ She will practice good house keeping
e. The individual shall observe safety, not only in wok, but also follow the IATF rules and
regulations

2. Institutional Assessment
a. Computer -based test
b. Demonstration with questioning (Face to Face)

Important skills to be learned:


 Interpret electrical plans and drawings
 Effective identifying different kinds of electrical materials
 Handling of electrical materials, tools and equipment
 Effective communicating skills
 Applying techniques and methods in various electrical installations

STUDY SCHEDULE
Please refer to the schedule for your reference

DATE/PERIOD TOPICS ACTIVITY VENUE AND NO OF


TIME HOURS
July 26, 2020 Orientation Face to Face: Audio Vistual 2 Hours
to the • Lecture on Digital Room 8:00 AM
blended Literacy
learning • School Policies
program • Class Discussion
• Lecture on Netiquette
Recognition Online: Computer 1.5 Hours
of Prior • Registration to LMS Laboratory
Learning • Enrollment to 1:00 PM
Online Module
Watch Video: Basic
Navigation of LMS
• Watch “Module
Introduction Video”
• Participate in the
Discussion Forum “Me,
My Self , and I”
• Take Pretest (Self
assessment)
Face to Face: Audio Vistual 1.5 Hours
• Feed backing Room 4:00 PM
July 27, 2020 Unit 1: Install  Read the Online LMS 1 Hours
metallic/non- information Sheet (Training Site)
metallic 1.1-1 uploaded in
(PVC) LMS on interpret
conduit circuit diagram
 Watch Video Link
 Take Quiz 1.1-1
 Read the Online LMS 1 Hours
information Sheet (Training Site)
1.1-2 uploaded in
LMS on types of
electrical conduit
 Watch Video Link
 Take Quiz 1.1-2
 Read the Online LMS 1 Hours
information Sheet (Training Site)
1.1-3 uploaded in
LMS on identify
different types of
bends
 Watch Video Link
 Take Quiz 1.1-3
 Read the Online LMS 2 Hours
information Sheet (Training Site)
1.1-4 uploaded in
LMS on practice
procedure in
bending of conduit
 Watch Video Link
 Take Quiz 1.1-4
July 28, 2020  Observe EIM Practical 2 Hours
demonstration 1.1.- Work Area
4-1 on proper (Face to Face)
bending of non-
metallic (PVC)
conduit (90⁰ Bend)
 Observe EIM Practical 2 Hours
demonstration 1.1.- Work Area
4-2 on proper (Face to Face)
bending of non-
metallic (PVC)
conduit (Offset
Bend)
 Observe EIM Practical 2 Hours
demonstration 1.1.- Work Area
4-3 on proper (Face to Face)
bending of metallic
conduit (90⁰ Bend)
 Observe EIM Practical 2 Hours
demonstration 1.1.- Work Area
4-4 on proper (Face to Face)
bending of metallic
conduit (Offset
Bend)
July 29, 2020  Read the Online LMS 2 Hours
information Sheet (Training Site)
1.1-5 uploaded in
LMS on prepare
pipes for
installation
 Take Quiz 1.1-5
 Read the Online LMS 2 Hours
information Sheet (Training Site)
1.1-6 uploaded in
LMS on cutting
thread using
conduit stock and
dies
 Take Quiz 1.1-6
 Watch Video Link
 Observe EIM Practical 3 Hours
demonstration 1.1.- Work Area
6 on cutting thread (Face to Face)
using conduit stock
and dies
July 30, 2020  Read the Online LMS 2 Hours
information Sheet (Training Site)
1.1-7 uploaded in
LMS on PEC
provision on
electrical non-
metallic conduit
 Take Quiz 1.1-7
 Read the Online LMS 2 Hours
information Sheet (Training Site)
1.1-8 uploaded in
LMS on practice
procedure in
installing PVC
conduit
 Take Quiz 1.1-8
 Watch Video Link
 Observe EIM Practical 3 Hours
demonstration 1.1.- Work Area
8 on cutting thread (Face to Face)
using conduit stock
and dies
July 31, 2020 Unit 2: Install  Read Information 1.5 Hours
Wireways Sheet 1.2-1 on
and Cable Symbols and
Trays Drawings of
Wireways and
Cable Trays
 Answer Quiz 1.2-1
(Online) EIM
 Read Information 1.5 Hours
LMS site
Sheet 1.2-2 on
8:00 am -
Types of Wireways
11:00 pm
and Cable Tray
parts and
components
 Read/Download
PDF file on
wireways and
cable trays
 Answer Quiz 1.2-2
 Watch video link EIM Practical 2 Hours
on how to install Work Area
wireways and (Face to Face)
Cable trays 12:00 pm -
 Perform Task 4:00 pm
Sheet 1.2-3
“Fabricating
wireway and cable
tray” - (To be
performed after
Learner passed
Quiz 1.2-1 & 1.2-2)
 Watch video link 1 Hour
on Construction
safety procedures (Online) EIM
(OSHA video) LMS site
 Read Information 4:00 pm –
Sheet 1.2-4 on 5:00 pm
Ladder Safety
 Answer Quiz 1.2-4
August 3, 2020 Unit 3: Install  Watch video on LMS 2 hours
Auxiliary “How to Interpret
Terminal Drawing and
Cabinet and Plans”
Distribution  Take Quiz 1 LMS
Panel  Read Presentation
Lesson on: “Use of
wires,cables and
tools in the
installation of
Auxiliary Terminal
cabinet and LMS
distribution panel”
 Take Quiz 2
 Read Presentation
Lesson on
“Different types of LMS
electrical
distribution
panel/frame”
 Take Quiz 3 LMS
 Watch video on
“Installation of
terminal cabinet
and distribution
panel”
 Read Presentation
Lesson on
Installation of
auxiliary terminal
EIM Practical 2 hours
cabinet and
Work Area
distribution panel
(Face to Face)
 Watch video on
“proper use of
safety harness in
the installation of
terminal cabinet
and distribution
panel”
 Take Quiz 4
 Actual Installation
of terminal cabinet
and distribution
panel
August 4, 2020 Unit 4:  Online: Home : EIM Practical 3 hours
Prepare  read book Work Area
cable Pulling (Face to Face)
and  Feeding in wires
Installation  watch video
 Attend a webinar
 download PDF file
 Download task
sheet
 how to feed wires
in a conduit
 Answer
Assignment 1.1
 Read information
sheet (cable
Pulling)
 Completion of
activity
 watch video in
cable pulling
August 5, 2020 Unit 5:  Online: Home 3 hours
Perform work
wiring and  Read “Lesson
cabling lay 1.5-1Wiring
out Procedure such as
Cable Lay-out,
Pulling Splicing
and Termination of
Wire”
 Watch Video 1
 Complete Activity
No. 1.5-1_Name
the types of Splice
 Read Book 1_:
Uses of Different
Types of Wires and
Cables.
 Complete Activity
No _1.-5-2Name
the Uses of
Different Wires and
Cables’
 Read Lesson 1.5-
2 Marking of Circuit
Homerun
 Complete Activity
No 1.5-2How to
mark the home run
in a circuit.
 Read Lesson 1.5-3
Application of
Pulling Compound.
 Complete Activity
No1.5-3_List down
the importance of
Pulling Compound
 Read Lesson 1.5-4
Bundling of Wire
Size
 Answer
Assignment No.
_1.5-4Computation
of Wire Bundes for
Different Size
Wires

August 6, 2020 Perform Online Computer Computer 2 Hours


Roughing-In Laboratory Laboratory
Activities for • Take Post Test 8:00 AM/
single phase Group 1
distribution, Online Computer Computer 2 Hours
wiring and Laboratory Laboratory
cabling works • Take Post Test 8:00 2nd
of Power, Group
August 7, 2020 Lighting and Face to Face : EIM Practical 2 hours
Auxilliary • Install Metallic, Non Work Area
Systems. Metallic Conduit and (Face to Face)
Mouldings 8:00 AM 10:00
AM / Group 1
Face to Face : EIM Practical 2 hours
• Install Metallic, Non Work Area
Metallic Conduit and (Face to Face)
Mouldings 11:00 AM
12:00 PM/
Group 2
August 10, 2020 Face to Face: EIM Practical 2 hours
Install Wireways and Work Area
Cable Trays (Face to Face)
1:00 PM 3:00
PM/ Group1
Perform Face to Face: EIM Practical 2 hours
Roughing-In Install Wireways and Work Area
Activities for Cable Trays (Face to Face)
single phase 3:00 PM-5:00
distribution, PM/ Group 2
August 11, 2020 wiring and Face to Face: EIM Practical 2 hours
cabling works Install Auxiliary Terminal Work Area
of Power, Cabinet and Distribution (Face to Face)
Lighting and Panel 8:00 AM-10:00
Auxilliary AM/ Group 1
Systems. Face to Face: EIM Practical 2 hours
Install Auxiliary Terminal Work Area
Cabinet and Distribution (Face to Face)
Panel 11:00 AM-
12:00 PM/
Group 2
Face to Face: EIM Practical 2 hours
Prepare cable Pulling Work Area
and Installation (Face to Face)
1:00 PM-3:00
PM/ Group 1
Face to Face: EIM Practical 2 hours
Prepare cable Pulling Work Area
and Installation (Face to Face)
3:00 PM-5:00
PM/ Group 2
August 12, 2020 Face to Face: EIM Practical 2 hours
Perform wiring and Work Area
cabling lay out (Face to Face)
8:00 AM-10:00
AM/ Group 1
Face to Face: EIM Practical 2 hours
Perform wiring and Work Area
cabling lay out (Face to Face)
11:00 AM-
12:00 PM/
Group 2

REFERENCES:
1. E-Training Regulations on Electrical Installation and Maintenance NCII
2. CBLM on Perform roughing-in, wiring and cabling works for single-phase distribution, power,
lighting and auxiliary systems
3. Online Researches, Journals/Articles