You are on page 1of 4

Project : CONSTRUCTION OF ROOF DECK

Location : SCIENCE CITY OF MUNOZ, NUEVA ECIJA


Owner : BRO. FELIX MANNALON
Subject : Bill of Materials and Cost Estimate

SCOPE OF WORKS
Description Qty Unit Unit Cost Amount

3.0 TEMPORARY FACILITY,


MOBILIZATION/DEMOBILIZATION 1.00 lot 0.00

1.0 EARTHWORKS
A. Excavation 0.00 m3 0.00 0.00
B. Backfill 0.00 m3 0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00

2.0 COLUMN FOOTING FOR COLUMN BASE


A. Portland Cement 18.00 bags 0.00 0.00
B. Washed Sand (S1) 1.00 elf 0.00 0.00
C. Crushed Gravel (3/4") 1.00 elf 0.00 0.00
D. 12mm dia x 6m RSB 20.00 pcs 0.00 0.00
E. #16 G.I. Tie Wire 3.00 kg 0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00

3.0 COLUMN (16 COLUMNS)


A. Portland Cement 5.00 bags 0.00 0.00
B. Washed Sand (S1) 1.00 elf 0.00 0.00
C. Crushed Gravel (3/4") 1.00 elf 0.00 0.00
D. 12mm dia x 6m RSB 13.00 pcs 0.00 0.00
E. 10mm diax 6m RSB 12.00 pcs 0.00 0.00
F. #16 G.I. Tie Wire 3.00 kg 0.00 0.00
G. Formworks and Scaffoldings for Column 12.80 m 2
0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00
Project : CONSTRUCTION OF ROOF DECK
Location : SCIENCE CITY OF MUNOZ, NUEVA ECIJA
Owner : BRO. FELIX MANNALON
Subject : Bill of Materials and Cost Estimate

7.0 GROUND FLOOR SLAB


A. Portland Cement 200.00 bags 0.00 0.00
B. Washed Sand (S1) 5.00 elf 0.00 0.00
C. Crushed Gravel (3/4") 10.00 elf 0.00 0.00
D. 10mm diax 6m RSB 147.00 pcs 0.00 0.00
E. #16 G.I. Tie Wire 10.00 kg 0.00 0.00
F. 2x6x1.2 C-Purlins Formworks 6.00 pcs 0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00

15.0 TRUSSES
A. 2" x 4" x 6mm Channel Bar 47.00 pcs 0.00 0.00
B. 2" x 2" x 1/4 x 6.0m Angle bar 34.00 pcs 0.00 0.00
C. 1 1/2" x 1 1/2" x 1/4" x 6.0m angle bar 10.00 pcs 0.00 0.00
C. 1 1/2" x 1 1/2" x 3/16" x 6.0m angle bar 12.00 pcs 0.00 0.00
D. 2"x3"x1.5mm x 6.0m c-purlin 53.00 pcs 0.00 0.00
D. 2"x2"x1.5mm x 6.0m c-purlin 26.00 pcs 0.00 0.00
E. welding rod 8.00 boxes 0.00 0.00
F. red/gray oxide primer 15.00 gal 0.00 0.00
G. cut off disc 10.00 pcs 0.00 0.00
H. paint brush 5.00 pcs 0.00 0.00
I. hacksaw blade 5.00 pcs 0.00 0.00
J. paint thinner 6.00 gal 0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00

16.0 ROOFS
A. Long Span Rib Type Roof (0.4mm x 1.2m) 326.00 l.m. 0.00 0.00
C. Flashing 20.00 pcs 0.00 0.00
D. Vulca Seal 10.00 li 0.00 0.00
F. Tekscrew (12mmx65mm) 3,000.00 pcs 0.00 0.00
G. Drill Bit (3/16mm) 5.00 pcs 0.00 0.00
H. Ridge Roll 6.00 pcs 0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00

TOTAL ESTIMATED PROJECT COST P #REF!


Project : CONSTRUCTION OF CONTAINER WAREHOUSE
Location :
Owner : VIRGILIO GARCIA
Subject : Bill of Materials and Cost Estimate

SCOPE OF WORKS
Description Qty Unit Unit Cost Amount

1.0 TEMPORARY FACILITY,


MOBILIZATION/DEMOBILIZATION 1.00 lot 0.00

2.0 EARTHWORKS
A. Excavation 0.00 m3 0.00 0.00
B. Backfill 0.00 m3 0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00

3.0 COLUMN FOOTING FOR COLUMN BASE


A. Portland Cement 22.00 bags 0.00 0.00
B. Washed Sand (S1) 1.00 elf 0.00 0.00
C. Crushed Gravel (3/4") 1.00 elf 0.00 0.00
D. 12mm dia x 6m RSB 24.00 pcs 0.00 0.00
E. #16 G.I. Tie Wire 5.00 kg 0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00

4.0 COLUMN (16 COLUMNS)


A. Portland Cement 6.00 bags 0.00 0.00
B. Washed Sand (S1) 1.00 elf 0.00 0.00
C. Crushed Gravel (3/4") 1.00 elf 0.00 0.00
D. 12mm dia x 6m RSB 16.00 pcs 0.00 0.00
E. 10mm diax 6m RSB 15.00 pcs 0.00 0.00
F. #16 G.I. Tie Wire 5.00 kg 0.00 0.00
G. Formworks and Scaffoldings for Column 15.36 m 2
0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00
Project : CONSTRUCTION OF CONTAINER WAREHOUSE
Location :
Owner : VIRGILIO GARCIA
Subject : Bill of Materials and Cost Estimate

5.0 GROUND FLOOR SLAB


A. Portland Cement 240.00 bags 0.00 0.00
B. Washed Sand (S1) 6.00 elf 0.00 0.00
C. Crushed Gravel (3/4") 12.00 elf 0.00 0.00
D. 10mm diax 6m RSB 177.00 pcs 0.00 0.00
E. #16 G.I. Tie Wire 12.00 kg 0.00 0.00
F. 2x6x1.2 C-Purlins Formworks 10.00 pcs 0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00

6.0 TRUSSES
A. 2" x 4" x 6mm Channel Bar 57.00 pcs 0.00 0.00
B. 2" x 2" x 1/4 x 6.0m Angle bar 41.00 pcs 0.00 0.00
C. 1 1/2" x 1 1/2" x 1/4" x 6.0m angle bar 12.00 pcs 0.00 0.00
D. 1 1/2" x 1 1/2" x 3/16" x 6.0m angle bar 15.00 pcs 0.00 0.00
E. 2"x3"x1.5mm x 6.0m c-purlin 64.00 pcs 0.00 0.00
F. 2"x2"x1.5mm x 6.0m c-purlin 32.00 pcs 0.00 0.00
G. welding rod 10.00 boxes 0.00 0.00
H. red/gray oxide primer 15.00 gal 0.00 0.00
I. cut off disc 10.00 pcs 0.00 0.00
J. paint brush 5.00 pcs 0.00 0.00
K. hacksaw blade 5.00 pcs 0.00 0.00
L. paint thinner 6.00 gal 0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00

7.0 ROOFS
A. Long Span Rib Type Roof (0.4mm x 1.2m) 391.20 l.m. 0.00 0.00
B. Flashing 24.00 pcs 0.00 0.00
C. Vulca Seal 10.00 li 0.00 0.00
D. Tekscrew (12mmx65mm) 3,000.00 pcs 0.00 0.00
E. Drill Bit (3/16mm) 5.00 pcs 0.00 0.00
F. Ridge Roll 6.00 pcs 0.00 0.00

Material Cost 0.00


Labor Cost 0.00
TOTAL 0.00

TOTAL ESTIMATED PROJECT COST P