You are on page 1of 2
Office of the Chief General Manager BSNL Uttarakhand Circle areianfermteties Patel Nagar Telephone Exchange pata rae) 259 Building, Dehradun / SHARAT SANCHAR NIGAM LIMITED Ph 2628050, & (Gi of Ua eps) En: 9113S 2623080 sam_ual@bsneo.in No: URD CGMOSD CM/2025-2472 alo Sub: Minutes of meeting dated 24!" Jul Uttarakhand with CM vertical head, \ mecting chaired by Hon'ble CGM Uttarakhand was held with vertical head of CM along vith OffcersStaff on 24.07.2023 t0 review the progress of 4G Phase ~ IX.2 and 4G Saturation Projects, Nework a and other CM parameters. The follow 1. Sh Om Prakash Kanaufia, GM (CM) Sh Rajesh Phonia, DGM (CM) Sh Nishchal Agrawal, DE (NSS) . Sh Sanjay Uniyal, AGM (Tech) Ratan, SDE (MSC) 6. Sh Digamber. SDE (BSS) 7. Sh Salim Akhtar. SDE (CAF) 8. Sh Tarun Arora, SDE (O&M) 9. Ms Yashoda Gwal. SDE (RAN) 10. Mrs Varsha Nautiyal. SDE (PG & RTI) U1. Mrs Shini Sreedharan, SDE (O&M-IID) 12. Sh Vipul Dimri, SDE (O&M-I1) 13, Sh Naveen Kumar, JTO (Planni 14. Sh Jotendra Singh, JTO (Infra) 15. Sh Satish Purohit, JTO (NSS) Following are the salient points of the meeting: 2023 held by Hon'ble CGMT Responsible ; Officers fo | eel Monitoring/ Action | to be tal ‘warding 4G Phase — IX2 and 4G Saturation Projects, close monitoring and coordination by Circle CM team with SN Point of Discussion 4G Phase ~ IX.2 and i Gaican, BAJOA teams is required for land allotment status, OFC : 2 aaa | tender status, EB connection status. work progress status, | POM(CM) & their Projects team site handover for tower foundation work. tower erection ' work etc. that needs to be completed as per the deadline. ] Purchase order to M/s TCS for Core (Hardware) in all | Zones & RAN in North, South and west Zones have been ued. Now it is necessary to have a dedicated planning to | roll out the project. In this reference. Hon'ble CGMT has directed that a meet MCN) ng should be called by Cirele CM team | DGAMC\L) cuss the details of Core equipments a ) along with one SDE shall i vliar with new 4G equipments ete | 2. | Meeting with M/s TCS | Chandigarh to gett Scanned with CamScanner Office of the Chie General Manager aneereiarefarrtertties / (anleel ateepkeebl Sct) BIARAT SANCHAR NIGAM LIMITED. EA Cantal fn terprise) should be made for the improvement of mobile service in Uttarakhand Hon'ble CGM hus direeted that long pending FEC ith | Gye, 8 | FEC Mecting BRMO should he completed at earfest as with other TSPS ibis | Garon already over. = eee | To maintain network availablity, striet monitoring and] Gxcayy | coordination by Circle CM team with BA/OA teams is] SGM) 4 | Network Avaitabitity | required for restoration of BITS Faults SDE (O&M-1) | Circle team shall ensure no fault should go beyond 3]. siye gent) days in any ease. tn order to inerease the revenue from CM vertical in the current | gaye | Gmicmy s | Tom nancial year TO (Inffa)'DGM (CMy'GM (CM) shall ensure to | sey 5 | Foneruened out | fem so Je diay (CMC CMY tal rare) DMC each BA pet month) and Yearly target 25 towers. | To provide better mobile services in Kuanwala area and on | — Gxycy : omen) i Dehradan ~ Mussoorie h 10 (InliaDGM (CM) shall | 6 eee ewe arf BaMcM SDIPL for hiring a site near Mussoorie hil ithe sites suitable, : In order to provide 4G SIMs to all the existing customers having 2G & 3G SIMs, DE (NSS) shall arrange HLR. profile for Pi leene Untarakhand Cirele subscriber base so that 2GI/3G customers can : 7 | Provision of 1G SIMS | 4. provided 4G SIMs, Then S&D Cell shal proceed further to | DECNSS) make necessary arrangement forthe conversion of existing 2G & | 3G SIMs into 4G SIMs, All parameters of Mobile equipments like MSC level, CCR, | ecau sector wise coverage. VSWR alarms shall be monitored by ae Mobile Equipment Syne NSS ap | Mobi Eames SDE (MSC) / DE (NSS) on regular basis and all-out effort | gor \ree) | Note: GM (CM), DGM (CM). DE (NSS) & all their officers/stal? should strive hard to achieve the targets as discussed besides should take initiative so as to make visible changes in the overall output of CM unit. In nest meeting the performance of each & individual officer will be evaluated. ‘The next meeting will be held on 22.08.2023. This is issued with the approval of competent authority AGM (HH \UKND Telecom Cirele Dehradun Ol CGM Scanned with CamScanner

You might also like