Sub: Minutes of meeting dated 24!" Jul
Uttarakhand with CM vertical head,
\ mecting chaired by Hon'ble CGM Uttarakhand was held with vertical head of
CM along vith OffcersStaff on 24.07.2023 t0 review the progress of 4G Phase ~ IX.2
and 4G Saturation Projects, Nework a
and other CM parameters. The follow
1. Sh Om Prakash Kanaufia, GM (CM)
Sh Rajesh Phonia, DGM (CM)
Sh Nishchal Agrawal, DE (NSS)
. Sh Sanjay Uniyal, AGM (Tech)
Ratan, SDE (MSC)
6. Sh Digamber. SDE (BSS)
7. Sh Salim Akhtar. SDE (CAF)
8. Sh Tarun Arora, SDE (O&M)
9. Ms Yashoda Gwal. SDE (RAN)
10. Mrs Varsha Nautiyal. SDE (PG & RTI)
U1. Mrs Shini Sreedharan, SDE (O&M-IID)
12. Sh Vipul Dimri, SDE (O&M-I1)
13, Sh Naveen Kumar, JTO (Planni
14. Sh Jotendra Singh, JTO (Infra)
15. Sh Satish Purohit, JTO (NSS)
Following are the salient points of the meeting:
2023 held by Hon'ble CGMT
Responsible
; Officers fo
| eel Monitoring/ Action
| to be tal
‘warding 4G Phase — IX2 and 4G Saturation Projects,
close monitoring and coordination by Circle CM team with
SN Point of Discussion
4G Phase ~ IX.2 and i Gaican,
BAJOA teams is required for land allotment status, OFC :
2 aaa | tender status, EB connection status. work progress status, | POM(CM) & their
Projects team
site handover for tower foundation work. tower erection '
work etc. that needs to be completed as per the deadline.
] Purchase order to M/s TCS for Core (Hardware) in all
| Zones & RAN in North, South and west Zones have been
ued. Now it is necessary to have a dedicated planning to
| roll out the project. In this reference. Hon'ble CGMT has
directed that a meet
MCN)
ng should be called by Cirele CM team | DGAMC\L)
cuss the details of Core equipments a
) along with one SDE shall i
vliar with new 4G equipments ete |
2. | Meeting with M/s TCS
| Chandigarh to gett
Scanned with CamScannerOffice of the Chie General Manager
aneereiarefarrtertties
/ (anleel ateepkeebl Sct)
BIARAT SANCHAR NIGAM LIMITED.
EA Cantal fn terprise)
should be made for the improvement of mobile service in
Uttarakhand
Hon'ble CGM hus direeted that long pending FEC ith | Gye,
8 | FEC Mecting BRMO should he completed at earfest as with other TSPS ibis | Garon
already over.
= eee
| To maintain network availablity, striet monitoring and] Gxcayy
| coordination by Circle CM team with BA/OA teams is] SGM)
4 | Network Avaitabitity | required for restoration of BITS Faults SDE (O&M-1)
| Circle team shall ensure no fault should go beyond 3]. siye gent)
days in any ease.
tn order to inerease the revenue from CM vertical in the current | gaye |
Gmicmy
s | Tom nancial year TO (Inffa)'DGM (CMy'GM (CM) shall ensure to | sey
5 | Foneruened out | fem so Je diay (CMC CMY tal rare) DMC
each BA pet month) and Yearly target 25 towers. |
To provide better mobile services in Kuanwala area and on | — Gxycy
: omen)
i Dehradan ~ Mussoorie h 10 (InliaDGM (CM) shall |
6 eee ewe arf BaMcM
SDIPL for hiring a site near Mussoorie hil ithe sites suitable, :
In order to provide 4G SIMs to all the existing customers having
2G & 3G SIMs, DE (NSS) shall arrange HLR. profile for
Pi leene Untarakhand Cirele subscriber base so that 2GI/3G customers can :
7 | Provision of 1G SIMS | 4. provided 4G SIMs, Then S&D Cell shal proceed further to | DECNSS)
make necessary arrangement forthe conversion of existing 2G &
| 3G SIMs into 4G SIMs,
All parameters of Mobile equipments like MSC level, CCR, |
ecau sector wise coverage. VSWR alarms shall be monitored by ae
Mobile Equipment Syne NSS
ap | Mobi Eames SDE (MSC) / DE (NSS) on regular basis and all-out effort | gor \ree) |
Note: GM (CM), DGM (CM). DE (NSS) & all their officers/stal? should strive hard to achieve the
targets as discussed besides should take initiative so as to make visible changes in the overall output
of CM unit. In nest meeting the performance of each & individual officer will be evaluated. ‘The
next meeting will be held on 22.08.2023.
This is issued with the approval of competent authority