INFORMASI PRODUKSI PERIODE JULI 2023

31 START 1-Jul-23 PLAN PRODUKSI SITE SENTUK ACTUAL ACH(%) PRODUCTIVITY EXCA OVERBURDEN - SENTUK
Remain Target MTD Remain Days (Sentuk) Target Prod/ Days
FINISH 31-Jul-23 OB 4.364.649,96 4.987.401 114% EXCAVATOR PLAN SHIFT 1 SHIFT 2 DAILY ACH MTD ACH
END OF DATE 31-Jul-23 COAL 332.488 364.313 110% - - - E2000 (OB) 850 868,3 871,0 869,6 102,3% 843,1 99,2%
SR 13,13 13,69 96% - - - E2000 (MUD) 680 - - - 0,0% - 0,0%
E1250 (OB) 550 580,8 552,8 567,0 103,1% 541,9 98,5%
DAILY MTD YTD E1250 (MUD) 400 - - - 0,0% 370,5 92,6%
SITE SENTUK
PLAN ACTUAL ACH (%) PLAN ACTUAL DEV ACH (%) PLAN ACTUAL ACH (%) E500 260 206,6 228,6 218,5 84,0% 253,3 97,4%
OB 142.445 179.134,40 125,76% 4.364.650 4.987.400,85 622.751 114,27% 38.608.858 38.584.440 99,94% HD785 111 122,0 119,1 120,6 108,6% 110,3 99,4%
COAL 10.696 11.445,25 107,01% 332.488 364.313,33 31.826 109,57% 2.575.503 2.646.188 102,74% DT OB 29 22,9 26,3 24,6 84,9% 26,0 89,5%
SR 13,32 15,65 85,09% 13,13 13,69 19,57 95,89% 14,99 14,58 102,81%

SNTK SNTK
WEATHER SITE SENTUK PLAN DAILY WEATHER SITE SENTUK PLAN MTD
ACT DAILY ACH ACT MTD ACH
RAIN 1,73 - 0% RAIN 53,78 29,73 55%
SLIPPERY 0,69 - 0% SLIPPERY 21,51 17,63 82% PRODUCTIVITY EXCA COAL
HAZE 0,35 - 0% HAZE 10,76 13,93 130% EXCAVATOR PLAN SHIFT 1 SHIFT 2 DAILY ACH MTD ACH
CUST PROBLEM - - 0% CUST PROBLEM - - 0% E500 250 - - - 0,0% - 0,0%
% Slippery dari Hujan 59,3% E300 205 188,7 206,3 196,8 96,0% 208,3 101,6%

IP ABP/MTK/BKS/SST LKCT IP ABP/MTK/BKS/SST LKCT


WEATHER HAULING PLAN MTD WEATHER HAULING PLAN DAILY
ACT MTD ACH ACT MTD ACH ACT MTD ACH ACT DAILY ACH ACT DAILY ACH ACT DAILY ACH
RAIN 63,71 - 0% 15,27 24% 39,43 62% RAIN 2,06 - 0% - 0% - 0%
SLIPPERY 25,48 - 0% 3,98 16% 39,73 156% SLIPPERY 0,82 - 0% - 0% - 0%
HAZE 19,11 - 0% 11,82 62% 14,98 78% HAZE 0,62 - 0% - 0% - 0%
ROM CROWDED - 0% - 0% - 0% ROM CROWDED - 0% - 0% - 0%
CUST PROBLEM - 0% 33,58 0% - 0% CUST PROBLEM - 0% - 0% - 0%
DEMO - 0% - 0% - 0% DEMO - 0% - 0% - 0%

S1 SENTUK S2 SENTUK

UNIT MATERIAL DISTANCE PROD (BCM) WH PDTVY LOCATION REMARKS PROBLEM REMARKS DELAY PA S1 & S2 UNIT MATERIAL DISTANCE PROD (BCM) WH PDTVY LOCATION REMARKS PROBLEM REMARKS DELAY

E52001 BL 2,60 430,00 - - SSTK PC BREAKDOWN 54,2% E52001 BL 2,60 7.740,00 8,00 967,5 SSTK
MATERIAL KERAS ORI, PERBAIKAN FRONT,
E52005 BL 3,80 7.439,00 9,00 826,6 SSTK 96,8% E52005 BL 3,50 6.493,00 10,00 649,3 SSTK PEMBENTUKAN FRONT BARU

E52006 BL 3,70 7.052,00 8,00 881,5 SSTK 96,1% E52006 BL 3,30 7.181,00 8,00 897,6 SSTK
E52007 BL 3,70 8.342,00 9,00 926,9 SSTK 54,6% E52007 - - - - - SSTK
E52008 BL 3,90 7.009,00 9,00 778,8 SSTK MATERIAL BOULDER WAIT PENGUKURAN SURVEY 100,0% E52008 BL 3,70 6.880,00 8,00 860,0 SSTK
E52013 OB 2,70 7.912,00 8,00 989,0 SSTK PC BREAKDOWN 97,5% E52013 OB 2,80 8.213,00 9,00 912,6 SSTK
PC BREAKDOWN & WAIT PENGUKURAN
E52014 BL 3,30 6.966,00 9,00 774,0 SSTK MATERIAL KERAS ORI &TRAVEL BLASTING
SURVEY
99,5% E52014 BL 2,90 7.912,00 8,00 989,0 SSTK
E51201 OB & TS 3,20 5.461,00 10,00 546,1 SSTK WAIT HAULER & WAIT PENGUKURAN SURVEY 100,0% E51201 Soil 2,90 5.160,00 9,00 573,3 SSTK
PC BREAKDOWN & WAIT PENGUKURAN
E51206 OB 2,90 2.709,00 6,00 451,5 SSTK TRAVEL BLASTING
SURVEY
79,1% E51206 OB 3,00 5.031,00 9,00 559,0 SSTK
E51208 BL 3,70 5.418,00 9,00 602,0 SSTK 82,0% E51208 BL 3,50 2.494,00 6,00 415,7 SSTK FRONT BERAIR, MATERIAL KERAS ORI

E51209 BL 3,90 5.719,00 9,00 635,4 SSTK 99,2% E51209 BL 3,50 5.289,00 9,00 587,7 SSTK
E51211 BL 3,20 6.106,00 9,00 678,4 SSTK 100,0% E51211 BL 2,80 5.031,00 9,00 559,0 SSTK
E51212 OB 2,80 5.332,00 9,00 592,4 SSTK 100,0% E51212 OB 2,90 4.644,00 9,00 516,0 SSTK MATERIAL KERAS ORI

E51213 OB 2,70 4.945,00 9,00 549,4 SSTK MATERIAL KERAS ORI & PINDAH FRONT PC BREAKDOWN 98,3% E51213 OB 2,80 5.375,00 9,00 597,2 SSTK
E51214 OB 3,30 5.547,00 10,00 554,7 SSTK 100,0% E51214 OB 2,90 5.117,00 9,00 568,6 SSTK
E5503 - - - SSTK PC BREAKDOWN 35,4% E5503 OB 3,90 1.160,00 4,90 236,7 SSTK
E506PPA OB 3,70 2.210,00 9,00 245,6 SSTK SWITCH HAULER 95,0% E506PPA OB 3,60 1.960,00 8,40 233,3 SSTK
E508PPA MD2 3,40 1.508,00 9,00 167,6 SSTK WAIT HAULER & PC BREAKDOWN 143,5% E508PPA MUD ORI 3,70 1.727,00 7,90 218,6 SSTK
E5310 MD2 4,00 756,60 7,00 108,1 SSTK WAIT HAULER 100,0% E5310 MUD CAIR 4,10 865,80 8,30 104,3 SSTK
DISTANCE PRO S1 RAINFALL SENTUK SUMPRODUCT DISTANCE S2 PRO S2 SUMPRODUCT DAILY
TOTAL TOTAL
3.391,6 90.861,60 - 3.106,3 88.272,80 3.251,03

REMARKS OB SITE SENTUK REMARKS COAL HAULING SST, ABP & BKS/MTK
SHIFT 1 - SHIFT 1 -
SHIFT 2 - SHIFT 2 -

REMAKS COAL HAULING LKCT REMARKS COAL IP


SHIFT 1 - SHIFT 1 -
SHIFT 2 - SHIFT 2 -

UNIT PA DAILY GAIN/LOSS PDTY MTD GAIN/LOSS PDTY


HD785 92,96% PROBLEM PRODUCTIVITY PC2000 PROBLEM PRODUCTIVITY PC1250 OB
DT MERCY PROBLEM PRODUCTIVITY PC1250 OB
86,07%
Gain/Loss Pdty
PROBLEM PC2000
PRODUCTIVITY PC2000KERAS ORI, 29%
MATERIAL Gain/Loss Pdty PC1250 Gain/Loss Pdty PC2000 Gain/Loss Pdty PC1250
DT VOLVO 89,82% HAULER KURANG FRONT LEMBEK
23,8% 63,1% 33,5%
MATERIAL BOULDER DT/HD BD 7% 23,2%
D155 98,36% FRONT AMBLAS DISPOSAL AMBLAS
HAULER KURANG 15% FRONT AMBLAS s
7%
FRONT AMBLAS DISPOSAL AMBLAS AMBLAS, DT/HD BD AMBLAS
D85 86,11% AMBLAS, 14% AMBLAS, 14% AMBLAS, 0%
HAULER KURANG DT/HD BD, 14% 0% 19% 13%
MATERIAL TIPIS 17,1%
19% MATERIAL KERAS ORI
GD825 72,22% 12,3% 37%
E200 12,50%
MATERIAL BOULDER, MATERIAL KERAS ORI
29% 24% PINDAH FRONT
29% PINDAH FRONT
HAULER KURANG
Loading Time Hanging Time ManuverDT/HD
TimeBD, 43% Spotting Time
Loading Time30% Hanging Time Manuver Time Spotting Time
Loading Time Hanging Time Manuver Time Spotting Time
-3,8%
PINDAH FRONT, 57% -15,5% -14,5%
-18,8%
Loading Time Hanging Time Manuver Time Spotting Time
-6,6% -5,6%
-47,2%
-45,0% -24,7% -45,2%
PROBLEM PRODUCTIVITY PC1250 MUD
OTHERS