You are on page 1of 1

Site Information Board

Site Name: Surface Water Tank # 02


Location: Alauddin Town, Saidu Sharif, Mingora
Capacity: 200,000 Gallons
Cost:
Client:
Local Government Election & Rural Development Department (LGE&RDD) Government of
Khyber Pakhtunkhwa (KP)

Consultants:
Minconsult SDN BHD & Creative Engineering Consultants
(CEC) (JV)

Contractor:
M/S ZKB (Zahir Khan & Brothers)- T.T. Sh-INSAAT (JV)

Funded By:
Asian Development Bank (ADB) and Asian Infrastructure
Investment Bank (AIIB)

Project Name
OCB/KPCIP/CW-04: Mingora Greater Water Supply Scheme Including New Water
Treatment Plant (WTP), Intake Structure, Transmission, and Distribution System, and
SCADA
Lot-2: Water Distribution System, Intake Structure, and Transmission Main