Well No
(MM/DD/YYYY)
3-Aug-19 06B-057
4-Aug-19 04B-082
4-Aug-19 03B-022
4-Aug-19 06B-107
4-Aug-19 09B-109
4-Aug-19 13B-004
4-Aug-19 13B-079
4-Aug-19 14B-005
4-Aug-19 12B-126
6-Aug-19 07B-135
7-Aug-19 03B-022
7-Aug-19 03B-023
7-Aug-19 03B-024
7-Aug-19 03B-025
7-Aug-19 03B-071
7-Aug-19 03B-072
7-Aug-19 03B-127
7-Aug-19 03B-129
8-Aug-19 04B-036
8-Aug-19 04B-038
8-Aug-19 04B-081
8-Aug-19 04B-082
8-Aug-19 04B-083
8-Aug-19 04B-111
8-Aug-19 04B-174
8-Aug-19 04B-176
8-Aug-19 04B-177
8-Aug-19 04B-182
10-Aug-19 03B-022
10-Aug-19 09B-109
10-Aug-19 14B-005
10-Aug-19 13B-004
10-Aug-19 13B-079
11-Aug-19 13B-078
11-Aug-19 06B-107
11-Aug-19 09B-109
11-Aug-19 13B-004
11-Aug-19 14B-005
14-Aug-19 06B-056
15-Aug-19 01B-014
15-Aug-19 01B-015
15-Aug-19 01B-018
15-Aug-19 01B-070
4-Sep-19 09B-109
4-Sep-19 14B-005
4-Sep-19 07B-135
5-Sep-19 09B-109
5-Sep-19 14B-005
6-Sep-19 03B-186
7-Sep-19
7-Sep-19 02B-030
7-Sep-19 02B-086
7-Sep-19 02B-119
7-Sep-19 02B-121
8-Sep-19 02B-030
8-Sep-19 02B-086
8-Sep-19 02B-119
8-Sep-19 13B-162
10-Sep-19 13B-089
10-Sep-19 09B-067
11-Sep-19 03B-022
11-Sep-19 03B-022
11-Sep-19 04B-082
18" Corridor-B pig launcher downstream line sleeve welding (due to wall thickness~<2mm during IP run)
18" Corridor-B pig launcher downstream line sleeve welding (due to wall thickness~<2mm during IP run)
DG power to OHL power switch over post RMU to transformer (33 KV) terminal rectification
18" Corridor-B pig launcher downstream line sleeve welding (due to wall thickness~<2mm during IP run)
18" Corridor-B pig launcher downstream line sleeve welding (due to wall thickness~<2mm during IP run)
- - 0:28
9:55 19:20
10:00 18:55
9:55 21:30
10:20 21:30
10:10 18:12
10:08 18:54
9:58 18:44
16:20
23:00
8:19 9:05
8:19 8:57
8:19 8:57
8:19 8:57
8:19 8:58
8:19 8:55
8:19 8:49
8:19 9:00
3:10 4:15
3:10 4:15
3:10 4:15
3:10 4:15
3:10 4:15
3:10 4:15
3:10 4:20
3:10 4:20
3:10 4:20
3:10 4:20
13:45 15:17
13:40 17:00
13:24 19:10
13:30 16:15
13:30 14:15
3:15
13:15 21:06
13:15 20:48
13:15 21:17
13:15
2:40
18:10
18:10
18:10
18:10
10:15
10:15
9:00 9:10
16:10
16:10
16:57
5:38
21:30 23:40
21:30 23:40
21:30 23:40
21:30
11:04 15:20
11:04 15:20
11:04 15:20
14:27
- 5:20 - -
- 7:00 - -
14:00 16:15
17:32 21:30
13:45 22:15
VFD Electical PM
VFD Electical PM
8/1/2019
8/2/2019
8/3/2019
8/4/2019
8/5/2019
8/6/2019
8/7/2019
8/8/2019
8/9/2019
8/10/2019
8/11/2019
8/12/2019
8/13/2019
8/14/2019
8/15/2019
8/16/2019
8/17/2019
8/18/2019
8/20/2019
8/21/2019
8/22/2019
8/23/2019
8/24/2019
8/25/2019
8/26/2019
8/27/2019
8/28/2019
8/29/2019
8/30/2019
8/31/2019
9/1/2019
9/2/2019
9/3/2019
9/4/2019
9/5/2019
9/6/2019
9/7/2019
9/8/2019
9/9/2019
9/10/2019
9/11/2019
9/12/2019
9/18/2019
9/19/2019
9/20/2019
9/21/2019
9/22/2019
9/23/2019
9/24/2019
9/25/2019
9/26/2019
9/27/2019
9/28/2019
9/29/2019
9/30/2019
BP03: B-026 IW 80 bbls KCL pumping completed. Well under observation. BP03: B-187 JP
assisted flow back in progress. BP04: B-034 IW SIHBP completed. BP06: B-172/173 JP assisted
flowback completed. BP10: B-074 IW HUD completed at 935 MWL. BP14: B-005 JP Sand
scouring job completed and well taken in-line. BP14: B-165 JP assisted flow back in progress
through B-166 flow arm.
BP03: B-187 JP assisted flow back in progress. BP04: B-035 IW SIHBP completed. BP06: B-056
IW JP of size 14C installed. BP06: B-172/173 rig-down in-progress. BP10: B-074 IW Unit
standby. BP14: B-165 JP assisted flow back in progress through B-166 flow arm. BP15: B-103
SIBHP IW completed.
BP03: B-187 JP assisted flow back in progress. BP06: B-053 IW SIHBP completed. BP06: B-
172/173 rig-down in-progress. BP07: B-060 IW SIBHP carried out. BP14: B-165 JP assisted flow
back in progress through B-166 flow arm. BP15: B-103 Tag HUD done at 765m.
BP03: B-187 JP assisted flow back in progress. BP06: B-172/173 rig-down in-progress. BP14: B-
165 JP assisted flow back in progress through B-166 flow arm.
BP03: B-187 JP assisted flow back in progress. BP03: B-026 TCI HRP unit standby. BP13: B-078
PCP wellhead greasing completed. BP14: B-165 JP assisted flow back in progress through B-166
flow arm. BP14: B-004 JP POOH for sand scouring.
BP03: B-187 JP assisted flow back in progress. BP03: B-026 Sim plug job in-progress. BP13: B-
078 PCP wellhead greasing completed. BP14: B-165 JP assisted flow back in progress through B-
166 flow arm. BP15: B-009 IW Wellhead greasing completed.
BP03: B-187 JP assisted flow back in progress. BP03: B-026 KCL pumping job in-progress. BP03:
B-129 PCP wellhead greasing completed. BP14: B-165 JP assisted flow back in progress through
B-166 flow arm. BP15: B-008 IW Wellhead greasing completed.
BP03: B-187 JP assisted flow back in progress. BP14: B-165 JP assisted flow back in progress
through B-166 flow arm. BP12: B-049 IW Wellhead greasing completed.
BP03: B-187 JP assisted flow back completed. BP14: B-165 JP assisted flow back in progress
through B-166 flow arm. 03B-026 KCL Pumping done. BP11: B-066 PCP Wellhead greasing IPM
completed.
BP14: B-165 JP assisted flow back completed. 04B-175/178: flow back in progress. 03B-026 KCL
Pumping done. BP03: B-024/071 PCP Wellhead greasing IPM completed. BP12-128 PCP
Wellhead greasing IPM completed. BP13-033 PCP Wellhead greasing IPM completed.
04B-175/178: flow back in progress. 03B-026 KCL Pumping done. 04B-038/06B-054 PCP
Wellhead greasing IPM completed. 11B-064: IW Wellhead greasing IPM completed.
04B-175/178: flow back in progress.
04B-175/178: flow back in progress. 06B-084: PCP WH greasing IPM done. 05B-041: IW WH
greasing IPM done.
04B-175/178: flow back in progress. 01B-104 04B-037: PCP WH greasing IPM done.
04B-175/178: flow back in progress. 14B-005: IW WH greasing IPM done.
04B-175/178: flow back in progress. 03B-127: PCP WH greasing IPM done. 06B-107: JP WH
greasing IPM done. 01B-099 / 01B-017: SIBHP done.
04B-175/178: flow back in progress. 03B-072: WH greasing done.
04B-175/178: flow back in progress. 03B-133: PCP WH greasing IPM done.
04B-175/178: flow back in progress. 15B-013: PCP WH greasing IPM done. 13B-116: Jet pump
retrieved, awaiting workover. 06B-053: Slick plug installed perforation completed.
04B-175/178: flow back in progress. 01B-018: PCP WH greasing IPM done. 13B-116: Jet pump
retrieved, awaiting workover.
04B-175/178: flow back in progress. 01B-015: PCP WH greasing IPM done. 13B-116: Jet pump
retrieved, awaiting workover.
04B: B-175/178 flow back completed, Rig down in-progress. 13B: B-116 Jet pump retrieved,
awaiting workover. 01B: B-074 Casing patch retrieval done, Rig down in-progress. 06B: B-053
Memory gauge retrieval done Plug installed.
04B: B-175/178 flow back completed, Rig up in-progress for JP retrieval. 13B: B-116 Jet pump
retrieved, awaiting workover. 15B: B-103 Casing patch retrieval job in-progress. 01B: B-017
FRAC slick line job in-progress.
01B: TCI unit stand-by 13B: B-116 Jet pump retrieved, awaiting workover. 15B: B-103 Casing
patch retrieval job completed.
01B: B-017 Rig-up completed, preparation and execution of perforation in-progress. 13B: B-116
Jet pump retrieved, awaiting workover.
01B: B-017 Rig-up completed, fracturing investigation in-progress.
0
0
01B-017: Frac investigation in progress.
13B-137: SIBHP Tag HUD done.
03B-073: Online MPLT in progress. 07B-062: Annulus inlet valve installation completed.
03B-073: Online MPLT job suspended.
04B-081: Lube and bleed job completed, PRV lined up.
-
BP09: 09B-067 Well head valves integrity and greasing done. BP14: 14B-166 Well head valves
integrity and greasing done.
BP07: 07B-060 Equipment movement for sand scouring activity in-progress. BP13: 13B-080
Well head valves integrity and greasing done.
BP07: 07B-060 Equipment movement for sand scouring activity in-progress. BP02: 02B-030
Well head valves integrity and greasing done. BP04: 04B-036 Well head valves integrity and
greasing done.
13B-113: IFO completed. 13B-116: Sand settling i/p. 02B-119: IW IPM WH greasing done.
13B-116: KCL pumping done. Settling i/p.
-
02B-029: Casing patch retrieval in-progress. 04B-180: Flow back in-progress.
02B-029: Well bore clean out (WBCO) in-progress. 02B-151: Rig-up in-progress for IFO. 04B-
180: Flow back in-progress.
02B-029: Well bore clean out (WBCO) completed. 02B-151: IFO survey in-progress. 04B-180:
Flow back in-progress. 15B-103: Rig-up in-progress for WBCO.
02B-029: Coil tubing stuck, Well bore clean out (WBCO) to be done. 02B-151: IFO survey
completed. 04B-180: Flow back in-progress through B-037 flow line. 15B-103: WBCO
completed, Sand scoring in-progress.
02B-029: Acid pumping done, Coil tubing tool stucked. 04B-180: Flow back in-progress through
B-037 flow line. 15B-103: WBCO completed, Sand scoring in-progress.
02B-029: Coil tubing tool got stuck. 04B-180: Flow back in-progress through B-037 flow line.
15B-103: CT completed. 02B-151: MPLT planned and unsuccessful.
VR06: 03B-133: Preparatory for rig-up in-progress. REPL14: 13B-078: Fishing completed BOP found passing
BOP replacement planned.
VR06: 03B-133: Tubing RIH completed. BOP N/U i/p. REPL14: 15B-011: Well killing i/p.
VR06: 03B-133: Rig down completed, moved to BWP11. REPL14: 15B-011: Well killing i/p.
VR06: 11B-066 Tubing RIH i/p. REPL14: 15B-011 T/s failed, moved to 13B-078
VR06: Standby at BP11 REPL14: 08B-150: Polish rod clamp troubleshooting done started.
VR06: 05B-163: Fishing failed, Rig-up in progress for workover. REPL14: 13B-115: Rig-up in progress.
VR06: 05B-163: Tubing pull-out completed, BHA run in-progress. REPL14: 13B-115: Rod running completed.
Tubing pressure test attended and failed, awaiting workover.
VR06: 05B-163: Tubing pull-out completed, corrosion logging in-progress. REPL14: 01B-070: Fishing in-
progress.
VR06: 05B-163: Pressure test carried out and failed post packer set. Tubing pull-out in-progress for re-setting
the packing. REPL14: Stand b
VR06: 05B-163: Packer set , A-Annulus pressure testing in-progress. REPL14: Stand by
VR06: 13B-115 Rig-up in-progress. REPL14: 05B-163 Rig-up in-progress for rod running.
VR06: 13B-115 Tube final running in-progress. REPL14: 05B-163 Job completed, Rig-down in-progress.
VR06: 13B-116 : Rig down completed and moved to NI. REPL14: 02B-121 RRU troubleshooting in progress.
REPL14: 02B-121 Rod RIH in progress.
REPL14: 13B-090 fishing in progress. VR06: 15B-011: Rig up in progress.
REPL14: 13B-090: RIH completed.Drivehead installed. VR06: 15B-011: Job suspended. Will move to NI-03.
REPL14: 02B-121: Rod POOH in progress.
REPL14: 02B-121: iPCP replaced, Rod RIH in progress. REPL14: 03B-133: Polish rod clamping completed.
REPL14: 13B-089: Rig up done. BOP pressure test in-progress. VR06: 15B-011: Fishing in-progress.
REPL14: 09B-067: Rigup in-progress. VR06: 15B-011: Rod RIH completed and drivehead installed Rig moved
to 04B-040
VR06: 13B-089: Final tubing running i/p. REPL14: 13B-078: Rig up i/p for stator flushing.
VR06: 13B-089: Rod RIH completed. Drive head installed. Rig down i/p. REPL14: 13B-078: Cable connection
done. Surface line hook up done.
VR06: Moved to Aishwarya. REPL14: 12B-161: kill wing motor cable removed.
REPL14: 01B-018 Rod pull out done, fishing tool run in progress. Quippo37: 12B-150: Rig movement i/p.
REPL14: 01B-101: Rig Movement in-progress. Quippo37: 12B-050: BOP Nipple-up in-progress.
REPL14: 03B-133: Rig movement in-progress. Quippo37: 12B-050: Tubing POOH in-progress.
REPL14: 03B-133: Drive head installation completed. Quippo37: 12B-050: Fishing in-progress.