COURSE DESCRIPTION & TOPICS:
1) Introduction to Project Management
2) Project Planning & Scheduling
3) Critical Path Method (CPM)
4) Resource Management
5) Cash flow
6) Line of balance
7) Construction Submittals
2 Dr.Yasser Elfahham
Course Resources:
3 Dr.Yasser Elfahham
ادارة ﻣﺸﺮوﻋﺎت اﻟﺘﺸﯿﯿﺪ
On budget Minimize
اﻟﻤﺸﺮوع ﻋﺒﺎرة ﻋﻦ ﻣﺠﻤﻮﻋﺔ ﻣﻦ اﻻﻟﻤﮭﺎم و اﻷﻧﺸﻄﺔ اﻟﺘﻲ ﯾﺘﻢ ﺗﻨﻔﯿﺬھﺎ ﻓﻲ وﻗﺖ ﻣﺤﺪد و ﺗﻜﻠﻔﺔ ﻣﺤﺪدة
واﻟﻤﺸﺮوع ﻋﺒﺎرة ﻋﻦ ﻋﻤﻞ ﻣﺆﻗﺖ ﻟﺔ.ﺑﻤﻮاﺻﻔﺎت ﻣﺤﺪدة ﻟﺘﺤﻘﯿﻖ ھﺪف ﻣﻌﯿﻦ و ﯾﺴﺘﺨﺪم ﻓﻲ اﻟﺘﻨﻔﯿﺬ ﻋﺪة ﻣﻮارد
ﺑﺪاﯾﺔ وﻧﮭﺎﯾﺔ وﻛﻞ ﻣﺸﺮوع ﯾﺨﺘﻠﻒ ﻋﻦ ﻏﯿﺮة ﻣﻦ ﺣﯿﺚ اﻟﺸﻜﻞ واﻟﺤﺠﻢ واﻷھﺪاف واﻟﺘﻜﺎﻟﯿﻒ وﺧﻼﻓﺔ
:أﻣﺜﻠﺔ ﻟﻤﺸﺎرﯾﻊ اﻟﺘﺸﯿﯿﺪ
ﻣﺸﺮوع إﻧﺸﺎء ﻣﺤﻄﺔ طﺎﻗﺔ ﻛﮭﺮﺑﯿﺔ.أ
ﻣﺸﺮوع إﻧﺸﺎء طﺮﯾﻖ أو ﻛﻮﺑﺮي.ب
ﻣﺸﺮوع إﻧﺸﺎء ﻗﺮﯾﺔ ﺳﯿﺎﺣﯿﺔ ﺑﮭﺎ ﻋﺪد ﻣﻦ اﻟﺸﺎﻟﯿﮭﺎت و اﻟﻤﺴﺎﺣﺎت اﻟﺨﻀﺮاء واﻟﻄﺮق و اﻟﺨﺪﻣﺎت اﻷﺧﺮي.ج
7 Dr.Yasser Elfahham
?What is an activity
اﻟﻨﺸﺎط ھﻮ ﺟﺰء ﻣﻦ اﻟﻤﺸﺮوع وھﻮ ﻋﺒﺎرة ﻋﻦ ﻋﻤﻞ ﻣﻌﯿﻦ ﯾﺘﻢ إﻧﺠﺎزة ﻓﻲ اﻟﻤﺸﺮوع وﯾﺤﺘﺎج ﻟﻮﻗﺖ
وﻣﻮارد وﺗﻜﻠﻔﺔ
أﻣﺜﻠﺔ ﻋﻠﻲ اﻷﻧﺸﻄﺔ:
اﻟﺤﻔﺮ – اﻟﺮدم – اﻟﺨﺮﺳﺎﻧﺔ اﻟﻤﺴﻠﺤﺔ – اﻟﻤﺒﺎﻧﻲ – اﻷرﺿﯿﺎت – اﻟﺒﯿﺎض ...... -
9 Dr.Yasser Elfahham
The Relationships Among Portfolios, Programs, and Projects
Middle Mang.
2. Non-Residential Building
Include: commercial, educational, administrative, Health care, and industrial
Buildings.
Higher cost of construction
The contractors of such projects may be specialized in only that type of building.
11 Dr.Yasser Elfahham
Building Construction
Bridge Construction
12 Dr.Yasser Elfahham
Circular tank
Construction
Pipeline Construction
13 Dr.Yasser Elfahham
Characteristics of Construction industry
Projects are large and consume much time, money, and
resources.
Projects are unique.
Organizations change from Project to Project
On-site work stations are not permanent (location)
Operations are conducted outside and thus subject to
Weather
Uncertainty in Project cost and duration
High risk
Construction is different from Manufacturing
14 Dr.Yasser Elfahham
Project parties or stakeholders
The main participants (stakeholders) of project are:
1. Owner
2. Contractor
3. Consultant (Engineer)
A Conflict of interests exists between owner and Contractor
Other stakeholders include:
1. Vendors
2. Users
3. Bank
4. Manufacturer
5. Purchasing
6. Accounting
15 Dr.Yasser Elfahham
1.The Owner:
The person how owns and finances the project.
His objective is to finish the project as soon as possible, with target cost
and best quality.
Owners could be Public or private
Responsible for selecting qualified designers, consultants, and
contractors
Feasibility study
Design
Bidding & awarding
Construction
Turnover
Project Life Cycle
Phase-to-Phase Relationships
The project phases are sequential process designed to ensure proper control of the
project.There are two types of relationships:
1) Sequential relationship.
In a sequential relationship, a phase starts only when the previous phase is complete.
2) overlapping (concurrent ) relationship.
In an overlapping relationship, a phase starts prior to completion of the previous
one.
21 Dr.Yasser Elfahham
Characteristics of Life Cycle
Project Cost, Resource, and staffing levels are low at the start, higher
at the middle and toward the end, and drop as project closes
22 Dr.Yasser Elfahham
Impact of poor Project Management
Bad quality products
Project failure (e.g. pavement settlement)
Rework
Loss of project scope
Loss of information
Delays and cost overruns
Higher Disputes between construction parties
Confusion and conflicts
23 Dr.Yasser Elfahham
Impact of poor Project Management
24 Dr.Yasser Elfahham
Questions ?