Professional Documents
Culture Documents
V-068 Pre Stowage Plan - Soyabean - Cond 1
V-068 Pre Stowage Plan - Soyabean - Cond 1
DWT (SUM) DRAFT (S/SW) TPC Cargo(es) S/F Ballast pumping rate Last Cargo
1000m³/Hr X 1 PUMP
76457 14.122 66.68 SOYABEAN 48.5 CFT/MT USING BWTS COAL
PORT Draft(M) Fwd Mid Aft Density GM(M) Air Draft BM(%) SF(%)
Load Port ITAQUI Dep 12.50 12.84 13.15 1.025 1.53 34.11 -32 -33
Disch. Port QINDAO Arr. 11.50 11.85 12.20 1.025 1.98 35.13 -31 -22
DWT (SSW) DRAFT (SSW) TPC Cargo(es) S/F Ballast pumping rate Last Cargo
UREA/YELLOW SOYBEAN/ETC 49 FT3/MT 800m³/Hr X 2 PUMP AGGREGATES
PORT Draft(M) Fwd Mid Aft Density GM(M) Air Draft BM(%) SF(%)
Load Port AL-JUBAIL Dep
Lowest depth point (eg. Panama canal, remove this row if n/a) Arr.
Disch. Port MISS.RIVER Arr.
Dep
P
168.6 M CONDITION(MT)
HSFO= 540
CH.5 CH.4 CH.3 CH.2 CH.1 LSFO= 90
TST No.5 TST No.4 TST No.3 TST No.2 TST No.1 POLARIS TBN HSDO= 125
LSDO= 120
Cargo Grade GRADE A GRADE A GRADE A GRADE A GRADE A CONS= 350
Quantity 9,500 9,400 10,000 9,500 7,750 FW= 125
Hold percentage 100% 100% 100% 100% 100% BW= 120
FULL FULL FULL FULL FULL DISPLACEMENT= 72938.4
LIGHTSHIP= 13961
WBT No.5 WBT No.4 WBT No.3 WBT No.2 WBT No.1 DEADWEIGHT= 58977.4