1 Traditional costing leads to ________ of products or services?


Under costing
Over costing
Both A and B
None of the above

2 The activities that are performed each time a batch is produced are:
batch-level activities
facility-level activities
process-level activities
product-level activities

3 In a functional-based cost accounting system, which of the following activity drivers is used to
assign fixed overhead costs to products?
batch-level activities
facility-level activities
process-level activities
Unit-level activities

4 In a “pure” ABC system, which of the following would not be assigned to products?
batch-level activities
facility-level activities
process-level activities
product-level activities

5 Which of the following would be classified as a product-level activity?


Plant management
Production scheduling
Engineering changes
Material handling

6 Which of the following would be classified as a batch-level activity?


Plant management
Process engineering
Engineering changes
Material handling

7 Consumption ratios are:


elearning.nokomis.in/CheckAnswers.aspx 1/3
6/5/22, 9:49 AM Check Your Answers :: ELearning System

The activities performed every time a batch is produced.


The proportion of each activity consumed by a product.
Necessary for unit-level activities but not for batch- or product-level activities.
Factors that cause costs to change as the level of activities change.

8 An activity-based costing system is one that:


Traces costs to activities and then to products.
Traces costs to activities and then to activities
Traces activities to costs and then to resources.
Traces products to activities and then to resources.

9 A homogeneous cost pool is one that:


Does not change over time.
Needs many activity drivers to be allocated to a cost object
Has only one type of material assigned to it.
can be explained with a single activity driver.

10 “Inspection of the first unit produced” is what type of activity?


batch-level
facility-level
process-level
product-level

11 The costing system that first traces costs to activities and then traces costs from activities to
products is a (n) ________?
activity based costing system
traditional costing
marginal costing
contract costing

12 _________ provide descriptive labels for individual activities?


Activity based costing
Activities attributes
Both A and B
None of the above

13 Factors that measure the demand placed on overhead activities by individual products are called
________?
Materials
Energy
Activity drivers
None of the above

14 The data structure that uses a table to represent the logical connections of a database is called a
(n) ___________?
Relational structure
elearning.nokomis.in/CheckAnswers.aspx 2/3
6/5/22, 9:49 AM Check Your Answers :: ELearning System

Inspection
Set ups
All of the above