You are on page 1of 2

TEMPORARY POWER

PT. SUMBERDAYA SEWATAMA

TMT 2 Building, Floor 1 and 2


Jl. Cilandak KKO No. 1, Jakarta 12560
Indonesia

T +62 . 21 . 2997 6712 (Hunting)


F +62 . 21 . 2997 6725

info@sewatama.com
www.sewatama.com

toll free 0800 1821 301

Balikpapan - Jayapura - Makassar - Medan - Palembang - Pekanbaru - Surabaya

A Member of ABM Group


our products and services

Providing you with fast, reliable and customized • Temporary Power Solutions: providing
engineering system based on your specific needs: customized power generating and supporting
equipments that are project-specific,
• Urgent Power Solutions: providing emergency determined from on-site research.
response through the appropriate use of
state-of-the-art, mobile, and easy-to-install • Planned Power Solutions: providing superior
equipment. power equipment and services to ensure that
business operations are reliable, efficient,
and productive.

Service Specifications: Product specifications:


• Daily/weekly/monthly rental • Range : 200KW to thousands MWs
• Base/peak load • Frequency : 50 - 60 kHz
• Standby • Voltage : 400V, 480V, 6.6KV, 11KV, 20KV etc
• Overhaul • Fuel : Diesel, Gas
• Rental transfer (BOT)
• Off-shore/on-shore
• Industrial package
• Power optimization • Fast, accurate delivery
• Fleet: SPEED • Proven success for delivery
- Diesel and gas generator sets 50MW in 1 month
PT Sumberdaya Sewatama (“Sewatama”) is a - Open and containerized generator sets
subsidiary of PT ABM Investama Tbk, a holding
company engaged in Mining, Energy and Package program:
Related Businesses. Our parent company is, • Remote locations
• Installation and operation FULL
in turn, a member of the Tiara Marga Trakindo • Difficult terrains
• Power cable COVERAGE
Group, a solid group of companies engaged in • Off-shore/on shore
• Insurance
a broad spectrum of commercial activities: from
• Operator
heavy equipment sales and services, investment
Sewatama Temporary Power (TP) commands • Maintenance
in diversified businesses, one-stop shop financing
to integrated energy solutions. the biggest temporary power market share • Proven engineering
in the country. Our service is fast and reliable Optional attachments: design and technology
Headquartered in Jakarta, we now have 7 using state-of-the-art and customizable power- • Control Panel (LV) CUSTOMIZED • Hazardous area
representative offices, 6 depot stations, over generating equipment. • Transformer ENGINEERING • Class 1 Div 2
1,800 skilled human assets, as well as a massive • Switch gear (MW) • Integrated engineering
installed base of more than 1,400 Megawatts A deep understanding of the market and • Power cable (LV and MV) system
capable of powering Bali and the surrounding project-experience throughout the archipelago • Fuel tank (standard/flame arrester)
islands. Sewatama provides total and integrated allows us to provide the most relevant and • Trailer
power solutions through its 4 lines of core customized power solutions. We provide • Spark arrester muffler
business: Temporary Power, Operation & services to the government, as well as, among
Maintenance, Energy Efficiency Services, and others, the oil & gas, mining, plantation,
TEMPORARY POWER SOLUTIONS FOR CUSTOMERS
Independent Power Producer. manufacturing, construction, pharmaceutical,
and commercial property industries. • Utility companies • Commercial buildings including offices, malls & hotels
With over 22 years of technical, operational, and • Oil, gas and mining • Travel and tourism, hotels included
market experience, Sewatama has given nothing Sewatama TP strive to provide the best • Industrial and manufacturing • Hospitals • Power plants, etc.
but the best to its utility and non-utility customers. products and services, first to the nation, then
the region and the world. Our long history has provided us with a keen understanding of what
At Sewatama, we empower life through total our customers need in terms of power generation and distribution.
power solutions. At Sewatama Temporary Power, We Deliver!

You might also like