The project involves supplying and installing power cables, a distribution board, floodlights, and cables to connect it all for lighting a signage board. Specifically, it will lay 15m of power cable, install 1 distribution board, 8 floodlights, and 60m of cable to connect the lights to the board. Testing and commissioning is also included to ensure everything is functioning properly once installed.
The project involves supplying and installing power cables, a distribution board, floodlights, and cables to connect it all for lighting a signage board. Specifically, it will lay 15m of power cable, install 1 distribution board, 8 floodlights, and 60m of cable to connect the lights to the board. Testing and commissioning is also included to ensure everything is functioning properly once installed.
The project involves supplying and installing power cables, a distribution board, floodlights, and cables to connect it all for lighting a signage board. Specifically, it will lay 15m of power cable, install 1 distribution board, 8 floodlights, and 60m of cable to connect the lights to the board. Testing and commissioning is also included to ensure everything is functioning properly once installed.
Supply & Installation of 4Cx16 sq.mm XLPE/SWA/PVC/Cu Power
Cable from the Supply post to the DB located near to the Signage 1 15 Board including the excavation for underground cable laying & cable termination at both ends Supply & Installation of 100A, 3-PH, 6-Way Distribution Board (IP- 2 65), along with breakers & Photocell with Timer Circuit along with 1 the mounting board
3 Supply & installation of 8 Nos of Billboard Clearflood Luminaire 8
Supply Installation of 1Cx6 sq.mm PVC/Cu cable from the DB near
the Signage Board to Luminaires mounted on top of the signage 60 board along with the conduiting & other Accessories 4 Testing & Commissioning of the circuits 1 BILL OF QUANTITY