This document is a bill of quantities (BOQ) for spider glazing and cladding works at the KIZAD HQ building. It includes 3 items: 1) supply and installation of fixed spider glazing at the ground floor for 81.63 sqm at a rate of AED 3,310,634, 2) supply and installation of aluminium composite cladding along the mezzanine floor slab edge for 111 linear meters at a rate of AED 811 per meter, and 3) supply and installation of fascia panels along the mezzanine floor slab edge for 111 linear meters at a rate of AED 895 per meter, for a total cost of AED 3,500,000.
This document is a bill of quantities (BOQ) for spider glazing and cladding works at the KIZAD HQ building. It includes 3 items: 1) supply and installation of fixed spider glazing at the ground floor for 81.63 sqm at a rate of AED 3,310,634, 2) supply and installation of aluminium composite cladding along the mezzanine floor slab edge for 111 linear meters at a rate of AED 811 per meter, and 3) supply and installation of fascia panels along the mezzanine floor slab edge for 111 linear meters at a rate of AED 895 per meter, for a total cost of AED 3,500,000.
This document is a bill of quantities (BOQ) for spider glazing and cladding works at the KIZAD HQ building. It includes 3 items: 1) supply and installation of fixed spider glazing at the ground floor for 81.63 sqm at a rate of AED 3,310,634, 2) supply and installation of aluminium composite cladding along the mezzanine floor slab edge for 111 linear meters at a rate of AED 811 per meter, and 3) supply and installation of fascia panels along the mezzanine floor slab edge for 111 linear meters at a rate of AED 895 per meter, for a total cost of AED 3,500,000.