PRAWEEKLY AREA HW LW W16

PT. BUKIT MAKMUR MANDIRI UTAMA


SITE ADARO INDONESIA COAL PROJECT
TANJUNG-TABALONG
17 April 2022
KALIMANTAN SLATAN

TOP
N-12
PC 24 PC-51, CAT-10 1. PC2000-10 : pembentukkan Ramp 60/50/44
N-19 Expose Seam H1 H2
PC-56, N-08 2. CAT6200-09 : Stripping OB to TO RL 40
EX-07, EX-08
3. PC2000-24 : Levelling RL 40 (Pembentukkan
PC-34 Akses Jalan) Levelling RL 36 Expose T116
4. EX2500-07, EX2500-08 : Pembentukkan
N-13, CAT-11 P1 Ramp jalan 80/64/60 Stripping OB to RL 64
S3 5. CAT6200-11 Stripping OB To RL 4 Expose
S1 Seam E, F. Ramp Jalan 12/0
6. PC1250-51, CAT6200-17 : StrppiNG ob To RL
4 Expose T112
7. CAT 6015-10 : Continue Selektif Coal seam
S2 T112 T113
8. EX2500-09: Stripping OB To RL 4 Expose
T112, T113
P2
MIDDLE
N-17 PC-58
PC-08 1. CAT6200-08, PC1250-56 : : Coal Getting
T110, T111, T112, Pembentukkan Akses
EX-09 D3 menuju Sponcomb.
2. PC2000-07, CAT6200-18 : Regrade jalan
Pontiac-Terios dan Expose Seam T300
3. PC1250-22 : Continue coal getting T300
EX-11, EX-14,EX-17 4. EX2500-11, EX2500-17, EX2500-14 : Progres
D1 EX-13 Stripping OB TO Rl -64
EX-16 5. PC2000-34 : Stripping OB to Rl -88 dan
Expose seam T120
6. EX2500-16 : Stripping OB To RL -96 T221
7. EX2500-13 : Progress Regrade Jalan Terios
A2 PC-29 Expose Seam T220
I 8. PC2000-29,: Stripping OB To RL -116 Expose
Seam T210
9. CAT6020-12 : Stripping OB to RL-64 Expose
Coal T111, T112.

PC-07, N-18
N-09
N-11 BOTTOM
PC-22
PC-10
1. CAT6020-19 : Coal T110 Lowest To RL -212
2. CAT6015-11 : Coal Getting T110 Lowest
Point Barat -192
3. PC2000-08, PC1250-58 : Mud Handling B
4. CAT6020-13 : Expose T110 Levelling -184

Khokok Sp Reny Susanti


Pit Eng BUMA STP ADARO