Professional Documents
Culture Documents
GB 01
GB 01
A B C D
1.66 2.35 1.66 1.66 2.35 1.66
F1 F1
1.20
1.20
1
1
C1 C1
1.66
1.66
1.20 1.20
F1 F1
1.20
1.20
2 2
C1 C1
5.
67
1.20 1.20
2.35
2.35
3
6. 1
F1 F1
1.20
1.20
3 3
C1 C1
1.66
1.66
1.20 1.20
F1 F1
1.20
1.20
4 4
C1 C1
1.20 1.20
COLUMN SCHEDULE:-
+0.30M LVL PLINTH LVL
COLUMN C1(8 No's)=0.23 Circular
PLINTH BEAM
+0 LVL N.G.L N.G.L
REINF. ALONG-B (Ast1)
SCHEDULE OF FOOTINGS
UP TO N.G.L
1.20M OR UPTO HARD STRATA
(AS PER SITE CONDITION)
FOOT.
MIX
A
F1
M-20 1.20
C
Ld 1.20 0.23
(8 No's)
0.15
B P.C.C (1:4:8)
0.115 TYPICAL FOOTING PLAN 0.23
SECTION Z-Z