A B C D

A B C D
1.66 2.35 1.66 1.66 2.35 1.66

F1 F1

1.20

1.20
1
1
C1 C1

1.66
1.66
1.20 1.20
F1 F1

1.20
1.20
2 2
C1 C1

5.
67
1.20 1.20

2.35
2.35

3
6. 1
F1 F1

1.20

1.20
3 3
C1 C1

1.66
1.66

1.20 1.20
F1 F1

1.20

1.20
4 4
C1 C1

1.20 1.20

COLUMN CENTERLINE FOOTING LAYOUT

COLUMN SCHEDULE:-
+0.30M LVL PLINTH LVL
COLUMN C1(8 No's)=0.23 Circular
PLINTH BEAM
+0 LVL N.G.L N.G.L
REINF. ALONG-B (Ast1)

SCHEDULE OF FOOTINGS
UP TO N.G.L
1.20M OR UPTO HARD STRATA
(AS PER SITE CONDITION)

COLUMN COLUMN FOOTING SIZE


a

FOOT.
MIX
A

REINF,ALONG-B (Ast2) TYPE LENGTH - M BREADTH - M DEPTH - M


b (A) (B) (C)
REINF,ALONG-L (Ast1)
REINF. ALONG-L (Ast2)

F1
M-20 1.20
C

Ld 1.20 0.23
(8 No's)
0.15

B P.C.C (1:4:8)
0.115 TYPICAL FOOTING PLAN 0.23

SECTION Z-Z