You are on page 1of 1

Banyu Urip Projecy Date :

Production Processing Facilities Rev No. :


Dept :
Forklift-Wheel Loader Daily Inspection Check Ref No :
List

Date of Inspection/Tanggal Pemeriksaan :

Location of Inspection/Lokasi pemeriksaan :

Identification Number/Nomor identifikasi :

Inspected by/Diperiksa Oleh :

Contractor/Kontraktor :

Condition
No Requirement Remarks
Good Bad N/A
1 Oil level / Batas minyak
2 Coolant level / Batas pendingin
3 Fuel / Water level / Batas solar / air
4 Battery condition / Kondisi baterai
5 Air filter / Saringan udara
6 V belt / V belt
7 Tires condition / Kondisi ban
8 All lights/ Semua lampu
9 Break system / Sistem pengereman
10 Fork, structural crack / Garpu, strucktur ada yang retak
11 Steering system / Sistem kemudi
12 Fuel tank/Fuel system / Tanki bahan bakar/sistem bahan bakar
13 Electrical system / Sistem listrik
14 Seat belt condition / Kondisi sabuk pengaman
15 Reverse alarm / Alarm mundur
16 Hydraulic hoses / Selang hidraulik
17 Safety sign posted / Tanda keselamatan terpasang
18 SWL marking clearly / Beban Kerja Aman ditandai dengan jelas
19 All indicator / Semua indikator
20 Horn / Klakson
21 Oil spill kit/Peralatan untuk kebocoran oli
22 Wiper, air condition/fan/Wiper, AC/kipas angin
Comment and recommendation

Inspected by, Witnessed by, Acknowledged by,

Operator Safety Advisor Site Supervisor

You might also like