LEGENDA :

B1: BALOK BAJA IWF.400.200.8.13


B2: BALOK BAJA CASTELLATED BEAM.350.175.7.11(700.175.7.11)
B3: BALOK BAJA IWF.300.150.6,5.9 A
B4: BALOK BAJA IWF.200.100.5,5.8
DETAIL A
B5: BALOK BAJA UNP.150.75.7,5.6
BE: BALOK BAJA EKSISTING
B
S2

KETERANGAN SLAB LANTAI 1 DETAIL B

12 KETERANGAN TEBAL BETON

2M8
KETERANGAN PENULANGAN SLAB

+4.80
KETERANGAN ELEVASI SLAB

H B5

HIDROLIK
B5 B5
A A

G B3 B3 B3 B3
525 500

S2
B3 12
S2
+4.80 B4 12
+4.80 B3
S2
+4.80 B4 S2
+4.80
B3
2M8 2M8 12 2M8
12 2M8

F B3 B3 B3 B3
S2 S2
B3 +4.80
B4
S2
B3 +4.80
B4
S2
B3
12 2M8
12
+4.80
2M8
12 2M8 12
+4.80
2M8 B
E B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2
A
1382,5

S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2

BE 12
+4.80
2M8
B4 12
+4.80
2M8
B3 12
+4.80
2M8
B4 12
+4.80
2M8
B3 12
+4.80
2M8
B4 12
+4.80
2M8
B3 12
+4.80
2M8
B4 12
+4.80
2M8
B3 12
+4.80
2M8
BE 12
+4.80
2M8
B4 12
+4.80
2M8
B3 12
+4.80
2M8
B4 12
+4.80
2M8
B3 12
+4.80
2M8
B4 12
+4.80
2M8
B3 12
+4.80
2M8
B4 12
+4.80
2M8
BE

D B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
8275

1500

BE 12
S2
+4.80 B4 12
S2
+4.80 B3 12
S2
+4.80 B4 12
S2
+4.80 B3 12
S2
+4.80 B4 12
S2
+4.80 B3 12
S2
+4.80 B4 12
S2
+4.80 B3 BE 12
S2
+4.80 B4 12
S2
+4.80 B3 12
S2
+4.80 B4 12
S2
+4.80 B3 12
S2
+4.80 B4 12
S2
+4.80 B3 12
S2
+4.80 B4 12
S2
+4.80 BE
2M8 2M8 2M8 2M8 2M8 2M8 2M8 2M8 2M8 2M8 2M8 2M8 2M8 2M8 2M8 2M8
6000

C B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
1500

BE S2 B4 S2 B3 S2 B4 S2 B3 S2 B4 S2 B3 S2 B4 S2 B3 VOID BE S2 B4 S2 B3 S2 B4 S2 B3 S2 B4 S2 B3 S2 B4 S2 BE
12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8
TANGGA 12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8 12
+4.80
2M8

B B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
1442,5

BE S2
+4.80
B4 S2
+4.80
B3 S2
+4.80
B4 S2
+4.80
B3 S2
+4.80
B4 S2
+4.80
B3 S2
+4.80
B4 S2
+4.80
B3 BE S2
+4.80
B4 S2
+4.80
B3 S2
+4.80
B4 S2
+4.80
B3 S2
+4.80
B4 S2
+4.80
B3 S2
+4.80
B4 S2
+4.80
BE
12 2M8 12 2M8 12 2M8 12 2M8 12 2M8 12 2M8 12 2M8 12 2M8 12 2M8 12 2M8 12 2M8 12 2M8 12 2M8 12 2M8 12 2M8 12 2M8

A BE BE BE BE BE BE BE BE BE

1330,7 1332,5 1370 695 675 675 695 1370 1332,5 1332,5 1200 1490 701,9 788,1 1452,5 1452,5 1452,5 1452,5 1490 1492,6
12000 11930
23930

1 18
2 3 4 4' 5 5' 6 7 8 9 10 11 12 13 14 15 16 17

DIBUAT OLEH : PROJECT NAME : DESAIN : CHECK : REVISION : OWNER : OTHER : DRAWING NAME :

1. ARIS WIDIYANTO, ST '- DATE : OKTOBER 2020 -DENAH STRUKTUR BAGIAN 1


KANTOR SCALE : 1:100
PM PERGUDANGAN DADAP
NO. SHEET : -
DRAWING CODE : A4