You are on page 1of 4

HYDRAULIC CALCULATION PERTAINING TO PUMP FOR HOSE REEL SYSTEM:

PROJECT:

BOMBA: JPBM: KD/005/3/1/29/03

Design Notes:

a) Pump location: NIL (TAPPED FROM PRESSURIZED HYDRANT PUMP)


b) Minimum pumping flow rate: 2.27 L/S
c) Minimum effective head required at highest nozzle is 20.42 Meter Head
d) PRV setting value 2.27 L/S @ 25.58 Meter Head
e) Total number of hose reel = 3 Nos

1. Head loss through linear length of pipe:

For 54.00 meter length 50 mm dia. The total head loss is 1.99 Meter Head

For 5.00 meter length 25 mm dia. The total head loss is 5.53 Meter Head

Total head loss through linear length of pipe 1.99 Meter Head

2. Head loss through bends:

For 7.00 nos. bends, the equipment length of pipe is 10.22 meter

Hence head loss is 0.38 Meter Head

3. Head loss through tees:

For 7.00 nos. tees, the equipment length of pipe is 20.37 meter

Hence head loss is 0.75 Meter Head

4. Head loss through valves:

For 4.00 nos. valves, the equipment length of pipe is 1.52 meter

Hence head loss is 0.06 Meter Head

5. Head loss through hose reel tubing:

For 30 length of 25 mm diameter of NON-KINK SINGLE BRAIDED hose, the head loss is
1.52 meter head

6. Head loss through vertical rise piping:

Height of the highest hose reel is 0.00 meter


Hence head loss is 0.00 Meter Head
7. Summary of total head loss:

a) Head loss through piping 1.99 Meter Head


b) Head loss through bends 0.38 Meter Head
c) Head loss through tees 0.75 Meter Head
d) Head loss through valves 0.06 Meter Head
e) Head loss through hose reel tubing 1.524 Meter Head
f) Head loss through vertical rise piping 0.00 Meter Head
g) Safety factor (10%) 0.47 Meter Head
h) Total head loss 5.16 Meter Head

Therefore, PRV setting valve 25.58 Meter Head


HYDRAULIC CALCULATION PERTAINING TO PUMP FOR HOSE REEL SYSTEM

Design Notes:
Pump location: NIL (TAPPED FROM SPRINKLER SYSTEM)
Min pumping flow rate: 2.27 L/s fixed
Min effective head required at highest nozzle 20.42 MH fixed

PRV setting value 2.27 L/s @ 25.58 Meter Head

At 2.27 L/s flow rate, based on Hanzen William's Formula with C = 120 for Galvanized steel and
the friction head loss per hundred meters of various pipe sizes are as below:

Nominal Pipe Size 50 mm diameter 3.68 MH/100m = 0.0368 MH/m *

Head loss through linear length of pipe:


Total linear length (50 mm dia) 54.00 m 158.7
Loss 1.99 MH

Total Head Loss (linear) 1.99 MH

Head loss through bends:


Head loss through each bend (50 mm dia) 1.46 m refer to table 37 equivalent length of fittings *
and valves BS 5306: Part 2, 1990 Section 4
Total of bends 7.00 8
Equipment length 10.22 m
Total Head Loss (bend) 0.38 MH

Head loss through tees:


Head loss through each tees (50 mm dia) 2.91 m refer to table 37 equivalent length of fittings *
and valves BS 5306: Part 2, 1990 Section 4
Total of tees 7.00
Equipment length 20.37 m
Total Head Loss (tees) 0.75 MH

Head loss through valves:


Head loss through each valve (50 mm dia) 0.38 m refer to table 37 equivalent length of fittings *
and valves BS 5306: Part 2, 1990 Section 4
Total of valves 4.00
Equipment length 1.52 m
Total Head Loss (valves) 0.06 MH

Head loss through hose reel tubing:


For 30 m length of 1 inch diameter of 1.52 MH fixed
NON-KINK SINGLE BRAIDED hose

Head loss through vertical rise piping:


Height of the highest hose reel 0.00 m
Total Head Loss (vertical rise) 0.00 MH

Summary of Total head loss 4.69 MH 4.69 for static loss in negative value
10 % Safety factor 0.47 0.4689
PRV setting valve 25.58 MH 25.58