Rujukan Bomba : JPBM:KD/005/3/2/371/05

SPRINKLER HYDRAULIC SYSTEM


STATEMENT OF DISTRIBUTION PIPE LOSSES BETWEEN THE VARIOUS DESIGN POINTS
AND THE INSTALLATION VALVE

PROJECT NAME: FASA 1: PEMBINAAN PEMBANGUNAN PUSAT PENTADBIRAN KERAJAAN PERSEKUTUAN DI BANDAR
MUADZAM SHAH, MUKIM ANAK BUKIT, DAERAH KOTA STAR, KEDAH DARUL AMAN DI ATAS LOT
LOT ASAL LOT 1035, LOT 1036 DAN SEBAHAGIAN LOT 958

OWNER: KERAJAAN MALAYSIA

HAZARD CLASS: ORDINARY HAZARD III - 30 METRES

1 2 3 4 5 6 7 8 9 10 11
Run of Pipe Pipe No. of Equiv. No. of Equiv. No. of Equiv. Total Pressure loss at design flow rate
distribution pipe size length turns pipe tee pipe cross pipe equiv. Pipe Static Difference
from length length length length losses head
of turns of tees of cross of pipe gain(Ph)
ARAS BAWAH TANAH mm m m m m m mbar/m mbar mbar

CV - 1 TO B - 1 150 88.20 8 16 2 17.22 0 0 121.42 0.65 78.92


100 36.80 1 1.43 0 0 0 0 38.23 4.4 168.21
80 13.50 0 0 0 0 0 0 13.50 16 216.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
463.14 0.00 463.14

CV - 1 TO B - 2 150 102.40 8 16 2 17.22 0 0 135.62 0.65 88.15


100 49.70 3 4.29 0 0 0 0 53.99 4.4 237.56
80 8.00 0 0 0 0 0 0 8.00 16 128.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
453.71 0.00 453.71

CV - 1 TO B - 3 150 93.60 9 18 2 17.22 0 0 128.82 0.65 83.73


100 14.90 0 0 1 6.1 0 0 21.00 4.4 92.40
80 8.40 0 0 0 0 0 0 8.40 16 134.40
65 0.00 0 0 0 0 0 0 0.00 35 0.00
310.53 0.00 310.53

CV - 1 TO B - 4 150 93.60 9 18 2 17.22 0 0 128.82 0.65 83.73


100 8.00 0 0 1 6.1 0 0 14.10 4.4 62.04
80 8.40 0 0 0 0 0 0 8.40 16 134.40
65 0.00 0 0 0 0 0 0 0.00 35 0.00
280.17 0.00 280.17

CV - 1 TO B - 5 150 119.90 9 18 3 25.83 0 0 163.73 0.65 106.42


100 44.40 0 0 0 0 0 0 44.40 4.4 195.36
80 12.00 0 0 0 0 0 0 12.00 16 192.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
. 493.78 0.00 493.78

CV - 1 TO B - 6 150 126.50 9 18 3 25.83 0 0 170.33 0.65 110.71


100 69.70 1 1.43 0 0 0 0 71.13 4.4 312.97
80 4.00 0 0 0 0 0 0 4.00 16 64.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
487.69 0.00 487.69

Perunding H.P.L Sdn. Bhd.


2/5

Rujukan Bomba : JPBM:KD/005/3/2/371/05

SPRINKLER HYDRAULIC SYSTEM


STATEMENT OF DISTRIBUTION PIPE LOSSES BETWEEN THE VARIOUS DESIGN POINTS
AND THE INSTALLATION VALVE

PROJECT NAME: FASA 1: PEMBINAAN PEMBANGUNAN PUSAT PENTADBIRAN KERAJAAN PERSEKUTUAN DI BANDAR
MUADZAM SHAH, MUKIM ANAK BUKIT, DAERAH KOTA STAR, KEDAH DARUL AMAN DI ATAS LOT
LOT ASAL LOT 1035, LOT 1036 DAN SEBAHAGIAN LOT 958

OWNER: KERAJAAN MALAYSIA

HAZARD CLASS: ORDINARY HAZARD III - 30 METRES

1 2 3 4 5 6 7 8 9 10 11
Run of Pipe Pipe No. of Equiv. No. of Equiv. No. of Equiv. Total Pressure loss at design flow rate
distribution pipe size length turns pipe tee pipe cross pipe equiv. Pipe Static Difference
from length length length length losses head
of turns of tees of cross of pipe gain(Ph)
ARAS BAWAH mm m m m m m mbar/m mbar mbar

CV - 2 TO G - 1 150 140.20 5 10 3 25.83 0 0 176.03 0.65 114.42


100 23.10 0 0 1 6.1 0 0 29.20 4.4 128.48
80 3.50 0 0 0 0 0 0 3.50 16 56.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
298.90 0.00 298.90

CV - 2 TO G - 2 150 140.20 5 10 0 0 0 0 150.20 0.65 97.63


100 37.10 0 0 1 6.1 0 0 43.20 4.4 190.08
80 4.10 0 0 0 0 0 0 4.10 16 65.60
65 0.00 0 0 0 0 0 0 0.00 35 0.00
353.31 0.00 353.31

CV - 2 TO G - 3 150 121.60 4 8 3 25.83 0 0 155.43 0.65 101.03


100 14.60 0 0 1 6.1 0 0 20.70 4.4 91.08
80 2.50 0 0 0 0 0 0 2.50 16 40.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
232.11 0.00 232.11

CV - 2 TO G - 4 150 121.60 4 8 3 25.83 0 0 155.43 0.65 101.03


100 35.40 0 0 1 6.1 0 0 41.50 4.4 182.60
80 5.00 0 0 0 0 0 0 5.00 16 80.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
363.63 0.00 363.63

CV - 2 TO G - 5 150 58.00 3 6 2 17.22 0 0 81.22 0.65 52.79


100 4.00 0 0 2 12.2 0 0 16.20 4.4 71.28
80 2.40 0 0 0 0 0 0 2.40 16 38.40
65 0.00 0 0 0 0 0 0 0.00 35 0.00
162.47 0.00 162.47

CV - 2 TO G - 6 150 58.00 3 6 2 17.22 0 0 81.22 0.65 52.79


100 24.40 0 0 2 12.2 0 0 36.60 4.4 161.04
80 0.00 0 0 0 0 0 0 0.00 16 0.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
213.83 0.00 213.83

CV - 2 TO G - 7 150 58.00 3 6 2 17.22 0 0 81.22 0.65 52.79


100 22.00 0 0 1 6.1 0 0 28.10 4.4 123.64
80 5.30 0 0 0 0 0 0 5.30 16 84.80
65 0.00 0 0 0 0 0 0 0.00 35 0.00
261.23 0.00 261.23

CV - 2 TO G - 8 150 43.20 3 6 2 17.22 0 0 66.42 0.65 43.17


100 39.50 0 0 1 6.1 0 0 45.60 4.4 200.64
80 5.50 0 0 0 0 0 0 5.50 16 88.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
331.81 0.00 331.81

CV - 2 TO G - 9 150 43.20 3 6 2 17.22 0 0 66.42 0.65 43.17


100 42.90 0 0 1 6.1 0 0 49.00 4.4 215.60
80 6.00 0 0 0 0 0 0 6.00 16 96.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
354.77 0.00 354.77

Perunding H.P.L Sdn. Bhd.


3/5

Rujukan Bomba : JPBM:KD/005/3/2/371/05

SPRINKLER HYDRAULIC SYSTEM


STATEMENT OF DISTRIBUTION PIPE LOSSES BETWEEN THE VARIOUS DESIGN POINTS
AND THE INSTALLATION VALVE

PROJECT NAME: FASA 1: PEMBINAAN PEMBANGUNAN PUSAT PENTADBIRAN KERAJAAN PERSEKUTUAN DI BANDAR
MUADZAM SHAH, MUKIM ANAK BUKIT, DAERAH KOTA STAR, KEDAH DARUL AMAN DI ATAS LOT
LOT ASAL LOT 1035, LOT 1036 DAN SEBAHAGIAN LOT 958

OWNER: KERAJAAN MALAYSIA

HAZARD CLASS: ORDINARY HAZARD III - 30 METRES

1 2 3 4 5 6 7 8 9 10 11
Run of Pipe Pipe No. of Equiv. No. of Equiv. No. of Equiv. Total Pressure loss at design flow rate
distribution pipe size length turns pipe tee pipe cross pipe equiv. Pipe Static Difference
from length length length length losses head
of turns of tees of cross of pipe gain(Ph)
ARAS BAWAH mm m m m m m mbar/m mbar mbar

CV - 2 TO G - 10 150 43.40 3 6 2 17.22 0 0 66.62 0.65 43.30


100 37.50 0 0 2 12.2 0 0 49.70 4.4 218.68
80 8.20 0 0 0 0 0 0 8.20 16 131.20
65 2.50 0 0 0 0 0 0 2.50 35 87.50
480.68 0.00 480.68

CV - 2 TO G - 11 150 43.40 3 6 2 17.22 0 0 66.62 0.65 43.30


100 59.20 0 0 2 12.2 0 0 71.40 4.4 314.16
80 4.00 0 0 0 0 0 0 4.00 16 64.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
421.46 0.00 421.46

CV - 2 TO G - 12 150 43.40 3 6 2 17.22 0 0 66.62 0.65


100 39.30 0 0 1 6.1 0 0 45.40 4.4 199.76
80 5.50 0 0 0 0 0 0 5.50 16 88.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
287.76 0.00 287.76

Perunding H.P.L Sdn. Bhd.


Rujukan Bomba : JBPM: KD/005/3/10/419 - 2009

SPRINKLER HYDRAULIC SYSTEM


STATEMENT OF DISTRIBUTION PIPE LOSSES BETWEEN THE VARIOUS DESIGN POINTS
AND THE INSTALLATION VALVE

PROJECT NAME:
CADANGAN PINDAAN DAN UBAHSUAI DALAMAN KEPADA BANGUNAN SEDIADA DI NO. 68, 70, 72, 74 & 76,
PERSIARAN BUNGA RAYA, LANGKAWI MALL FASA II, MUKIM KUAH, 07000 DAERAH LANGKAWI, KEDAH
DARULAMAN.

OWNER: BAHAGIA BUDGET HOTEL SDN. BHD.

HAZARD CLASS: ORDINARY HAZARD I - 30 METRES

1 2 3 4 5 6 7 8 9 10 11
Run of Pipe Pipe No. of Equiv. No. of Equiv. No. of Equiv. Total Pressure loss at design flow rate
distribution pipe size length turns pipe tee pipe cross pipe equiv. Pipe Static Difference
from length length length length losses head
of turns of tees of cross of pipe gain(Ph)
ARAS SATU mm m m m m m mbar/m mbar mbar

Control valve CV-1 150 3.50 1 2 1 8.61 0 0 14.11 0.65 9.17


to design 100 18.00 1 3 0 0 0 0 21.00 4.4 92.40
point DP-G-1 80 9.50 0 0 1 4.75 0 0 14.25 16 228.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
329.57 0.00 329.57

Control valve CV-1 150 7.00 1 2 2 17.22 0 0 26.22 0.65 17.04


to new design 100 17.0 2 6 2 12.2 0 0 35.20 4.4 154.88
point DP-1-1 80 11.0 0 0 0 0 0 0 11.00 16 176.00
65 1.5 0 0 0 0 0 0 1.50 35 52.50
400.42 0.00 400.42

Control valve CV-1 150 7.00 1 2 2 17.22 0 0 26.22 0.65 17.04


to new design 100 24.60 2 6 2 12.2 0 0 42.80 4.4 188.32
point DP-1-2 80 5.50 0 0 0 0 0 0 5.50 16 88.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
293.36 0.00 293.36

Control valve CV-1 150 10.50 1 2 3 25.83 0 0 38.33 0.65 24.91


to new design 100 17.0 2 6 2 12.2 0 0 35.20 4.4 154.88
point DP-2-1 80 11.0 0 0 0 0 0 0 11.00 16 176.00
65 1.5 0 0 0 0 0 0 1.50 35 52.50
408.29 0.00 408.29

Control valve CV-1 150 10.50 1 2 3 25.83 0 0 38.33 0.65 24.91


to new design 100 24.60 2 6 2 12.2 0 0 42.80 4.4 188.32
point DP-2-2 80 5.50 0 0 0 0 0 0 5.50 16 88.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
301.23 0.00 301.23
Rujukan Bomba : JBPM: KD/005/3/10/419 - 2009

SPRINKLER HYDRAULIC SYSTEM


STATEMENT OF DISTRIBUTION PIPE LOSSES BETWEEN THE VARIOUS DESIGN POINTS
AND THE INSTALLATION VALVE

PROJECT NAME: CADANGAN PINDAAN DAN UBAHSUAI DALAMAN KEPADA BANGUNAN SEDIADA DI NO. 68, 70, 72, 74 & 76,
PERSIARAN BUNGA RAYA, LANGKAWI MALL FASA II, MUKIM KUAH, 07000 DAERAH LANGKAWI, KEDAH
DARULAMAN.

OWNER: BAHAGIA BUDGET HOTEL SDN. BHD.

HAZARD CLASS: ORDINARY HAZARD I - 30 METRES

1 2 3 4 5 6 7 8 9 10 11
Run of Pipe Pipe No. of Equiv. No. of Equiv. No. of Equiv. Total Pressure loss at design flow rate
distribution pipe size length turns pipe tee pipe cross pipe equiv. Pipe Static Difference
from length length length length losses head
of turns of tees of cross of pipe gain(Ph)
ARAS SATU mm m m m m m mbar/m mbar mbar

Control valve CV-1 150 14.00 1 2 4 34.44 0 0 50.44 0.65 32.79


to new design 100 17.0 2 6 2 12.2 0 0 35.20 4.4 154.88
point DP-3-1 80 11.0 0 0 0 0 0 0 11.00 16 176.00
65 1.5 0 0 0 0 0 0 1.50 35 52.50
416.17 0.00 416.17

Control valve CV-1 150 14.00 1 2 4 34.44 0 0 50.44 0.65 32.79


to new design 100 24.60 2 6 2 12.2 0 0 42.80 4.4 188.32
point DP-3-2 80 5.50 0 0 0 0 0 0 5.50 16 88.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
309.11 0.00 309.11

Control valve CV-1 150 17.50 1 2 5 43.05 0 0 62.55 0.65 40.66


to new design 100 17.50 2 6 1 6.1 0 0 29.60 4.4 130.24
point DP-4-1 80 12.50 0 0 0 0 0 0 12.50 16 200.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
370.90 0.00 370.90

Control valve CV-1 150 17.50 1 2 5 43.05 0 0 62.55 0.65 40.66


to new design 100 25.0 3 9 1 6.1 0 0 40.10 4.4 176.44
point DP-4-2 80 0.0 0 0 0 0 0 0 0.00 16 0.00
65 0.0 0 0 0 0 0 0 0.00 35 0.00
217.10 0.00 217.10

Control valve CV-1 150 21.00 1 2 6 51.66 0 0 74.66 0.65 48.53


to new design 100 11.50 1 3 0 0 0 0 14.50 4.4 63.80
point DP-5-1 80 15.00 0 0 0 0 0 0 15.00 16 240.00
65 0.00 0 0 0 0 0 0 0.00 35 0.00
352.33 0.00 352.33