COMMENTS RESOLUTION SHEET (CRS)

General Real Estate Company (SPC)

PROJECT TITLE: CONSTRUCTION OF MOZOON TOWERS SUBSTRUCTURE ( PACKAGE -1)

MZP REFERENCE, DATED:28-May-2017 776-L/MZP-OE/MD-AM/SPN206/2017.Site

DOC/DWG NUMBER, REV & TITLE: SITE TOURING OBSERVATION REPORT, TOWER A

SR. MZP COMMENTS CONTRACTOR'S RESPONSE REMARKS


NO
Noted/Polyethylene sheet has been provide to divert water leakage
Water leakage from waller beam (earth anchor) resulting of ponding from waller beam (earth anchor) resulting of ponding of water and The contractor is responsible in maintaining dry
1
of water and rusted steel. (Page 1 & 2/Attachment #1) rusted steel and to maintain the area keep dry. Please see attached condition at site as per QCS requirements.
photos.
Hairline cracks at newly conceted Raft Foundation (20.04.17). (Page IR for surface preparation will be re-submitted once the whole affected
2 No works done as 0f 25-05-2017
3 & 4/Attachment #1) area is completed.
Please see attached approved IR # CIV-1651 for surface preparation.
Termination of C21A along soffit of 4rth basement slab needs repair
3 IR for honeycomb repair material application to be submitted once the Ongoing works as of 25-05-2017
(Gridline AC-AV/28-33). (Attachment #5
work is completed.
Realignment of French drain near sump pit 4 (Gridline AJ-AR/27-28).
4 Rectified. Please see attached approved IR No. CIV-1564 Completed
(Attachment #1)
End caps provided for safety precautionary measure only as the size
5 Coupler without end caps. (Page19/Attachment #1) Photos were found irrelevant.
of rebars is 16mm diameter only and not threaded.
Water around sump pit 4 at Tower A between gridline 27-28 (PD3 Water was removed and maintained dry until casting of blinding.
6 Completed
Area). (Page 28/Attachment #1) Please refer to attached approved IR No. CIV-1565