UP STANDARD DETAIL REFERENCE DRAWINGS

DETAIL OF HEAVY WELDING BOSSES FOR THREADED CONNECTIONS AE-036175

N
AWAY AWAY
CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING
INSULATION DETAILS FOR HOT PIPING
AD-036627
AA-036911

SHOP MATERIALS INSULATION DETAILS FOR COLD PIPING AA-036913

INSTALLATION OF JACK SCREWS FOR FLANGED JOINTS AC-036630

TOWARD TOWARD PT N.B.


NOTES
NO DESCRIPTION (INS) STOCK CODE QTY
1. MATERIAL SHOWN WITH A BROKEN LINE AND SPOOLS LISTED IN THE SAUDI ARAMCO
DOWN
PIPE FABRICATION LIST ARE NOT TO BE FURNISHED BY THE VENDOR.

2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).

1 PIPE , CS API 5L-B-PSL2 , SMLS , BE , 10 PPPCPVSMBESTD5F 5.6 M 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.

STD , B36.10M , FBE INT COATED 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.

(B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.

FOR CONT. SEE 5. FABRICATION SHALL BE IN ACCORDANCE WITH SAUDI ARAMCO SPECIFICATION 01-SAMSS-10.
FITTINGS
SHT 037 6. GASKET ALLOWANCE

7. PIPING MATERIAL IS
E 30087528 2 WELDOLET , CS A105N , STD , BE , HDR/BRN 10X2 PLWC1B00STDB20K 1
N 30965329 , SP-97 , FBE INT COATED PIPE SIZE SCHEDULE SPECIFICATION

EL +104721 3 45 LR ELBOW , CS A234-WPB , SMLS , BE , 10 P4LC34SMBESTDE5 1 REFER MTO REFER MTO REFER MTO

STD , B16.9 , FBE INT COATED


4 90 LR ELBOW , CS A234-WPB , SMLS , BE , 10 P9LC34SMBESTDE5 1
FLG5 GAS9 BLT11 STD , B16.9 , FBE INT COATED

GAS10 BLT12 8. WELDING STRESS RELIEF - YES NO


X
FLANGES RADIOGRAPHY % 100% X-RAY SPOT X-RAY 01-SAMSS-10 SHOP FIELD

1866
597 178 5 WN FLG , CS A105N , CL150 , FF , STD , 10 PFWC1B15FFSTD5V 2 9. TESTING SHOP HYDROSTATIC TEST - YES
THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS
NO

10"N.B. REST B16.5 , FBE INT COATED FLANGED.

1435 6 WN FLG , CS A105N , CL150 , FF , STD , 10 PFWC1B15FFSTDTO 1 10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION
15 237 1LE0U
B16.5 , FBE INT COATED , C/W JACK SAES-L-105 CLASS . ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.

130 SCREWS , PROJ STD DRG NO AC-036630 11. INSULATION SHOWN ON DRAWING
REFER BELOW TABLE
1 12. REFER TO HYDROSTATIC TEST DIAGRAM FOR TEST LIMIT AND PRESSURE.

14 7 WN FLG , CS A105N , CL150 , FF , STD , 2 PFWC1B15FFSTD5V 1 13. FOR SMALL BORE LINES (UPTO 1-1/2" ) DIMENSIONS, ROUTING & SUPPORTING SHALL BE FIELD ADJUSTED.
14. ALL DIMENSIONS AND COORDINATES ARE IN MM. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OF THE SPOOL.

STEM WEST B16.5 , FBE INT COATED 15. FOR INTERNAL LINED PIPE, LINING SHALL BE DONE AFTER SPOOL FABRICATION & COMPLETION OF ALL HOT WORKS.

3 16. TIE-IN POINTS CO-ORDINATES TO BE VERIFIED BY CONTRACTOR IN FIELD.

2 17. PAINTING / COATING SHALL BE IN ACCORDANCE WITH SAES-H-001/002 AND PROJECT APPROVED COATING MAP.
18. SEAL WELDING REQUIREMENT OF THREADED JOINTS SHALL BE AS PER CL.NO.9 OF SAES-L-110.
10X2"N.B. 19. WELDS SHALL BE RADIOGRAPHED AS PER SAES-W-012 (FOR LINES WITH DESIGN CODE ASME B31.8/B31.4) &

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
22
AS PER SAES-W-011 (FOR LINES WITH DESIGN CODE ASME B31.3).
32 FIELD MATERIALS
12
20. CONSTRUCTION OF PLANT PIPING SHALL BE IN ACCORDANCE WITH SAES-L-350.
01 21. ALL INTERFACE CONNECTIONS WITH OTHER PROJECT (WHEREVER APPLICABLE), CO-ORDINATES AND ELEVATIONS
SHALL BE VERIFIED BY CONTRACTOR IN FIELD.
22. INTERNAL FBE LINING CONTRACTOR TO VERIFY AND CONFIRM THE BREAK UP FLANGES PRIOR TO THE SPOOL FABRICATION
PT N.B. 23. PLANT COORDINATE SYSTEM HAS BEEN FOLLOWED AS PART OF BI-10-00930.

FLG7 GAS10 BLT12 NO DESCRIPTION (INS) STOCK CODE QTY HIGH POINT OF PLANT DATUM ELEVATION 100.000m WHICH EQUALS 2.05m ABOVE MEAN SEA LEVEL

SPOOLS TO BE FABRICATED BY VENDOR


6
81 FITTINGS NO.
PIECES
MARK NO. SIZE
WEIGHT
LBS
NO.
PIECES
MARK NO. SIZE
WEIGHT
LBS

8 FIG-8 BLANK , CS A516-70 , CL150 , RF , 10 PK8C7G15RF000IX 1

2411
FBE INT COATED PROJ STD DRG , NO
AD-036633 (FOR SIZES 2" & ABOVE)

1
GASKETS
9 GASKET , SYNTHETIC W/ CENTERING RING , 10 PGGNSC20115BL02 4
FULL FACE , 1/16" (1.6 MM) THK ,
CL150 , B16.5 , B16.21
10 GASKET , SYNTHETIC W/ CENTERING RING , 2 PGGNSC20115BL02 2
20
79 FULL FACE , 1/16" (1.6 MM) THK , SPOOLS TO BE FABRICATED BY SAUDI ARAMCO
CL150 , B16.5 , B16.21 NO.
PIECES
MARK NO. SIZE
NO.
PIECES
MARK NO. SIZE

BOLTS
11 STUD BOLT (CONT) , CR-MO A193-B7 , W/ 2 7/8 PB1BLCSACS16002 24
4 SF HVY HEX NUTS , A194-2H , B1.1 ,
CERAMIC-FLUOROPOLYMER COATED , DIA
(IMP) X LEN (MET) - 115 mm Length
12 STUD BOLT (CONT) , CR-MO A193-B7 , W/ 2 5/8 PB1BLCSACS16002 8
1079

SF HVY HEX NUTS , A194-2H , B1.1 ,


CERAMIC-FLUOROPOLYMER COATED , DIA
(IMP) X LEN (MET) - 80 mm Length
FLG6 GAS9 REFERENCE DRAWINGS
8
1

TAIL W VALVES / IN-LINE ITEMS DRAWING CONTROL SHEET FOR J.O. 10-00930-0002 RD-086148
17 OPEN 13 GATE VALVE , CS A216-WCB , CL150 , FF , 10 PVGC2S15FF8ABWV 1 PIPING PLAN RA-685466.001
331 B16.5 , B16.10 DIMS , API 600, OS&Y , P&ID NA-518622.008
BB , B61/B62 BRONZE TRIM (LESS THAN LINE DESIGNATION TABLE RD-912750
16% ZINC) , INT FBE LND BODY , HW
13 HYDROSTATIC TEST DIAGRAM RA-901147-001
STEM SOUTH GAS9 14 GATE VALVE , CS A216-WCB , CL150 , FF , 2 PVGC2S15FF8ABWV 1
PROJECT PIPING MATERIAL SPECIFICATION RE-685500
B16.5 , B16.10 DIMS , API 600, OS&Y ,
BB , B61/B62 BRONZE TRIM (LESS THAN PIPE SUPPORT STANDARD RE-901041

12X10"N.B. 16% ZINC) , INT FBE LND BODY , HW


FLG5 GAS9 BLT11 15 BLIND FLG , CS A105N , CL150 , FF , 2 PFBC1B15FF0005V 1
B16.5 , FBE INT COATED
FOR CONT. SEE
RB-901089 PIECE MARKS
OW-5067 REVISION VALIDATION

E 30087122 130 THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

N 30960049 REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

EL +103190 10-00930-0002-001

Worley DESIGN CERTIFICATION

ENGG./DATE
(DESIGN AGENCY)
CERTIFIED BY/DATE
REVIEW FOR KEY DRAWINGS
REQUIRED
CONST. AGENCY/DATE
(SAUDI ARAMCO)
OPERATIONS/DATE BY/DATE
OTHER

RAM WAB MKH AMM


04/07/23 04/07/23 04/07/23 04/07/23

07 May 2023 REV.NO. DATE REVISION DESCRIPTION

00 04/07/23 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR
10-00930-0002
ISSUED FOR CONSTRUCTION
CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
ISO 10"-OW-5063-1LE0U ISO
EQUALIZATION TANKS
CHEMICAL DESIGN OPERATING TEST PRESS. TEST RADIOGRAPHY % INSULATION TRACING PAINTING STRESS LINE ID
CLEANING TEMP. PRESS. TEMP. PRESS. (PSIG) MEDIUM SHOP FIELD THK. TYPE SYS NO. TERMINAL NORTH
(DEG. F) (PSIG) (DEG. F) (MM) SAUDI ARABIA
(PSIG) RAS TANURA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

NO 150 262 120 49 NOTE-12 WATER NOTE-19 NOTE-19 0 mm NO NOTE-17 SYS-02 OW-5063
060 L RB-901085 038 00
Saudi Aramco 2825 ENG. (05/05)