You are on page 1of 1

UP STANDARD DETAIL REFERENCE DRAWINGS

DETAIL OF HEAVY WELDING BOSSES FOR THREADED CONNECTIONS AE-036175

N
AWAY AWAY
CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING
INSULATION DETAILS FOR HOT PIPING
AD-036627
AA-036911

SHOP MATERIALS INSULATION DETAILS FOR COLD PIPING AA-036913

INSTALLATION OF JACK SCREWS FOR FLANGED JOINTS AC-036630

TOWARD TOWARD PT N.B.


NOTES
NO DESCRIPTION (INS) STOCK CODE QTY
1. MATERIAL SHOWN WITH A BROKEN LINE AND SPOOLS LISTED IN THE SAUDI ARAMCO
DOWN
PIPE FABRICATION LIST ARE NOT TO BE FURNISHED BY THE VENDOR.

2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).

1 PIPE , CS API 5L-B-PSL2 , SMLS , BE , 10 PPPCPVSMBESTD5F 22.5 M 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.

STD , B36.10M , FBE INT COATED 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.

(B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.

5. FABRICATION SHALL BE IN ACCORDANCE WITH SAUDI ARAMCO SPECIFICATION 01-SAMSS-10.


FITTINGS 6. GASKET ALLOWANCE

7. PIPING MATERIAL IS
2 45 LR ELBOW , CS A234-WPB , SMLS , BE , 10 P4LC34SMBESTDE5 4
STD , B16.9 , FBE INT COATED PIPE SIZE SCHEDULE SPECIFICATION

REFER MTO REFER MTO REFER MTO

FLANGES
3 WN FLG , CS A105N , CL150 , FF , STD , 10 PFWC1B15FFSTD5V 6
B16.5 , FBE INT COATED
FOR CONT. SEE 8. WELDING STRESS RELIEF - YES NO
X
SHT 034 RADIOGRAPHY % 100% X-RAY SPOT X-RAY 01-SAMSS-10 SHOP FIELD

E 30152625 FIELD MATERIALS 9. TESTING SHOP HYDROSTATIC TEST - YES NO

FLG3 GAS4 BLT5 THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS

N 30996147 FLANGED.

EL +100487 PT N.B. 10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION

NO DESCRIPTION (INS) STOCK CODE QTY SAES-L-105 CLASS 1LE0U . ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.

1
10"N.B. 25 REFER BELOW TABLE

137
11. INSULATION SHOWN ON DRAWING
51 GASKETS 12. REFER TO HYDROSTATIC TEST DIAGRAM FOR TEST LIMIT AND PRESSURE.
13. FOR SMALL BORE LINES (UPTO 1-1/2" ) DIMENSIONS, ROUTING & SUPPORTING SHALL BE FIELD ADJUSTED.
14. ALL DIMENSIONS AND COORDINATES ARE IN MM. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OF THE SPOOL.

4 GASKET , SYNTHETIC W/ CENTERING RING , 10 PGGNSC20115BL02 3 15. FOR INTERNAL LINED PIPE, LINING SHALL BE DONE AFTER SPOOL FABRICATION & COMPLETION OF ALL HOT WORKS.
16. TIE-IN POINTS CO-ORDINATES TO BE VERIFIED BY CONTRACTOR IN FIELD.
119 FULL FACE , 1/16" (1.6 MM) THK , 17. PAINTING / COATING SHALL BE IN ACCORDANCE WITH SAES-H-001/002 AND PROJECT APPROVED COATING MAP.
18. SEAL WELDING REQUIREMENT OF THREADED JOINTS SHALL BE AS PER CL.NO.9 OF SAES-L-110.
4
CL150 , B16.5 , B16.21
812

19. WELDS SHALL BE RADIOGRAPHED AS PER SAES-W-012 (FOR LINES WITH DESIGN CODE ASME B31.8/B31.4) &

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
S6
8
AS PER SAES-W-011 (FOR LINES WITH DESIGN CODE ASME B31.3).
598
20. CONSTRUCTION OF PLANT PIPING SHALL BE IN ACCORDANCE WITH SAES-L-350.

GL01-10 BOLTS 21. ALL INTERFACE CONNECTIONS WITH OTHER PROJECT (WHEREVER APPLICABLE), CO-ORDINATES AND ELEVATIONS
SHALL BE VERIFIED BY CONTRACTOR IN FIELD.

259 22. INTERNAL FBE LINING CONTRACTOR TO VERIFY AND CONFIRM THE BREAK UP FLANGES PRIOR TO THE SPOOL FABRICATION

5 STUD BOLT (CONT) , CR-MO A193-B7 , W/ 2 7/8 PB1BLCSACS16002 36 23. PLANT COORDINATE SYSTEM HAS BEEN FOLLOWED AS PART OF BI-10-00930.
HIGH POINT OF PLANT DATUM ELEVATION 100.000m WHICH EQUALS 2.05m ABOVE MEAN SEA LEVEL

SF HVY HEX NUTS , A194-2H , B1.1 , SPOOLS TO BE FABRICATED BY VENDOR


259 REST
120 CERAMIC-FLUOROPOLYMER COATED , DIA NO.
MARK NO. SIZE
WEIGHT NO.
MARK NO. SIZE
WEIGHT

15
PIECES LBS PIECES LBS
(IMP) X LEN (MET) - 115 mm Length
1

77
2
PIPE SUPPORTS
2 6 GUIDE FOR BARE PIPE 10 GL01-10 2
17
54
PIECE MARKS
0

4 119 120 121


559

46 FLG3

FLG3 GAS4 BLT5 SPOOLS TO BE FABRICATED BY SAUDI ARAMCO


233
1

NO. NO.
MARK NO. SIZE MARK NO. SIZE
PIECES PIECES

07
259 53
3
23 2
FLG3 121

FLG3 GAS4 BLT5


259
46 2
4
596 29
99 Worley
REFERENCE DRAWINGS
07 May 2023 DRAWING CONTROL SHEET FOR J.O. 10-00930-0002 RD-086148
S6 PIPING PLAN RA-685466.001
0
3

GL01-10 P&ID NA-518622.008


429
955

ISSUED FOR CONSTRUCTION LINE DESIGNATION TABLE RD-912750

REST HYDROSTATIC TEST DIAGRAM RA-901147-001


1
PROJECT PIPING MATERIAL SPECIFICATION RE-685500
10"N.B.
70 PIPE SUPPORT STANDARD RE-901041
90

FLG3

FOR CONT. SEE REVISION VALIDATION

SHT 036 THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

E 30129834 REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

N 30988613 10-00930-0002-001

EL +100487 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

RAM WAB MKH AMM


04/07/23 04/07/23 04/07/23 04/07/23
REV.NO. DATE REVISION DESCRIPTION

00 04/07/23 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR
10-00930-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
ISO 10"-OW-5063-1LE0U ISO
EQUALIZATION TANKS
CHEMICAL DESIGN OPERATING TEST PRESS. TEST RADIOGRAPHY % INSULATION TRACING PAINTING STRESS LINE ID
CLEANING TEMP. PRESS. TEMP. PRESS. (PSIG) MEDIUM SHOP FIELD THK. TYPE SYS NO. TERMINAL NORTH
(DEG. F) (PSIG) (DEG. F) (MM) SAUDI ARABIA
(PSIG) RAS TANURA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

NO 150 262 120 49 NOTE-12 WATER NOTE-19 NOTE-19 0 mm NO NOTE-17 SYS-02 OW-5063
060 L RB-901085 035 00
Saudi Aramco 2825 ENG. (05/05)

SA-TR-799 RESTRICTED SMART CADD-03

You might also like