You are on page 1of 1

level

Kilometraj
road passage

existing
level crossing

design line
Designed overpass

S60-760-1:14
Ax halta / HALT Axis

Radius of vertical curve, in m

bisector of vertical curve, in m


Tangent of vertical curve, in m
Ax statie / Station Axis
Pasaj superior proiectat /

Dismantled level crossing

SUPRAINALTARE / CANT
Schimbator de cale ferata / Railway turnout
Trecere la nivel dezafectata /
Pasaj rutier existent / Existing

PJ (STtart) km 40+472.79 - Prima Joanta


Nivel teren / Ground level

Length of parabolic junction curve, in m


DG - Diferenta declivitati / Slope difference
Nivel fund sant / Ditch bottom

NSS Existent / Upper level rail


Nivel platforma/ Platform level
NSS proiectat / Upper level rail

UJ (Direct End) km 40+418.57 - Ultima Joanta


VERTICAL CONNECTION
Trecere la nivel proiectata / Designed

RACORDARE VERTICALA

NSS Existent / Upper level rail existing


STATIA / STATION

NSS teren existent / Existing terrain level


LVC - Lungimea curbei de racordare parabolica /
RV - Raza curbei de racordare in plan vertical, m /

TV - Tangenta curbei de racordare in plan vertical /

Diagrama curburii / CURVATURE DIAGRAM


BV - Bisectoarea curbei de racordare in plan vertical /

Kilometraj proiectat / DESIGNED CHAINAGE


NSS Proiectat / Upper level rail designed line

Diferente pe verticala / VERTICAL DISTANCE


Pod / Podet proiectat / Designed culvert / Bridge
645380.00 -0.01 146.97 146.96

MAXIMUM DESIGN SPEED / VITEZA PROIECTATA


645+400
645400.00 0.04 146.89 146.93

645420.00 -1.61 148.51 146.90

645440.00 -0.34 147.21 146.87

-1.11 147.97 146.86

01
645460.00 -1.78 148.62 146.84

Spre Cluj
645480.00 -0.23 147.04 146.81

645+500
645500.00 -1.06 147.84 146.78

02
EL

TV
BV
RV

DG
KM

LVC

EL= 146.767
KM= 645+511.126

645520.00 -0.71 147.46 146.75


RV29

EL= 146.714
KM= 645+532.126

645540.00 -1.49 148.18 146.69


-2.10‰
21.000
-0.006
10.500
10000.000
146.752
645521.626

-1.70 148.35 146.65

03
645560.00 -0.54 147.15 146.61

645580.00 -0.01 146.55 146.54

FIR

FIR
I
II
645+600
645600.00 -0.70 147.17 146.47

04
645620.00 -1.01 147.41 146.40

645640.00 -0.57 146.90 146.33

-0.16 146.45 146.29

05
645660.00 0.22 146.03 146.25
992.000

645680.00 -0.11 146.29 146.18

645+700
645700.00 0.19 145.92 146.11

06
645720.00 0.29 145.75 146.04
PANOURI FONOABSORBANTE PARTEA DREAPTA / NOISE ABSORBING PANELS RIGHT SIDE

1
3
5
645740.00 0.24 145.73 145.97

7
P=-3.60‰

11
-0.49 146.42 145.93
D=-1.545 L=429.066

07
645760.00 0.36 145.53 145.89

4
5
7
8

II
6

III

STATIA
TILEAGD
14
645780.00 0.22 145.60 145.82

12

6
8

4
2
645+800
Nivel teren existent

-0.24
Existing Terrain Level

645800.00 145.99 145.75

08
645820.00 -0.17 145.85 145.68

645840.00 0.22 145.39 145.61

0.35 145.22 145.57

645860.00 0.12 145.41 145.53


09

645880.00 0.34 145.12 145.46


645+900

645900.00 -1.05 146.44 145.39


10

645920.00 -0.05 145.37 145.32

EL= 145.263
EL

TV
BV
RV

DG
KM

LVC

KM= 645+935.192
645940.00 -0.13 145.38 145.25

0.14 145.08 145.22


RV30

645960.00 0.35 144.85 145.20


EL= 145.199
11

KM= 645+966.192
3.10‰
31.000
0.012
15.500
-10000.000
145.207
645950.692

645980.00 -0.03 145.22 145.19


FIR

FIR
I
II
646+000

646000.00 -0.22 145.40 145.18


12

646020.00 0.08 145.09 145.17

646040.00 -1.09 146.25 145.16

-1.15 146.31 145.16

646060.00 -1.69 146.84 145.15


13

646080.00 0.16 144.98 145.14


646+100

646100.00 0.37 144.76 145.13

646120.00 0.41 144.71 145.12


14

646140.00 -0.16 145.27 145.11

0.19 144.92 145.11

646160.00 -0.15 145.25 145.10

Km 646+165
15

646180.00 0.09 145.00 145.09


1

3
5
7

9
646+200

646200.00 0.42 144.66 145.08


11
4

II
III

646220.00 0.29 144.78 145.07


STATIA
18
16

OSORHEI
16

14
12
10

646240.00 -0.78 145.84 145.06


6

-0.66 145.72 145.06

646260.00 0.51 144.54 145.05


17

646280.00 0.42 144.62 145.04


1
646+300

646300.00 0.32 144.71 145.03

BRIDGE
POD
km pr.646+316
646320.00 1.75 143.27 145.02 km ex. 656+342
143.48

+646+326
18

3
144.22

FIR

FIR
5

646340.00 0.35 144.66 145.01


I
II

0.37 144.64 145.01


P=-0.50‰

37

646360.00 0.14 144.86 145.00


41

39
D=-0.400 L=800.000

8
9
10
11
45

4
5

7
6
III

646380.00 0.01 144.98 144.99


II
1
19

STATIA
ORADEA EST
55
646+400

646400.00 -0.84 145.82 144.98


12

646420.00 -2.25 147.22 144.97


10
8
6
4
20

646440.00 0.09 144.87 144.96

0.23 144.73 144.96


NSS proiectat

646460.00 0.21 144.74 144.95


Designed Top of Rail

646480.00 0.38 144.56 144.94


21

5
FIR

FIR
7
I
II

9
11
646+500

646500.00 0.35 144.58 144.93


13

27
19
17

31
21

33

646520.00 0.23 144.69 144.92


35

1B
2B
7A
6A
VA
43
IIIA

IVA
2A

64

STATIA
ORADEA
50
22

646540.00 0.14 144.77 144.91


1A

81

42
76

0.13 144.78 144.91


72

14
48

646560.00 0.11 144.79 144.90


6024

12
10
8 6
4

646580.00 0.08 144.81 144.89


2
23
646+600

646600.00 0.07 144.81 144.88


FIR

FIR
I
II

646620.00 0.06 144.81 144.87

0.06
24

646640.00 144.80 144.86

0.06 144.80 144.86

646660.00 -0.98 145.83 144.85

646680.00 0.14 144.70 144.84


25

1
646+700

646700.00 -0.13 144.96 144.83


3
7

5
9
11
13
15

646720.00 -0.90 145.72 144.82


19
17 21

49
27
EL

TV
BV
RV

DG
KM

29
LVC

EL= 144.813
6
8
5

III
IV

646740.00 0.13 144.68 144.81


2

KM= 646+738.192
1
26

9
14

10
12
13

7
11

STATIA

0.18 144.62 144.80


30
RV31

EPISCOPIA BIHOR
40

24

646760.00 -0.42 145.20 144.78 EL= 144.770


KM= 646+763.192
32
-2.50‰
25.000
-0.008
12.500
10000.000
144.807
646750.692

14
20/22

646780.00 0.11 144.61 144.72


2
LONGITUDINAL DRAINS / DRENURI LONGITUDINALE

27
Nivel teren existent
Existing Terrain Level

646+800

646800.00 0.03 144.63 144.66

646820.00 0.03 144.57 144.60

646840.00 -0.85 145.39 144.54


28

-0.16 144.67 144.51

646860.00 -0.69 145.17 144.48


FIR
I

646880.00 -0.26 144.68 144.42


29
646+900

646900.00 0.16 144.20 144.36

646920.00 -0.44 144.74 144.30

646940.00 -1.24 145.48 144.24


Spre Ungaria

-0.48 144.69 144.21


30

646960.00 -1.22 145.40 144.18

646980.00 144.12 144.12


647+000

647000.00 -0.72 144.78 144.06

647020.00 -1.85 145.85 144.00


BENEFICIAR

647040.00 0.19 143.75 143.94

-0.04 143.95 143.91


COMPANIA NAȚIONALĂ DE CĂI FERATE

647060.00 -0.03 143.91 143.88

647080.00 -1.02 144.84 143.82


647+100

-0.21
NSS proiectat

647100.00 143.97 143.76


Designed Top of Rail
P=-3.00‰

ANTREPRENOR SI PROIECTANT GENERAL


D=-2.113 L=704.308

647120.00 0.12 143.58 143.70

647140.00 -0.71 144.35 143.64

-0.93 144.54 143.61


PROIECTANT DE SPECIALITATE

647160.00 -0.72 144.30 143.58


Verificat
Proiectat
SPECIFICATIE

Codificare plansa
Manager de proiect

647180.00 -0.08 143.60 143.52


NUME
647+200

647200.00 -0.41 143.87 143.46


ing. Bãzãrînca Cristina
ing. Giorgio Carrapetta
CONTRACT: 173/07.12.2022

ing. Domenico Ceraudo

647220.00 -0.04 143.44 143.40


CTA4-CO-DWG-PAC-00-LUCF-PFL-017-WB01

647240.00 -2.27 145.61 143.34


SCARA:

1:1000/100

-3.03 146.34 143.31


DATA: Mai 2023

647260.00 -0.77 144.05 143.28


SEMNATURA DENUMIRE PROIECT:
FAZA: P.A.C.

DENUMIRE DESEN:

647280.00 -0.15 143.37 143.22


PLAN 17 / 30
647+300

647300.00 -0.90 144.06 143.16


PROFIL LONGITUDINAL
PROIECTARE ȘI EXECUȚIE A LUCRĂRILOR AFERENTE OBIECTIVULUI DE
Nivel teren existent
Existing Terrain Level

647320.00 -0.62 143.72 143.10


INVESTIȚII ”ELECTRIFICAREA ȘI REABILITAREA LINIEI DE CALE FERATǍ CLUJ
NAPOCA - ORADEA - EPISCOPIA BIHOR”, LOT 4 ALEȘD - FRONTIERĂ UNGARIA
WB01
REVIZIA

647340.00 -0.20 143.24 143.04

0.01 143.00 143.01


DATA
Mai 2023

647360.00 -0.06 143.04 142.98


Prima editie

647380.00 -0.24 143.16 142.92


COMENTARII
647+400

647400.00 -1.00 143.86 142.86