You are on page 1of 1

level

Kilometraj
road passage

existing
level crossing

design line
Designed overpass

S60-760-1:14
Ax halta / HALT Axis

Radius of vertical curve, in m

bisector of vertical curve, in m


Tangent of vertical curve, in m
Ax statie / Station Axis
Pasaj superior proiectat /

Dismantled level crossing

SUPRAINALTARE / CANT
Schimbator de cale ferata / Railway turnout
Trecere la nivel dezafectata /
Pasaj rutier existent / Existing

PJ (STtart) km 40+472.79 - Prima Joanta


Nivel teren / Ground level

Length of parabolic junction curve, in m


DG - Diferenta declivitati / Slope difference
Nivel fund sant / Ditch bottom

NSS Existent / Upper level rail


Nivel platforma/ Platform level
NSS proiectat / Upper level rail

UJ (Direct End) km 40+418.57 - Ultima Joanta


VERTICAL CONNECTION
Trecere la nivel proiectata / Designed

RACORDARE VERTICALA

NSS Existent / Upper level rail existing


STATIA / STATION

NSS teren existent / Existing terrain level


LVC - Lungimea curbei de racordare parabolica /
RV - Raza curbei de racordare in plan vertical, m /

TV - Tangenta curbei de racordare in plan vertical /

Diagrama curburii / CURVATURE DIAGRAM


BV - Bisectoarea curbei de racordare in plan vertical /

Kilometraj proiectat / DESIGNED CHAINAGE


NSS Proiectat / Upper level rail designed line

Diferente pe verticala / VERTICAL DISTANCE


Pod / Podet proiectat / Designed culvert / Bridge

MAXIMUM DESIGN SPEED / VITEZA PROIECTATA


647+000
647000.00 -0.72 144.78 144.06

647020.00 -1.85 145.85 144.00

647040.00 0.19 143.75 143.94

-0.04 143.95 143.91

01
647060.00 -0.03 143.91 143.88

Spre Cluj
647080.00 -1.02 144.84 143.82

647+100
-0.21

NSS proiectat
647100.00 143.97 143.76

Designed Top of Rail

02
P=-3.00‰
D=-2.113 L=704.308

647120.00 0.12 143.58 143.70

647140.00 -0.71 144.35 143.64

-0.93 144.54 143.61

03
647160.00 -0.72 144.30 143.58

647180.00 -0.08 143.60 143.52

FIR

FIR
I
II
647+200
647200.00 -0.41 143.87 143.46

04
647220.00 -0.04 143.44 143.40

647240.00 -2.27 145.61 143.34

-3.03 146.34 143.31

647260.00 -0.77 144.05 143.28

05
647280.00 -0.15 143.37 143.22

647+300
647300.00 -0.90 144.06 143.16

06
Nivel teren existent
Existing Terrain Level

647320.00 -0.62 143.72 143.10

1
3
647340.00 -0.20 143.24 143.04

7
9
0.01 143.00 143.01

11
647360.00 -0.06 143.04 142.98

07

4
5
7
8

II
6

III

STATIA
TILEAGD
647380.00 -0.24 143.16 142.92

14
12

6
8

4
647+400
647400.00 -1.00 143.86 142.86

2
08
647420.00 -10.45 153.25 142.80

Km 647+432
EL

TV
BV
RV

DG
KM

647440.00 0.01 142.73 142.74


LVC

EL= 142.729
KM= 647+443.500
0.04 142.67 142.71
RV32

647460.00 0.26 142.41 142.67


EL= 142.633
09
KM= 647+466.500
-2.30‰
23.000
-0.007
11.500
10000.000
142.694
647455.000

647480.00 0.08 142.48 142.56


647+500

647500.00 0.26 142.20 142.46

0.03
10

647520.00 142.32 142.35


201.000

-0.17 142.41 142.24


647540.00 -0.17 142.41 142.24

-0.17 142.36 142.19

647560.00 -0.04 142.18 142.14


Lt= 50.00

11

647580.00 -0.01 142.04 142.03


PANOURI FONOABSORBANTE PARTEA STANGA / NOISE ABSORBING PANELS LEFT SIDE

0.10 141.88 141.98


FIR

FIR
I
II
647+600

647600.00 0.04 141.89 141.93

647620.00 -0.04 141.86 141.82


12

Km 647+633

647640.00 0.13 141.58 141.71

0.16 141.50 141.66

647660.00 0.15 141.46 141.61

LEVEL CROSSING/TRECERE LA NIVEL


13

647680.00 0.13 141.37 141.50 km 647+767


km ex. 647+794
647+700

647700.00 0.17 141.23 141.40


NSS proiectat

647720.00 0.11 141.18 141.29


L= 265.00
R=-900.00
Designed Top of Rail

14

647740.00 -0.06 141.24 141.18

-0.11 141.24 141.13

647760.00 -0.16 141.24 141.08

647780.00 -0.26 141.23 140.97


15

3
5
7

9
647+800

647800.00 -0.25 141.12 140.87


11
4

II
III

-0.06
1

647820.00 140.82 140.76


STATIA
18
16

OSORHEI
16

14
12

647840.00 0.04 140.61 140.65


10
6

0.17 140.43 140.60


2

0.19 140.38 140.57


647860.00 0.13 140.42 140.55
Lt= 50.00

647880.00 0.10 140.34 140.44


17
647+900

0.17
1

647900.00 140.17 140.34


0.20 140.11 140.31

647920.00 0.21 140.02 140.23


18

647940.00 0.19 139.93 140.12


FIR

FIR
5
L= 84.73

0.17
II

139.90 140.07

647960.00 0.16 139.86 140.02


37
41

39

8
9
10
11
45

647980.00 0.11 139.80 139.91


4
5

7
6
III
II
1
19

0.15 139.71 139.86


STATIA
648+000

0.15
ORADEA EST

648000.00 139.66 139.81


55

Km 648+012
648020.00 0.18 139.52 139.70
12

10
Lt= 81.00

8
6
4
20

0.14
2

648040.00 139.45 139.59

0.07 139.47 139.54

648060.00 0.07 139.42 139.49

-0.02 139.45 139.43


Nivel teren existent
Existing Terrain Level
P=-5.30‰

648080.00 0.08 139.30 139.38


D=-6.514 L=1228.992

21

5
FIR

FIR
7
648+100

648100.00 0.16 139.12 139.28


I
II

9
11
13

27
19
17

31

648120.00 0.06 139.11 139.17


21

33
35

1B
2B
7A
6A
VA
43
IIIA

IVA
2A

64

0.05
STATIA

648140.00 139.01 139.06


ORADEA
50
22

1A

81

42

0.22 138.79 139.01


76

72

648160.00 -1.24 140.20 138.96


14
48
6024

12
10
8

648180.00 0.18 138.67 138.85


6
4

2
23
648+200

648200.00 -0.54 139.29 138.75


FIR

FIR
I
II

648220.00 0.21 138.43 138.64


NSS proiectat
Designed Top of Rail

648240.00 -0.58 139.11 138.53


24

-0.59 139.07 138.48

648260.00 -1.17 139.60 138.43


510.000

L= 408.58
R=575.00

648280.00 -1.08 139.40 138.32


25
648+300

648300.00 -0.66 138.88 138.22


1

3
7

5
9
11

648320.00 -0.42 138.53 138.11


13
15

19
17 21

49
27
PANOURI FONOABSORBANTE PARTEA DREAPTA / NOISE ABSORBING PANELS RIGHT SIDE

648340.00 -0.27 138.27 138.00


29
6
8
5

III
IV

1
26

9
14

10
12
13

7
11

-0.30 138.25 137.95


STATIA
30

EPISCOPIA BIHOR

648360.00 -0.38 138.28 137.90


40

24
Nivel teren existent
Existing Terrain Level

Cap X - Km 643+315
32

14
20/22

648380.00 0.22 137.57 137.79


4
2
27
648+400

648400.00 0.20 137.49 137.69

648420.00 -0.99 138.57 137.58

648440.00 0.08 137.39 137.47

-0.16 137.58 137.42


28

648460.00 -0.12 137.49 137.37


FIR

0.05
I

137.22 137.27
648480.00 0.09 137.17 137.26
648+500

648500.00 0.13 137.03 137.16


29
Lt= 81.00

648520.00 -0.21 137.26 137.05


Km 648+522

648540.00 0.05 136.89 136.94

-0.23 137.12 136.89


Spre Ungaria
30

648560.00 -0.16 137.00 136.84


-0.14 136.98 136.84

648580.00 0.14 136.59 136.73


648+600

648600.00 0.10 136.53 136.63

648620.00 -0.09 136.61 136.52


BENEFICIAR

648640.00 0.09 136.32 136.41

-0.01 136.37 136.36

-0.01
COMPANIA NAȚIONALĂ DE CĂI FERATE

648660.00 136.32 136.31


EL

TV
BV
RV

EL= 136.257
DG
KM

LVC

KM= 648+669.492

648680.00 0.14 136.07 136.21


RV33

EL= 136.146
648+700

648700.00 0.02 136.12 136.14 KM= 648+698.491


2.90‰
29.000
0.011
14.500
-10000.000
136.180
648683.992

L= 302.32

ANTREPRENOR SI PROIECTANT GENERAL

648720.00 0.18 135.91 136.09

648740.00 0.06 135.99 136.05

0.14 135.88 136.02


PROIECTANT DE SPECIALITATE

648760.00 0.18 135.82 136.00


NSS proiectat

Verificat
Designed Top of Rail

Proiectat
SPECIFICATIE

0.06
Codificare plansa

648780.00 135.89 135.95


Manager de proiect
648+800

648800.00 0.01 135.89 135.90


PJ (Direct End) KM 648+804.25
NUME

ing. Bãzãrînca Cristina


ing. Giorgio Carrapetta
CONTRACT: 173/07.12.2022

ing. Domenico Ceraudo

648820.00 -0.03 135.88 135.85


3Orad_Est
S60-300-1:9

CTA4-CO-DWG-PAC-00-LUCF-PFL-018-WB01

PJ (STtart) KM 648+837.48
648840.00 -0.01 135.82 135.81

0.07 135.71 135.78


SCARA:

1:1000/100
DATA: Mai 2023

648860.00 0.04 135.72 135.76


0.07 135.68 135.75
SEMNATURA DENUMIRE PROIECT:

0.02
FAZA: P.A.C.

648880.00 135.69 135.71


DENUMIRE DESEN:
Lt= 50.00
648+900

0.05
PLAN 18 / 30

648900.00 135.61 135.66


PROFIL LONGITUDINAL

-0.09 135.72 135.63


PROIECTARE ȘI EXECUȚIE A LUCRĂRILOR AFERENTE OBIECTIVULUI DE

648920.00 -0.39 136.00 135.61


INVESTIȚII ”ELECTRIFICAREA ȘI REABILITAREA LINIEI DE CALE FERATǍ CLUJ
NAPOCA - ORADEA - EPISCOPIA BIHOR”, LOT 4 ALEȘD - FRONTIERĂ UNGARIA

648940.00 -0.19 135.76 135.57


WB01
REVIZIA

-0.78 136.32 135.54


DATA
Mai 2023

648960.00 -1.57 137.09 135.52

-0.34
Prima editie

648980.00 135.81 135.47


P=-2.40‰

COMENTARII
D=-1.435 L=598.008

649+000

649000.00 -0.75 136.17 135.42


L= 198.59
R=950.00

You might also like