You are on page 1of 1

level

Kilometraj
road passage

existing
level crossing

design line
Designed overpass

S60-760-1:14
Ax halta / HALT Axis

Radius of vertical curve, in m

bisector of vertical curve, in m


Tangent of vertical curve, in m
Ax statie / Station Axis
Pasaj superior proiectat /

Dismantled level crossing

SUPRAINALTARE / CANT
Schimbator de cale ferata / Railway turnout
Trecere la nivel dezafectata /
Pasaj rutier existent / Existing

PJ (STtart) km 40+472.79 - Prima Joanta


Nivel teren / Ground level

Length of parabolic junction curve, in m


DG - Diferenta declivitati / Slope difference
Nivel fund sant / Ditch bottom

NSS Existent / Upper level rail


Nivel platforma/ Platform level
NSS proiectat / Upper level rail

UJ (Direct End) km 40+418.57 - Ultima Joanta


VERTICAL CONNECTION
Trecere la nivel proiectata / Designed

RACORDARE VERTICALA

NSS Existent / Upper level rail existing


STATIA / STATION

NSS teren existent / Existing terrain level


LVC - Lungimea curbei de racordare parabolica /
RV - Raza curbei de racordare in plan vertical, m /

TV - Tangenta curbei de racordare in plan vertical /

Diagrama curburii / CURVATURE DIAGRAM


BV - Bisectoarea curbei de racordare in plan vertical /

Kilometraj proiectat / DESIGNED CHAINAGE


NSS Proiectat / Upper level rail designed line

Diferente pe verticala / VERTICAL DISTANCE


Pod / Podet proiectat / Designed culvert / Bridge

MAXIMUM DESIGN SPEED / VITEZA PROIECTATA


RV21

639+000
639000.00 -0.94 164.19 163.25

EL= 163.240
3.50‰
35.000
0.015
17.500
-10000.000
163.249
638990.692

KM= 639+008.192

639020.00 -0.64 163.87 163.23

639040.00 -1.24 164.46 163.22

-0.83 164.05 163.22

01
639060.00 -1.19 164.40 163.21

Spre Cluj
639080.00 -0.47 163.67 163.20

639+100
639100.00 -0.29 163.48 163.19

02
639120.00 0.24 162.94 163.18

639140.00 0.26 162.91 163.17

0.27 162.90 163.17

639160.00 0.25 162.91 163.16

03
+639+273

639180.00 0.24 162.91 163.15 BRIDGE


POD
km pr.639+185
km ex. 639+223
+639+190

FIR

FIR
I
II
639+200
639200.00 0.24 162.90 163.14

161.27

04
639220.00 -1.65 164.78 163.13

639240.00 0.19 162.93 163.12

-0.34 163.46 163.12

639260.00 -0.51 163.62 163.11

05
639280.00 -1.14 164.24 163.10

639+300
639300.00 -0.76 163.85 163.09

06
639320.00 -0.75 163.83 163.08

639340.00 -0.43 163.50 163.07

1
3
5
-1.02

7
164.09 163.07

9
Nivel teren existent
Existing Terrain Level

11
639360.00 -1.58 164.64 163.06

07

4
5
7
8

II
6

III

STATIA
TILEAGD
639380.00 -1.66 164.71 163.05

14
12

6
8
639+400
639400.00 -0.92 163.96 163.04

4
2
639420.00 -1.62 164.65 163.03

08
639440.00 -0.98 164.00 163.02

-0.76 163.78 163.02

639460.00 -1.02 164.03 163.01


09
P=-0.50‰

NSS proiectat

639480.00 -0.10 163.10 163.00


D=-0.475 L=950.000

Designed Top of Rail

639+500

639500.00 -1.14 164.13 162.99

639520.00 -0.98 163.96 162.98


10

639540.00 -0.06 163.03 162.97

0.40 162.57 162.97

639560.00 0.51 162.45 162.96


11

639580.00 0.15 162.80 162.95


FIR

FIR
I
II
639+600

639600.00 0.50 162.44 162.94


NSS proiectat

639620.00 0.05 162.88 162.93


Designed Top of Rail

12

639640.00 0.46 162.46 162.92

-0.11 163.03 162.92

639660.00 0.42 162.49 162.91


13

639680.00 0.55 162.35 162.90


639+700

639700.00 1.15 161.74 162.89

639720.00 -0.01 162.89 162.88 LEVEL CROSSING/TRECERE LA NIVEL


km 639+711
km ex. 639+747
14

639740.00 0.25 162.62 162.87

0.08 162.79 162.87

639760.00 -0.03 162.89 162.86

639780.00 162.85 162.85


15

3
5
639+800

639800.00 0.55 162.29 162.84


7

9
11

639820.00 0.47 162.36 162.83


4

II
III

STATIA
18
16

OSORHEI
16

14

639840.00 -1.24 164.06 162.82


12
10

-1.28 164.10 162.82


6

639860.00 -1.41 164.22 162.81

639880.00 -1.60 164.40 162.80


17
639+900

639900.00 -1.36 164.15 162.79


1

EL= 162.787
KM= 639+914.192
639920.00 -0.94 163.72 162.78
EL

TV
BV
RV

DG
KM

LVC

18

639940.00 -1.29 164.03 162.74


3
RV22

FIR

FIR
5

-1.59 164.30 162.71


I
II
-5.30‰
53.000
-0.035
26.500
10000.000
162.774
639940.692

639960.00 -0.24 162.90 162.66


EL= 162.620
37

KM= 639+967.191
41

39

8
9
10
11

639980.00 0.72 161.83 162.55


45

4
5

7
6
III
II
1
19

STATIA
640+000
Nivel teren existent

-0.80
Existing Terrain Level

640000.00 163.23 162.43


ORADEA EST
55

640020.00 -0.95 163.26 162.31


12

10
8
6
4

640040.00 -0.87 163.07 162.20


20

-1.01 163.15 162.14

640060.00 -0.83 162.91 162.08

640080.00 -0.02 161.99 161.97


21
NSS proiectat

5
FIR

FIR
640+100

-0.01
7
Designed Top of Rail

640100.00 161.86 161.85


I
II

9
11
13

27
19
17

0.13
31

640120.00 161.60 161.73


21

33
35
Railway Concrete ditch / Șanț de beton C.F.

1B
2B
7A
6A
VA
43
IIIA

IVA

-0.86
2A

640140.00 162.48 161.62


64

STATIA
ORADEA
50
22

1A

-1.86
81

163.42 161.56
42
76

-0.92
72

640160.00 162.42 161.50


14
48
6024

12
10
8

640180.00 0.34 161.05 161.39


6
4

2
23
640+200

640200.00 0.49 160.78 161.27


FIR

FIR
I
II

640220.00 -0.16 161.31 161.15

640240.00 -1.17 162.21 161.04


24

-0.20 161.18 160.98

640260.00 0.23 160.69 160.92

640280.00 0.86 159.95 160.81


25
NSS proiectat

640+300

640300.00 -0.55 161.24 160.69


1
Designed Top of Rail

3
7

5
9
11

640320.00 -0.06 160.63 160.57


13
15

19
17 21

49
27

640340.00 -1.37 161.83 160.46


29
6
8
5

III
IV

1
26

-1.45 161.85 160.40


9
14

10
12
13

7
11

STATIA
30

640360.00 -0.42 160.76 160.34


EPISCOPIA BIHOR
40

24
P=-5.80‰
D=-4.872 L=840.000

32

14

-1.25
20/22

640380.00 161.48 160.23


4
2
27
640+400

640400.00 -1.08 161.19 160.11

640420.00 -0.80 160.79 159.99

640440.00 -1.11 160.99 159.88

-1.09 160.91 159.82


28

640460.00 -1.37 161.13 159.76


FIR

640480.00 -1.27 160.92 159.65


I
640+500

640500.00 -0.64 160.17 159.53


29

640520.00 -2.18 161.59 159.41

640540.00 -0.09 159.39 159.30

-1.68 160.92 159.24


Spre Ungaria
Nivel teren existent
Existing Terrain Level

30

640560.00 -1.96 161.14 159.18

640580.00 0.30 158.77 159.07


640+600

640600.00 -1.94 160.89 158.95

640620.00 -0.87 159.70 158.83

640640.00 -2.09 160.81 158.72


BENEFICIAR

-0.76 159.42 158.66

640660.00 -0.56 159.16 158.60


COMPANIA NAȚIONALĂ DE CĂI FERATE

640680.00 -0.37 158.86 158.49


NSS proiectat
Designed Top of Rail

640+700

640700.00 -0.22 158.59 158.37


ANTREPRENOR SI PROIECTANT GENERAL

640720.00 -0.66 158.91 158.25

640740.00 -0.93 159.07 158.14

-0.52 158.60 158.08

EL= 158.035
PROIECTANT DE SPECIALITATE

640760.00 -0.49 158.51 158.02 KM= 640+757.693


EL

TV
BV
RV

DG
KM

LVC

Verificat
Proiectat
SPECIFICATIE

640780.00 -1.45 159.38 157.93


Codificare plansa
RV23

Manager de proiect
4.60‰
46.000
0.026
23.000
-10000.000
157.902
640780.692

640+800

640800.00 -1.67 159.55 157.88


EL= 157.874
KM= 640+803.692
NUME

ing. Bãzãrînca Cristina


ing. Giorgio Carrapetta
CONTRACT: 173/07.12.2022

ing. Domenico Ceraudo

640820.00 -1.24 159.09 157.85


CTA4-CO-DWG-PAC-00-LUCF-PFL-013-WB01

640840.00 -0.99 158.82 157.83

-1.23 159.05 157.82


SCARA:

1:1000/100

640860.00 -1.41 159.22 157.81


DATA: Mai 2023
SEMNATURA DENUMIRE PROIECT:

640880.00 -0.66 158.44 157.78


FAZA: P.A.C.

DENUMIRE DESEN:
640+900

640900.00 0.14 157.62 157.76


PLAN 13 / 30
PROFIL LONGITUDINAL

640920.00 -0.81 158.54 157.73


PROIECTARE ȘI EXECUȚIE A LUCRĂRILOR AFERENTE OBIECTIVULUI DE
INVESTIȚII ”ELECTRIFICAREA ȘI REABILITAREA LINIEI DE CALE FERATǍ CLUJ
NAPOCA - ORADEA - EPISCOPIA BIHOR”, LOT 4 ALEȘD - FRONTIERĂ UNGARIA

640940.00 -0.36 158.07 157.71


WB01
REVIZIA

-0.18 157.88 157.70


DATA

640960.00 0.07 157.62 157.69


Mai 2023

640980.00 -0.43 158.09 157.66


Prima editie
COMENTARII
641+000

641000.00 -0.45 158.09 157.64

You might also like