You are on page 1of 2

Title: Pre/Post Flited Part Inspection

Form #: J-400-2 Revision: 7


Powder Heat #: ___________
23-04-
Date: Page: 1 of 1
2023

E.C.#: _____________________________

Pre-inspection Checklist

Read entire Job Traveler, read any notes for all departments. Verify the serial number matches the
Job Traveler.

Stamp, etch, or label part with E.C. Number. Label any parts that need to be removed, such as tip
assemblies, pins, etc. Make notes on the Job Traveler for the items to be reinstalled or shipped
back with part. Did the part come with extra items? ____________If yes, what condition are they
in?________________________________

All screws must have a hardness test. (Max for OD is 55, Max for root is 50)
HRC: _________Root.
HRC: _________ Flites.

Check entire part for damage, pits, pin holes etc., including spline, keyway, shank, bearing, flites,
flite sides, root, register, face and inner threads.

Does the part have centers? __________ Does the part need centers? _________

Measure part and compare to given specs. Highlight any highs/lows. Anything more than .002"
high/low, must have notes on the note page for the appropriate departments.

Double check coating length and if applicable, mixer, undercut, barrier flites, barrier flite
clearance, etc.

Sharp edges in coated areas need to be chamfered. We DO NOT chamfer OD only screw and any
screw 28mm or under is a judgement call to be made by Supervisor.

Mask part. Be sure to have at least 6" of masking to protect shanks of screws and be sure any
mask lines are as straight as possible. Write EC number on masking.

Spray rust inhibitor on uncoated areas of partial encapsulated parts.

Any screws 100mm or larger with hardfacing cracks, must be sent for leeching.

Any screw 25mm or smaller must be checked for straightness and straightened if necessary.

Double check that all of these steps have been completed and all appropriate notes have been
made for all applicable departments. Verify any deviation forms have the proper information.

Initials & Date: _________________________________


Title: Pre/Post Flited Part Inspection
Form #: J-400-2 Revision: 7
Powder Heat #: ___________
23-04-
Date: Page: 1 of 1
2023

You might also like