Concrete & Reinforcment Work
Concrete & Reinforcment Work
TRA-UM-RA-023
RISK ASSESSMENT Revision 0
OF CONCRETE & Date 03/03 /2022
REINFORCEMENT WORK Project
Construction of Farm
House (440&443)
Probability
Probability
Severity
Severity
PxS
PxS
S.I Activity Hazards / Possible Risks Control Measures Risk Owner
01 Concrete & Falls from Height - Back 4 5 20 Approved method statement 1 5 5 Project Manager/
Reinforcement Work Injury, Fractures, Cuts, must be in place prior to start Construction
Bruises, Fatal. the work activity. Manager/ Sr. Project
Ensure Job safety analysis Engineer
(JSA) is completed.
Obtain work permit system if Project Engineer,
applicable to work. Foremen
Provide Full body harness
and ensure it is safe to use.
Provide individual Life line
while working nearby edges,
All openings are to be hard
barricade and covered
properly.
Ensure life line is in good
condition and it is capable to
use.
Provide hand railing (top, mid
& toe board) on working
platforms.
Use suitable ladders for
access and egress.
Provide adequate access
and egress to work.
Scaffolding platforms to be
erected by competent
persons & display green tag.
Page 1 of 10
Ref. No. TRA-UM-RA-023
RISK ASSESSMENT Revision 0
OF CONCRETE & Date 03/03 /2022
REINFORCEMENT WORK Project
Construction of Farm
House (440&443)
Page 2 of 10
Ref. No. TRA-UM-RA-023
RISK ASSESSMENT Revision 0
OF CONCRETE & Date 03/03 /2022
REINFORCEMENT WORK Project
Construction of Farm
House (440&443)
Page 3 of 10
Ref. No. TRA-UM-RA-023
RISK ASSESSMENT Revision 0
OF CONCRETE & Date 03/03 /2022
REINFORCEMENT WORK Project
Construction of Farm
House (440&443)
person.
Ensure erected scaffolding
platform is safe to use and
provide adequate access and
egress to job.
Ensure never overload
scaffolding platform or form
work with excess materials.
Ensure all reinforcement work
should be done as per
approved drawing and ensure
adequate access on
reinforcement.
Don’t allow the work until
proper approval of method
statements.
Maintain good housekeeping
in the working area.
Reinforcement should be
properly locked and tie up
binding wire.
Provide additional supports in
case of high wind speed.
Page 4 of 10
Ref. No. TRA-UM-RA-023
RISK ASSESSMENT Revision 0
OF CONCRETE & Date 03/03 /2022
REINFORCEMENT WORK Project
Construction of Farm
House (440&443)
Page 5 of 10
Ref. No. TRA-UM-RA-023
RISK ASSESSMENT Revision 0
OF CONCRETE & Date 03/03 /2022
REINFORCEMENT WORK Project
Construction of Farm
House (440&443)
General Precautions:
Page 6 of 10
Ref. No. TRA-UM-RA-023
RISK ASSESSMENT Revision 0
OF CONCRETE & Date 03/03 /2022
REINFORCEMENT WORK Project
Construction of Farm
House (440&443)
Page 7 of 10
Ref. No. TRA-UM-RA-023
RISK ASSESSMENT Revision 0
OF CONCRETE & Date 03/03 /2022
REINFORCEMENT WORK Project
Construction of Farm
House (440&443)
Persons in danger
Page 8 of 10
Ref. No. TRA-UM-RA-023
RISK ASSESSMENT Revision 0
OF CONCRETE & Date 03/03 /2022
REINFORCEMENT WORK Project
Construction of Farm
House (440&443)
RISK MATRIX
Risk Rating (RR) – Severity x Likelihood
LIKELIHOOD
Remote possibility Could happen but rare Could happen Could happen often Could happen
(once every 3 years (typically once in a occasionally (on (on average once a frequently (once a
S L or more) year) average quarterly) month or more) week or more)
SEVERITY 1 2 3 4 5
(IMPACT)
Page 9 of 10
Ref. No. TRA-UM-RA-023
RISK ASSESSMENT Revision 0
OF CONCRETE & Date 03/03 /2022
REINFORCEMENT WORK Project
Construction of Farm
House (440&443)
1-4 Quick, easy controls should be implemented immediately and further action planned for when resources permit. Monitoring required
ensuring controls are maintained. Manage through routine procedures. Go for economic improvements where possible. Incident
Low report must be completed.
Aim to reduce risks but costs of prevention may be limited. Undertake a risk assessment of the situation / task and implement the
appropriate actions. Actions should have a timescale and should be monitored. Where the risk involves work in progress undertake
5-12
a risk assessment as soon as possible to ensure the safety of the situation or task. Work should not start until the risk is
reduced to an acceptable level. Considerable resources may have to be allocated. Contact your Manager and Risk Manager by
Medium
telephone about the actions that should be taken to reduce the risk/s. incident report must be completed. Incident must be added
to service risk register.
Do not commence the activity until a risk assessment has been completed to ensure the safety of the situation or task. If it is
15-25
not possible to reduce or eliminate the risk even with unlimited resources, work must remain prohibited. Inform your relevant
Director, your Manager and the Risk Manager immediately by telephone. Incident report must be completed. Incident must be
High
added to service risk register.
Prepared By: Saeed Ahmed Checked By: Engr Samir / Project Manager
Signature: Signature:
Page 10 of 10