You are on page 1of 1

Ethio-Engineering group

Research and development

Manufacturing Process description sheet ISSUE NO. Page 1 of 1

Part no. Order Date---------------- Work Dispatched Date-------------------


 Specify your factory in the above box
Customer Name:
Job O. Title of parts:
Ord. Qty Part no: Pro.No. Cost Sheet No:
No.
01 DPTI-004-07 DPTI-004 Ethio-Engineering group
Furrow wheel plate
Material Code Material type Blank size Accessory Starting date: Delivery date:
Mild steel 160 x 70 x 10 mm
Planned time
Actu perfo
Depth No of Tools Measuring Inspected
S/N OPRN Operation description Feed RPM Set up al rmed
of Cut path Mach. Total used tools by
Time time by
Time Time

01 M  Mill to 158.1 x 69.6 x 10 mm


 Mill surfaces with the given shape and R 30
Drill bit
10 min 40 min 30 & caliper
77.2 in bottom as shown in attached min min carbide
drawing. cutter
 Drill 4 x Ф 13 in the given dimension
NOTE: -CHECK ONE PIECE FIRST BEFORE MAKING ALL QUANTITY

Prepared by: BIRUK AND AMANUEL Approved by: ASHENAFI Issuing dept.: R & D(EEG) Receiving company:

Sign: ––––––––––––– Sign–––––––––––––––– sign: …………………. Name……………

Date: ----------------- Date: -------------------------- Date: …………………………. Date: ………………

You might also like