Simthali Type 4 HP Final Estimate - With Lead 1
Simthali Type 4 HP Final Estimate - With Lead 1
Summary of Cost
FY:2077/078
Project Duration= 15 months
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok
Set 1 14982.20
2 Supply, Insatallation and fixing in position 10 ltr PVC dual
flushing cistern , 15 mm PVC connector with both ends
couplings, 32 mm long pvc pipe all complete with testing
and ready for operation, Ground Floor
Set 1 7194.40
3 Supply, Insatallation and fixing in position of White glazed
porcylain clay P or S trap water closet single piece with
slow faliing cover , 1 no. 15 mm PVC connector with both
ends couplings all complete with testing and ready for
operation, disable and upper floor
Set 3 39632.45
4 Supply, Insatallation and fixing in position of 550x400 mm
White glazed porcylain clay wall mounted wash basin with
pedestrail and one 15 mm pillar cock ,32 mm bottle trap
with plug chain and stay , one 15 mm PVC connector with
both ends couplings with testing and ready for operation
Set 5 12415.40
5 Supply, Insatallation and fixing in position of 550x400 mm
White glazed porcylain clay oval type under counter wash
basin with pedestrail and one 15 mm pillar cock ,32 mm
bottle trap with plug chain and stay , one 15 mm PVC
connector with both ends couplings with testing and ready
for operation
Set 5 11274.60
6 Supply, Insatallation and fixing in position White glazed
porcylain clay wall hung Wash Basin with pedestrail , one
no.15 mm pillar cock, grab s 2 nos., 32 mm bottle trap with
plug , chain and stay all complete , one 15 mm PVC
connecting pipe testing and ready for operation for disable
as per instruction
Set 1 16738.25
Set 1 7816.55
8 Supplying Insatallation and Fixing (Stainless steel scrub
sink 1.5mt length,deep 500mm+150mm splash ) The spalsh
made of 304 qwality prime grade of Stainless steel 16 swg
thickness,Floor mounted with leg(stand),kantipur kitchen
equipment, Qwality kitchen or equivalent.Sample to be
approved by project engineer.
Set 1 111801.85
9 Supply, Insatallation and fixing in position stainless steel
Wall Mixture all complete and ready for operation
Set 2 4934.53
10 Supply, Insatallation and fixing in position 15 mm CP
shower head with arm and flange all complete and ready for
operation
Set 2 1633.80
11 Supply, Insatallation and fixing in position 15 mm CP
Commode Spray with testing and ready for operation
Set 3 1763.81
12 Supply, Insatallation and fixing in position of CP Toilet
paper holder No. 3 1340.78
13 Supply, Insatallation and fixing in position of 15 mm CP
Bib Cock No. 3 1690.38
14 Supply, Insatallation and fixing in position 15 mm CP
Angle Valve No. 22 1555.83
15 Supply, Insatallation and fixing in position of CP soap
dish No. 10 1188.98
16 Supply, Insatallation and fixing in position of 600mm long
CP glass shelf No. 2 2895.47
17 Supply, Insatallation and fixing in position of 20x600 mm
Single Towel rail heavy No. 10 948.52
18 Supply, Insatallation and fixing in position of Looking
mirror Modi Guard 600x450 mm No. 10 2099.55
19 Supply, Insatallation and fixing in position of PVC Multi-
floor trap with cover 110mmx75 mm No. 8 542.11
20 Supply, Insatallation and fixing in position of Round PVC
110 mm P-Trap No. 4 927.24
Rm 12 735.51
22 - 32 mm dia. Rm 42 542.31
23 - 25 mm dia. Rm 32 482.51
24 - 20 mm dia. Rm 56 371.45
26 Supply and Installation of CPVC Ball Valves CTS
sockets as per drawing and instruction - 40 mm dia.
No. 2 1998.87
27 - 32 mm dia. No. 3 1686.07
28 - 25 mm dia. No. 4 785.62
29 - 20 mm dia. No. 7 668.32
31 Supply and Installation of pipe Insulation for hot water
( Aeroflex , Superloan or equivalent) 6 mm thick - 25 mm
dia.
Rm 18 254.32
32 - 20 mm dia. Rm 12 207.17
33 Supply and Installation of 2000 litres PVC Roof Tanks NS
brand extra heavy all complete testing and ready for
operation Hilltake or equivalent
No. 2 41325.25
34 Supply and installation of 1.1 H.P. Electrical motor water
pump multi stage, coupled pump (Crompton) with check
valve all complete with ready for operation
Set 1 24799.75
35 Supply and installation of Pressure sensor switch for pump
auto switch off all complete set. Set 1 4599.08
36 Supply and installation solar water heater with 3.0 KW
elecric booster with thermostat all complete set technical
specification (inside boiler MS sheet 4 mm thick with
expantion joint overlap joint ) in cover and bottom with
25x25x3mm angle welded 4 kg per meter , 300 lit 24 tubes
solar heater fixing with electric booster all complete
Set 1 73071.00
37 Supply and Installation of drinking water fountain set with
all necessary accessories filtration rate 1 lit/min. Euro
Guard or Kent India (ISI)
Set 1 30500.00
38 Supply and installation 5 kg ABC type fire extinguisher
with pressure guage type all complete set.
Set 6 9194.25
Rm 74 1114.29
42 - 75 mm ED 6 kg/cm2 Rm 42 575.92
43 - 50 mm ED 6 kg/cm2 Rm 32 303.77
44 Supply and Installation of 160 mm HDEP 4 Kg/cm2
including excavation and backfilling all complete for
external SWR pipe
Rm 46 1417.72
45 Supply and Installation of 110 mm HDEP 4 Kg/cm2 for
external SWR pipe Rm 42 733.76
1
ELECTIRCAL WORKS LUMINAIRES
( FIXTURES) Accessories:screws, gripes, pvc tape,
choke, starter, Tube, bulbs, holder, flexible wire etc Set 20.00 1483.5
all complete. Ceiling ligh/Dome light 8" heavy
carrier with CFL etc all complete.
27
2 Project Information Sign Board: Making fitting and job 1.0 10000.00
fixing Sign Board (1.5mx1.2m) with Project
Information as per instruction in all complete.
2 d]lzgsf] k|of]u u/L hu leQf kvf{ndf l;d]G6 s+lqm6 ug]{ sfd dfn;fdfg pknAw u
#) dL6/;Dd 9'jfgL ;lxt
-lk=;L=;L= !M#M^_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
3 d]lzgsf] k|of]u u/L ;'k/ :6«Sr/df l;d]G6 s+lqm6 ug]{ sfd dfn;fdfg pknAw ug]
#) dL6/;Dd 9'jfgL ;lxt
-lk=;L=;L= !M!=%M#_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
4 d]lzgsf] k|of]u u/L hu leQf kvf{ndf l;d]G6 s+lqm6 ug]{ sfd dfn;fdfg pknAw u
#) dL6/;Dd 9'jfgL ;lxt
-lk=;L=;L= !M@M$_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
13 !@=% dL=dL= afSnf] l;d]G6 afn'jf Knfi6/ -!M#_ efudf l;lnËdf ug]{ .
b/ ljZn]if0fsf] nflu !)) j=dL= lnOPsf]
15 leQf Pjd\ l;lnËdf @ ld=ld= Kn]g XjfO{6 k'§L Knfi6/ ug]{ sfo{ .
b/ ljZn]if0fsf] nflu !) j=dL= lnOPsf]
725.00 1220.00
6300.00
1775.00
2445.56
431.85 10952.40
12172.40
Ü 7]s]bf/ cf]e/x]8 1825.86
13998.26
3498.00
1917.50
708.00
1105.00
35.00
270.00
11.20 7544.70
2896.9608
511.56
1125.00
30.00 4563.52
15140.72
Ü 7]s]bf/ cf]e/x]8 2271.10
17411.82
6360.00
1681.50
855.50
1105.00
70.00
270.00
11.20 10353.20
3059.2905
540.225
1125.00
30.00 4754.52
18140.22
Ü 7]s]bf/ cf]e/x]8 2721.03
20861.25
5088.00
1534.00
973.50
1157.00
45.50
270.00
11.20 9079.20
2984.3691
526.995
1125.00
30.00 4666.36
16778.06
Ü 7]s]bf/ cf]e/x]8 2516.70
19294.76
f6\g], df]8\g]
FWg] sfd
xt
OPsf]
k|To]s ;|
/sd f]t ;fwgsf]
hDdf
11880.00
8700.00 20580.00
84000.00
900.00
1323.6114
233.73 86457.34
107037.34
Ü 7]s]bf/ cf]e/x]8 16055.60
123092.94
pknAw ug]{,
f/f] nufpg]
;lxt
OPsf]
k|To]s ;|
/sd f]t ;fwgsf]
hDdf
1485.00
1595.00
145.00 3225.00
8400.00
1113.00
750.00
35.00
1973.429676
348.4782 12619.91
4.35
15849.26
Ü 7]s]bf/ cf]e/x]8 2377.38
18226.64
{6f pknAw ug]{,
f/f] nufpg]
;lxt
OPsf]
k|To]s ;|
/sd f]t ;fwgsf]
hDdf
1485.00
1595.00
507.50 3587.50
8400.00
1113.00
750.00
35.00
1973.429676
348.48 12619.91
15.22
16222.63
Ü 7]s]bf/ cf]e/x]8 2433.39
18656.02
\g] sfd .
OPsf]
k|To]s ;|
/sd f]t ;fwgsf]
hDdf
33660.00
2465.00 36125.00
205700.00
1708.44
368.00
1098.68
194.04 208875.12
245000.12
Ü 7]s]bf/ cf]e/x]8 36750.01
281750.13
15708.00
180.00
68.00
108.00
1755.00
66.00
45.00
83.89
14.81 18028.70
28653.70
Ü 7]s]bf/ cf]e/x]8 4298.05
32951.75
k|m]d agfO{
h8fg ug]{ .
@# j=ld= lnOPsf]
k|To]s ;|
/sd f]t ;fwgsf]
hDdf
8910.00
652.50 9562.50
9163.00
705.25
136.00
168.00
66.00
35.00
48.79
8.64 10330.68
19893.18
Ü 7]s]bf/ cf]e/x]8 2983.97
22877.15
13775.00 27635.00
12879.00
5500.00
5406.71
954.76 24740.47
52375.47
Ü 7]s]bf/ cf]e/x]8 7856.32
60231.79
fn'jf -!M$_ df
ug]{ .
OPsf]
k|To]s ;|
/sd f]t ;fwgsf]
hDdf
11880.00
11600.00 23480.00
8554.20
3650.00
3588.57
633.71 16426.48
39906.48
Ü 7]s]bf/ cf]e/x]8 5985.97
45892.45
14500.00 29350.00
9937.50
3200.00
3337.54
589.39 17064.43
46414.43
Ü 7]s]bf/ cf]e/x]8 6962.16
53376.59
7.25 32.00
111.30
10.00
0.03
16.69
2.95 140.97
172.97
Ü 7]s]bf/ cf]e/x]8 25.94
198.91
725.00 1715.00
734.16
13.27
2.34 749.77
2464.77
Ü 7]s]bf/ cf]e/x]8 369.71
2834.48
1450.00 2687.50
2067.00
450.00
1062.00
521.95
92.16 4193.11
6880.61
Ü 7]s]bf/ cf]e/x]8 1032.09
7912.696
8700.00 19095.00
5024.40
550.00
833.96
147.29 6555.65
25650.65
Ü 7]s]bf/ cf]e/x]8 3847.59
29498.24
1685.40
1175.00
1800.00
180.00
24.50 4864.90
9974.90
Ü 7]s]bf/ cf]e/x]8 1496.23
11471.13
Abs. Page 30 of 118
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Summary of Amount
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure) FY:2077/078
Location :- Simthali, Kavrepalanchok
I. CIVIL WORKS
S.No. Description Unit Quantity Rate Amount Remarks
Concrete Works
Brickwork
Plastering work
Painting work
Various works
Sanitaryware:Hindware
/Paryware/Jaquar/Cera/Classica
CP Fixtures: Hindware/Jaquar/ Paryware
CPVC Pipe: Astral/Supreme/Marvel Flowguard
1
Ceiling ligh/Dome light 8" silver cast milky base
Set 20.00 402.21 8044.20 157
decorative heavy carrier with CFL etc all complete.
2 20 pair telephone cable for telephone point in 20mm 100.00 187.08 18708.00 227
HDPE polythene pipe. Point
F
COMPUTER (Net) SYSTEM;
Accessories.jack, Screws, gripes etc all complete.
2 UTP Cat 6 networking computer cable in 20mm 100.00 74.81 7481.00 227
HDPE polythene pipe etc all complete. Point
G SOLAR HYBRID SYSTEM
Suppling and fixing of solar PV 100w/ 12V
1 solar panel for supply and all necesory etc all pcs 4.00 14702.00 58808.00 ktm rate
complet
Suppling 200 AH/12V Tubular exide battry etc
2 set 4.00 35140.55 140562.20 ktm rate
all complet
3 Charge controllor 50 A etc all complet set 1.00 31518.00 31518.00 ktm rate
2*3/20 PVC multi strand flexible cu wire for for light, elec. Rate sheet
1 Point 120.00 1211.35 145362.30
1
fan, etc. all complete
2x7/22+1x3/22 sq.mm multi strand flexible cu wire
elec. Rate sheet
2 for power point in 3/4" HDPE polythene pipe etc all Point 45.00 1540.25 69311.36
1
complete.
2 Project Information Sign Board: Making fitting and job 1.00 10000.00 10000.00
fixing Sign Board (1.5mx1.2m) with Project
Information as per instruction in all complete.
GRAND-TOTAL(A+B+C+D) 21,460,170.03
Concrete Works -
Brickwork -
Metal Works -
Plastering work -
Flooring Work -
Supplying and laying of 500 guage polyethene sheet on
26 122.880 - - - - - - - 122.88 Sqm
floor above earth filling
Painting work -
Various works -
S.No. Description Main Buildng Toilet Block Land Development Septic tank Soak pit Manhole Placenta pit Underground water tank
Brickwork - - - - - - - -
Metal Works - - - - - - - -
Plastering work - - - - - - - -
Painting work - - - - - - - -
Various works - - - - - - - -
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Detailed Estimate
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure) FY:2077/078
Location :- Simthali, Kavrepalanchok
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
A Civil Work
Foundation Pad
F1 2 2.400 4.800 2.400 1.650 19.000
F2 1 2.200 2.200 2.200 1.650 7.980
F3 3 2.000 6.000 2.000 1.650 19.800
F4 5 1.800 9.000 1.800 1.650 26.730
F5 4 1.500 6.000 1.500 1.650 14.850
toe wall
Foundation Pad
F1 2 2.400 4.800 2.400 11.520
F2 1 2.200 2.200 2.200 4.840
F3 3 2.000 6.000 2.000 12.000
F4 5 1.800 9.000 1.800 16.200
F5 4 1.500 6.000 1.500 9.000
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
toe wall
Foundation Pad
F1 2 2.400 4.800 2.400 0.075 0.860
F2 1 2.200 2.200 2.200 0.075 0.360
F3 3 2.000 6.000 2.000 0.075 0.900
F4 5 1.800 9.000 1.800 0.075 1.210
F5 4 1.500 6.000 1.500 0.075 0.670
toe wall
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
1 1.800 1.800
T.L. 90.870 0.230 0.300 6.270
Ceiling beam GF
Grid 1-1,2-2,3-3 L=(2.75+3.6+2.7+3.35) 3 11.000 33.000
Grid A-A,B-B,C-C,D-D,E-E,L=(4.4+4.4) 5 8.100 40.500
Beam At Extension in Slab 4 1.575 6.300
T.L. 79.800 0.300 0.275 6.580
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
Facia slab 1 47.600 0.125 0.400 2.380
1 47.600 0.750 0.125 4.460
Sill-Ground Floor
Grid 1-1,2-2,3-3 L=(2.75+3.6+2.7+3.35) 3 12.400 0.230 0.075 0.640
Grid A-A,B-B,C-C,D-D,E-E,L=(4.4+4.4) 5 8.800 0.230 0.075 0.750
Partation Wall Between Toilet and Store 1 2.750 0.230 0.075 0.040
Partation Wall at Registration room 1 3.600 0.115 0.075 0.030
Partation Wall at Store and Scrub Sink 1 2.700 0.230 0.075 0.040
Partation Wall Between Toilet, Ante/Post-
1 6.520 0.230 0.075 0.110
Natal beds andSluice
Deduction:
Door(D1) -1 1.200 0.230 0.075 -0.021
Door(D2) -3 1.000 0.230 0.075 -0.052
Door(D3) -4 0.750 0.230 0.075 -0.052
Door(Dw) -1 0.900 0.230 0.075 -0.016
Opening -2 1.275 0.230 0.075 -0.044
Sill-First Floor
Grid 1-1 1 2.350 0.230 0.075 0.040
Grid 2-2 &3-3 2 12.400 0.230 0.075 0.420
Grid A-A & B-B 2 8.000 0.230 0.075 0.270
Grid C-C & D-D 2 1.265 0.115 0.075 0.020
Grid E-E 1 4.000 0.230 0.075 0.060
Partition Wall At Toilet & Battery house 1 8.795 0.115 0.075 0.070
Deduction:
Door(D3) -2 0.750 0.115 0.075 -0.012
Door(D2) -4 1.000 0.230 0.075 -0.069
Door(Dw) -1 0.900 0.230 0.075 -0.015
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
Foundation
F1 2 9.600 0.225 4.320
F2 1 8.800 0.200 1.760
F3 3 8.000 0.200 4.800
F4 5 7.200 0.200 7.200
F5 4 6.000 0.175 4.200
Column-upto plinth 15 1.400 1.500 31.500
Column-Ground Floor 15 1.400 3.150 66.150
Column-First Floor 12 1.400 3.150 52.920
-First floor(parapet) 3 1.400 1.000 4.200
Foundation Beam
Grid 1-1,2-2,3-3 L=(2.75+3.6+2.7+3.35) 3 11.000 33.000
Grid A-A,B-B,C-C,D-D,E-E,L=(4.4+4.4) 5 8.100 40.500
Ramp 1 5.400 5.400
T.L. 78.900 0.500 39.450
Plinth Beam
Grid 1-1,2-2,3-3 L=(2.75+3.6+2.7+3.35) 3 11.000 33.000
Grid A-A,B-B,C-C,D-D,E-E,L=(4.4+4.4) 5 8.100 40.500
Partation Wall Between Toilet and Store 1 2.750 2.750
Partation Wall at Registration room 1 3.600 3.600
Partation Wall at Store and Scrub Sink 1 2.700 2.700
Partation Wall Between Toilet, Ante/Post-
1 6.520 6.520
Natal beds andSluice
Ramp 1 5.400 5.400
T.L. 94.470 0.600 56.680
Ceiling beam GF
Grid 1-1,2-2,3-3 L=(2.75+3.6+2.7+3.35) 3 11.000 33.000
Grid A-A,B-B,C-C,D-D,E-E,L=(4.4+4.4) 5 8.100 40.500
Beam At Extension in Slab 4 1.575 6.300
T.L. 79.800 0.700 55.860
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
Landing 2 2.520 1.310 6.600
Steps 34 1.200 0.250 10.200
Ceiling beam FF
Grid 1-1with extension 1 4.720 4.720
Grid 2-2 & 3-3 with extension 2 14.447 28.894
Grid A-A& B-B with extension 2 10.770 21.540
Grid C-C, D-D & E-E with extension 3 6.370 19.110
T.L. 74.264 0.700 51.980
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
Above Plinth
Grid 1-1,2-2,3-3 L=(2.75+3.6+2.7+3.35) 3 11.000 0.230 2.650 20.113
Grid A-A,B-B,C-C,D-D,E-E,L=(4.4+4.4) 5 8.100 0.230 2.650 24.684
Partation Wall Between Toilet and Store 1 2.750 0.230 2.875 1.818
Partation Wall at Registration room 1 3.600 0.230 2.875 2.380
Partation Wall at Store and Scrub Sink 1 2.700 0.230 2.875 1.785
Partation Wall Between Toilet, Ante/Post-
1 6.520 0.230 2.875 4.311
Natal beds andSluice
Deduction:
Window(W1) -3 1.500 0.230 1.600 -1.656
Window(W2) -1 1.200 0.230 0.600 -0.165
Window(W3) -3 0.900 0.230 1.600 -0.993
Window(W4) -3 0.600 0.230 1.600 -0.662
Window(DW) -1 0.900 0.230 1.600 -0.331
Ventilaton(V1) -1 1.800 0.230 0.600 -0.248
Ventilaton(V2) -2 1.500 0.230 0.600 -0.414
Door(D1) -1 1.300 0.230 2.600 -0.777
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
Door (D2) -4 1.000 0.230 2.600 -2.392
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
Door (D3) -4 0.900 0.230 2.600 -2.152
Door (D4) -1 0.750 0.230 2.600 -0.448
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
main door ventilation 2 0.550 1.100 0.325 0.390
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
side door ventilation 1 0.875 0.875 0.325 0.240
Total 0.630
Ground floor
Window(W1) 3 1.500 1.600 7.200
Window(W2) 1 1.200 1.600 1.920
Window(W3) 3 0.900 1.600 4.320
Window(W4) 3 0.600 1.600 2.880
Window(DW) 1 0.900 1.600 1.440
Ventilaton(V1) 2 1.500 0.600 1.800
First Floor
Window(W1) 3 1.500 1.600 7.200
Window(W2) 3 1.200 0.600 2.160
Window(W4) 2 0.600 1.600 1.920
Window(DW) 1 0.900 1.600 1.440
Total 32.280 sqm
11.00 Metal work
Ground floor
Window(W1) 3 1.500 1.600 7.200
Window(W2) 1 1.200 1.600 1.920
Window(W3) 3 0.900 1.600 4.320
Window(W4) 3 0.600 1.600 2.880
Window(DW) 1 0.900 1.600 1.440
Ventilaton(V1) 2 1.500 0.600 1.800
First Floor
Window(W1) 3 1.500 1.600 7.200
Window(W2) 2 1.200 0.600 1.440
Window(W4) 2 0.600 1.600 1.920
Window(DW) 1 0.900 1.600 1.440
31.560
21.5 Kg/sqm Total 678.540 Kg
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
A. Outer surface
Ground Floor
Grid 1-1 & 3-3 2 12.800 25.600
Grid A-A& E-E 2 9.200 18.400
T.L. 44.000 3.750 165.000
First Floor
Grid 1-1, 2-2 & 3-3 2 12.800 25.600
Grid A-A 1 4.800 4.800
Grid D-D 1 4.485 4.485
Grid E-E 1 9.200 9.200
T.L. 44.085 3.025 133.357
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
Window(DW) -1 0.900 0.600 -0.540
Ventilaton(V1) -1 1.800 0.600 -1.080
Ventilaton(V2) -2 1.500 0.600 -1.800
Door(D1) -1 1.300 2.100 -2.730
First Floor
Window(W1) -3 1.500 1.450 -6.525
Window(W2) -2 1.200 1.450 -3.480
Window(W4) -2 0.600 1.450 -1.740
Door (D2) -4 0.900 1.450 -5.220
Door (D4) -2 0.750 2.400 -3.600
Door (DW2) -1 1.100 2.400 -2.640
Total Outer plaster Qty 545.977 Sqm
Ground Floor
Grid 1-1,2-2,3-3 L=(2.75+3.6+2.7+3.35) 5 12.400 62.000
Grid A-A,B-B,C-C,D-D,E-E,L=(4.4+4.4) 9 8.800 79.200
Partation Wall Between Toilet and Store 2 2.750 5.500
Partation Wall at Registration room 2 3.600 7.200
Partation Wall at Store and Scrub Sink 2 2.700 5.400
Partation Wall Between Toilet, Ante/Post-
2 6.520 13.040
Natal beds andSluice
Partition wall (Remaining) 1 2.850 2.850
First Floor
Grid 1-1 1 2.350 2.350
Grid 2-2 &3-3 3 12.400 37.200
Grid A-A & B-B 3 8.000 24.000
Grid C-C & D-D 4 1.265 5.060
Grid E-E 1 4.000 4.000
Partition Wall At Toilet & Battery house 2 8.795 17.590
-Kitchen 2 5.800 11.600
T.L. 276.990 3.025 837.895
C. Miscellanous
Appron 1 52.950 0.250 13.237
Drain 1 66.450 0.450 29.902
Total 881.034 Sqm
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
sluice 1 1.890 2.320 4.384
Entry porch 1 9.960 2.100 20.916
At Staircase Area 1 3.085 2.520 7.774
Ramp 1 1.500 6.930 10.395
Apron 1 51.450 0.450 23.152
Terrace 1 12.800 5.885 75.328
Roof 1 14.370 6.370 91.536
1 4.720 4.400 20.768
First Floor Area 75.300
Total 413.772 Sqm
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
delivery room 1 3.225 0.900 2.902
kitchen 1 4.785 2.520 12.058
Skirting portion
Ground Floor
Toilet -wall 1 6.600 1.350 8.910 53.370
-floor 1 1.800 1.500 2.700
Ante/Post Natal Bed room-wall 1 15.920 1.200 19.104
-Floor 1 4.065 3.895
Delivery room -wall 1 14.580 1.200 17.496
-Floor 1 4.065 3.225
Autoclave wall above waist slab 1 2.590 0.600 1.554
Sluice wall above waist slab 1 2.335 0.600 1.401
-Floor 1 2.355 1.800 4.239
First floor
Toilet Wall 2 6.600 1.350 17.820
Toilet floor 2 1.800 1.500 5.400
kitchen wall above waist slab 1 4.800 0.600 2.880
Kitchen Floor 1 3.200 2.335 7.472
Deduction:
Door(D2)(0.9*2.4) -9 0.900 1.200 -9.720
Door(D3)(0.75*2.4) -6 0.750 1.350 -6.075
Main Building
S.N. Description No. Length T.Length Breadth Height Quantity Unit Remark
14 Painting works
Balcony
Post-50mm dia(M) 5 3.000 0.157 1.250 2.943
Purlin-38mm dia (M) 2 5.150 0.119 1.250 1.536
Rafter-38mm dia(M) 4 1.500 0.119 1.250 0.894
Total 5.373 sqm
15.00 Roof Treatment Works
Main Building
S.No. Description Quantity Unit Rate Amount Remark
Brickwork
Metal work
Flooring Work
Painting works
13,096,276.82
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Detailed Estimate
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok FY:2077/078
Land Development
S.N. Description No. Length Breadth Height Quantity Unit Remark
For cutting field/earth for ground levelling 1 15.00 19.50 2.00 585.000
for top of retaining wall north of main building 1 20.00 0.45 0.050 0.450
for top of retaining wall east of main building 1 20.00 0.45 0.050 0.450
for top of retaining wall south of main building 1 12.00 0.45 0.050 0.270
Land Development
S.N. Description No. Length Breadth Height Quantity Unit Remark
RCC (1:1.5:3) work in foundation and
superstructure using crushed stone , sand and OPC
5.00 cement as per specification and instruction of site
engineer.
Column foundation
Trapezoidal portion 2 1.200 1.200 0.200 0.58
h/6(a^2+b^2+4((a+b)/2)^2)
2 0.27 0.55
1st Footing
Compound wall 1 32.00 0.250 0.650 5.20
above PL 1 25.00 0.230 0.875 5.03
brick column 10.00 0.35 0.350 0.875 1.07
Total 11.303 Cum
Land Development
S.N. Description No. Length Breadth Height Quantity Unit Remark
Riverbed Mixed Gravel filling work with proper
11.00 compaction as per specification and instruction of
site engineer.
approach road 1 200.000 4.000 0.125 100.000
Total 100.00 Cum
60mm thick Interlocking concrete block paving
12.00 work on floor
Compound wall
1st Footing of compound wall 1 35.00 0.600 0.250 5.25
2nd Footing of compound wall 1 35.00 0.450 0.250 3.94
3rd Footing upto plinth band of compound
1 35.00 0.350 0.200 2.45
wall
for retaining wall north of main building 1 20.00 0.98 3.00 58.500
for retaining wall east of main building 1 12.00 0.98 3.00 35.100
for retaining wall east of main building 1 12.00 0.98 2.50 29.250
for retaining wall south of main building 1 15.00 0.73 2.00 21.750
Total 156.238 Cum
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Abstract of cost
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok FY:2077/078
Land Development
S.No. Description Quantity Unit Rate Amount Remark
Land Development
S.No. Description Quantity Unit Rate Amount Remark
Total 3,086,631.5
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Detailed Estimate
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok FY:2077/078
Toilet Block
S.N. Description No. Length Breadth Height Quantity Unit Remark
Toilet Block
S.N. Description No. Length Breadth Height Quantity Unit Remark
4.00 Concrete works
Toilet Block
S.N. Description No. Length Breadth Height Quantity Unit Remark
Sill band 2.00 11.400 0.250 0.075 0.428
Total 8.703 Cum
Toilet Block
S.N. Description No. Length Breadth Height Quantity Unit Remark
Above plinth
Long Wall 2.00 3.140 0.230 2.500 3.611
Short Wall 1.00 2.310 0.230 2.500 1.328
2.00 1.410 0.230 2.500 1.622
Parapet Wall 1.00 15.960 0.230 0.250 0.918
Deduction
Door D3(0.9*2.5) -1.00 0.900 0.230 2.500 -0.518
Door D4(0.75*2.5) -1.00 0.750 0.230 2.500 -0.431
Ventilation V(0.6*0.6) -2.00 0.600 0.230 0.600 -0.166
Total 9.180 Cum
8.00 Alummunium door& window work
Toilet Block
S.N. Description No. Length Breadth Height Quantity Unit Remark
Total 2.250 Sqm
Total 15.480 kg
10.00 Plastering work
A. Outer Wall
Below Plinth 1.00 12.360 0.750 9.270
Above Plinth-Long Wall 2.00 3.390 2.675 18.137
-Short Wall 1.00 2.790 2.675 7.463
1.00 1.660 2.675 4.441
Chajja with Thickness Included 1.00 15.780 1.025 16.175
Parapet Wall 1.00 15.780 0.625 9.863
Deduction Half Face
Door D3(0.9*2.5) -1.00 0.900 0.500 2.500 -1.125
Door D4(0.75*2.5) -1.00 0.750 0.500 2.500 -0.938
Ventilation V(0.6*0.6) -2.00 0.600 0.500 0.600 -0.360
Total Outer Plaster Qty 62.925
B. Inner Walls
Male Toilet 1.00 4.720 1.250 2.675 15.783
Female Toilet 1.00 8.100 1.250 2.675 27.084
Toilet Block
S.N. Description No. Length Breadth Height Quantity Unit Remark
Deduction Half Face
Door D3(0.9*2.5) -1.00 0.900 0.500 2.500 -1.125
Door D4(0.75*2.5) -1.00 0.750 0.500 2.500 -0.938
Ventilation V(0.6*0.6) -2.00 0.600 0.500 0.600 -0.360
Total inner Plaster Oty 40.444
Net Plaster 103.369 Sqm
Toilet Block
S.N. Description No. Length Breadth Height Quantity Unit Remark
Total 0.515 Cum
Deduction
Door D3(0.09*2.5) -1.00 0.900 1.350 -1.215
Door D4(0.75*2.5) -1.00 0.750 1.350 -1.013
Total 20.297 Sqm
Toilet Block
S.N. Description No. Length Breadth Height Quantity Unit Remark
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Abstract of cost
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok FY:2077/078
Toilet Block
S.No. Description Quantity Unit Rate Amount Remark
A Civil Work
6.00 Centring &shuttering work of props plywood planking 66.534 Sqm 1,100.79 73,239.96
7.00 Brickwork
Toilet Block
S.No. Description Quantity Unit Rate Amount Remark
Metal work
Making and fixing 5 mm*20 mm M. S. grill work all
9.00 complete as per the specification and instruction of site 15.480 kgs 2,624.82 40,632.21
incharge
10.00 Plastering work
Total 908,796.190
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Detailed Estimate
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok FY:2077/078
Septic Tank
S.N. Description No. Length Breadth Height Quantity Unit Remark
1.00
Earthwork in excavation for foundation
1 5.880 2.220 1.420 18.536 Cum
2.00 Earth back filling all complete 1 18.536 0.300 5.560 Cum
Dry flat Brick soling work with approved
quality first class brick in perfect line &
level as per specification & instructions
3.00 all complete.
5.00
Reinforcement bar @1.8%,ofG15 & G29 1016.654 1016.654 Kg
6.00 Centering & Shuttering work
4 5.880 1.700 39.984
4 1.450 1.700 9.860
baffle wall 2 1.450 2.550 7.395
cover 1 5.980 2.300 13.754
70.993 Sqm
Septic Tank
S.N. Description No. Length Breadth Height Quantity Unit Remark
R.C.C work in (1:1.5:3 or M20 grade )
with cement sand crushed aggregate in
standard size, shape and level for all
reinforced cement concrete using mixture
and vibrator including mixing, laying,
7.00 compacting, curing and finishing all
complete.
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Abstract of Cost
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok FY:2077/078
Septic Tank
S.No. Description Quantity Unit Rate Amount Remark
Septic Tank
S.No. Description Quantity Unit Rate Amount Remark
Total 419,764.95
2.00 Earth back filling all complete 1 10.050 0.300 3.015 Cum
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Abstract of Cost
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok FY:2077/078
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Abstract of Cost
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok FY:2077/078
Placenta pit
S.No. Description Quantity Unit Rate Amount Remark
Total 73,215.94
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Detailed Estimate
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok FY:2077/078
1.00
Earthwork in excavation for foundation
10 1.00 1.00 0.50 5.00 Cum
2.00 Earth back filling all complete 1 5.00 1.00 0.30 1.50 Cum
Dry flat Brick soling work with approved
quality first class brick in perfect line &
level as per specification & instructions
3.00 all complete.
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Abstract of Cost
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok FY:2077/078
Total 188,573.1
2.00 Dry Brick soling work with approved quality of 1 4.80 3.00 0.15 2.16 Cum
brick in perfect line & level as per specification
& instructions all complete.
3.00 Plain cement concrete (1:3:6) with cement sand 1 4.80 3.00 0.08 1.08 Cum
crushed aggregate under wall, floor & column
foundation etc. including protection of sides,
laying compacting, curing with all complete.
FY:2077/078
Remark
d)
12.5 mm th. Cement sand plastering (1:4) in wall & floor whole
area with good finishing including racking the joint, cleaning
6.00 67.23 Sqm 458.92 30,853.19
and wetting the surface and curing the works all complete as per
specification and instruction. INSIDE WALL
Insurance premium
21,186,355.97
Name of the Project :- Contruction of Health Post (Type-4-HP Frame Structure)
Location :- Simthali, Kavrepalanchok FY:2077/078
Insurance premium for the work, plant and materials damage for contract work for all risk including Riot,Strike, Damage,Malicious
damage and Terrorism for contract work for project period 15 months + 1 year Maintenance period.
Insurance premium for the insurance of owner and consultant staff (named) Rs. 10,00,000.00 per person for 7 persons with unlimited
number of occurances per annum
Insurance Premium for construction equipments and machines with value of Rs.20,00,000.00 for 15 months
4 Insurance Premium for third party liability personal only per person Rs.2,00,000.00 for 7 persons for 15 months
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Building)
District Level Project Implementation Unit (Building)
Dhulikhel, Kavrepalanchok
Comepressive Strength of
2.2 nos 1 600.00
cement 600
3 Samd
3.1 Fineness Modulus Test nos 4 844 3376.00
Impurities/silt content
3.2 nos 4 800.00
percentage 200
3.3 Bulking 4 450 1800.00
Reinforcement ( Tensile
4
Strength Test)
4.1 Steel of 8mm dia sample 3 1200.00 3600.00
4.2 Steel of 12mm dia sample 3 1200.00 3600.00
4.3 Steel of 16mm dia sample 3 1200.00 3600.00
4.4 Steel of 20mm dia sample 3 1200.00 3600.00
5 Aggregate
5.1 Flakiness Test nos 2 509 1018.00
Sieve Anakysis result (Fineness
5.2 nos 2 900.00
Modulus) 450
g
ture)
FY: 077-078
Amount
17,995.05
17,995.05
16,920.00
6,493.30
15,000.00
74,403.40
R2 Providing and Laying of2mm thick Epoxy antistatic floor coating (4 layers and 9 com
complete as per design, drawings, specification and approval of site Engine
b/ k|lt j=dL=sf]
4392.77 Ö ?= 4392.770 k}=
R3
Scrub sink with stainless steel sink faucet. all complete set.
sources Level Qty Unit
labour skilled 2 nos
un skilled 1 nos
Stainless steel sink
materials
700X450X200 2 sets
Stainless steel sink table 1 sets
b. 32 mm pvc bottle trap
including 32mm CP waste
coupling with CP chain and
rubber plug etc. 2 nos
c. 15mm cp sink faucet 2 nos
d. 1.5x45cm (½"x18") pipe
connector 2 nos
e. Zink Oxide screw etc. LS
Actual rate
15% contractor overhead
Rate per set Rs. 111801.85 Total (Rs.)
loor coating (4 layers and 9 components) all
tion and approval of site Engineer.
k|To]s ;|
b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
3819.80 3819.80 3819.80
24,246.00 48,492.00
33,504.00 33,504.00
952.00
476.00
5,565.00 11,130.00
286.00
143.00
50.00 94,414.00
97,219.00
14,582.85
111,801.85