S No Task No Task Description

OPERATIONAL TEST OF THE ELECTRONIC


1 46-20-50-601 FLIGHT BAG INTERNAL BATTERY PACK
(STLMC)

OPERATIONAL TEST OF THE COCKPIT-VOICE-


2 23-71-21-202 RECORDER (CVR) UNDERWATER- LOCATING
DEVICE (ULD)

OPERATIONAL TEST OF THE REVERSION


3 23-81-00-201
SWITCH PANEL (RSP) TUNE SWITCH,
(31−61−17−710−803)
EMERGENCY 121.5 POSITION (MRB)
OPERATIONAL TEST OF THE FLIGHT-DATA-
4 31-31-09-201
RECORDER (FDR) UNDERWATER-LOCATING
(31-31-09-201)
DEVICE (ULD) (MRB)

5 DOWNLOAD OF THE QUICK ACCESS


31-33-00-301
RECORDER (POST SB 700-31-6001)

6 31-31-CUS-2001 PERFORM DOWNLOAD AND ANALYSIS OF THE


(31−33−00−970−802) FDR

7 23-71-CUS-2001 PERFORM DOWNLOAD AND ANALYSIS OF THE


(23−71−01−970−801) CVR
Sub Tasks Consumables

SLPB5043128H3
(LIP-017) KO-3 –
Kokam America
Polymer 2400 8.88
(BATTERIES)

TASK 23−71−21−720−802 Functional Test of the Cockpit−Voice−Recorder (CVR)


Underwater−Locating−Device (ULD)
TASK 52−43−00−010−801 (Open the Auxiliary Power Unit (APU) Access Doors
(321BB))
NIL
TASK 52−43−00−410−801 Close the Auxiliary Power Unit (APU) Access Doors
(321BB)
TASK 53−50−01−000−801 Removal of the Tailcone Access Panel (310BZ)
TASK 53−50−01−400−801 Installation of the Tailcone Access Panel (310BZ)

TASK 24−00−00−861−801 Connect Electrical Power to the Aircraft


TASK 24−00−00−861−802 Remove the Electrical Power from the Aircraft NIL
TASK 24−00−00−910−801 Electrical/Electronic Safety Precautions
TASK 52−43−00−010−801 Open the Auxiliary Power Unit (APU) Access Doors (321BB)
TASK 52−43−00−410−801 Close the Auxiliary Power Unit (APU) Access Doors
(321BB)
NIL
TASK 53−50−01−000−801 Removal of the Tailcone Access Panel (310BZ)
TASK 53−50−01−400−801 Installation of the Tailcone Access Panel (310BZ)
SPM−MM 51−25−00−110−801 Solvent Cleaning

TASK 24−00−00−861−801 Connect Electrical Power to the Aircraft


TASK 24−00−00−861−802 Remove the Electrical Power from the Aircraft
TASK 24−00−00−863−801 Opening of Non−Thermal Circuit Breakers
TASK 24−00−00−863−802 Closing of Non−Thermal Circuit Breakers
TASK 24−00−00−910−801 Electrical/Electronic Safety Precautions NIL
TASK 25−12−13−000−801 Removal of the Bulkhead Panels
TASK 25−12−13−400−801 Installation the Bulkhead Panels
TASK 31−33−00−970−803 Erase Memory of the Quick Access Recorder
(QAR)

TASK 24−00−00−861−801 Connect Electrical Power to the Aircraft


TASK 24−00−00−861−802 Remove the Electrical Power from the Aircraft
TASK 24−00−00−863−801 Opening of Non−Thermal Circuit Breakers NIL
TASK 24−00−00−863−802 Closing of Non−Thermal Circuit Breakers
TASK 24−00−00−910−801 Electrical/Electronic Safety Precautions

TASK 23−71−01−000−802 Removal of the Cockpit Voice Recorder (CVR)


TASK 23−71−01−400−802 Installation of the Cockpit Voice Recorder (CVR)
TASK 24−00−00−861−801 Connect Electrical Power to the Aircraft
TASK 24−00−00−861−802 Remove the Electrical Power from the Aircraft NIL
TASK 24−00−00−863−801 Opening of Non−Thermal Circuit Breakers
TASK 24−00−00−863−802 Closing of Non−Thermal Circuit Breakers
TASK 24−00−00−910−801 Electrical/Electronic Safety Precautions
Due Date /
Specialized Tools and Testers TRADE
Hours / Ldgs

AVCS

GSE 23−71−01 Tester Pinglite AVCS

NIL AVCS
GSE 23−71−01 Tester Pinglite
AVCS
GSE 23−71−01 Test Set

GSE 45X−45−01 Kit − Portable Maintenance−Access Terminal


AVCS
(PMAT)

GSE 31X−31−05 Portable Interface Unit (PI)


GSE 31X−31−07 PI Memory Card (PCMCIA)
AVCS
GSE 31X−31−08 Kit − Portable Interface Unit/2 (PI/2)
GSE 31X−31−10 Hand Held Multi−Purpose Interface

GSE 23X78K−71−03 CVR to GSE Interface Cable


GSE 31X−31−05 Portable Interface (PI) Unit
GSE 31X−31−07 PI Memory Card (PCMCIA)
GSE 31X−31−08 Kit − Portable Interface/2 (PI/2) Unit
AVCS
GSE 31X−31−09 CVR Download Patch Cable
GSE 31X−31−10 Hand Held Multi−Purpose Interface
GSE 45X−45−02 Kit − Portable Maintenance−Access Terminal
(PMAT)
INSP TYPE

15 MONTHS

30 MONTHS

30 MONTHS
30 MONTHS

GENERAL
TASK

GENERAL
TASK

GENERAL
TASK