Success Story: DLF Cyberpark


3D, 4D & 5D – Digital Construction Management Solution for DLF Cyberpark

Project Overview
 DLF Cyberpark offers a world-class
contemporary structure and a new age
work space.
 Spread across a 12 acre complex located on
NH8 road, Gurugram, it is only a 9 Km drive
from the airport.
 A combination of form and functionality,
this masterpiece complex offers a perfect
blend of work & leisure.
 The project involves 2.5 mn sq. ft.
development, 3 Distinct inter-connected
blocks, with each block being an
independent identity packed with amenities
like gym, food court etc.
 The project is targeting USGBC LEED
Platinum Certification, and is an USGBC
LEED CS V2009 certified Green Building.
 It is recycling 100% of organic waste
generated into manure in an organic waste
composter (OWC).
 The project has been designed such that the
75% of the building area has daylight
which reduces the demand of electrical The challenge
lighting.
 100% of construction waste generated in  With L&T Ltd’s target being to finish the DLF
the project has been sold back to recyclers. Cyber Park project in 24 months (including the
construction of structural RCC foundations,
columns, beams, slabs, retaining & shear walls,
core wall, stairs, ramps etc (constructed 'in-
situ'), initially, they were using Primavera &
Excel sheets for achieving the desired
objectives, including getting concrete
quantities for each structural element from
Telka model.

 L&T was looking forward to minute, day to day


planning, monitoring & control of construction
with the help of any visual tools, which were
initially not available to them.

 The main challenge for the L&T planning team


was completing the project on time &
tracking, monitoring and controlling the
progress of daily activities and minimizing
hinderance.
Success Story: DLF Cyberpark
3D, 4D & 5D – Digital Construction Management Solution for DLF Cyberpark

The solution VICO Office Suite brings people, technology & information
together, by allowing everyone involved in a project to see the
 Our 5D BIM team developed the master/ big picture right down to the minutest detail.
macro schedule & micro schedule for
DLF's Cyber Park project of L&T.
 The micro schedule (detailed daily planning
schedule) was completed and submitted for
daily progress monitoring.
 The macro schedule (master baseline
schedule) was also prepared & completed.
 We prepared & submitted 3D/ hybrid
graphical view based DPR tracker for daily
progress monitoring.
 L&T’s planning team was tracking real time
daily progress monitoring & controlling of
activities in Vico & on the same platform,
the management was taking real time
corrective action armed with a visual Vico Schedule Planner is the
forecasted impact of resources, time & cost. scientific way of optimizing a
construction schedule with
4D Simulations durations, sequencing logic,
and even geography specific
pricing. And, by creating a
schedule which eliminates
stops and starts for subs, it
helps reduce project risk and
keeps the project flowing
smoothly.

5D Cost Estimation of the project

Flowline Diagram Gantt Chart

Outcomes
With the help of micro & macro LBS schedule
visual technique/ detailed micro planned 5D BIM,
construction of RCC structure has successfully
been completed in a record time of 23 months. Resource Histogram Resource Graph

“We deeply appreciate the high quality consultancy services rendered by M/s Mansycom Consultants Pvt. Ltd. In
successfully implementing 5D BIM for the project.”
- Mr. Mukesh Kumar Dahiya, Project Manager, L&T, DLF Cyber Park Project Gurugram