RUNTU - SP.

RUNTU
00+000.00 - 05+000.00 RUTIN JALAN 5,000.00
05+000.00 - 12+200.00 HOLDING 7,200.00
12+200.00 - 12+900.00 RUTIN JALAN 700.00
12+900.00 - 14+140.00 RUTIN KONDISI 1,240.00
14+140.00 - 21+440.00 RUTIN JALAN 7,300.00
21,440.00

KUJAN - RUNTU
00+000.00 - 07+000.00 RUTIN KONDISI 7,000.00
07+000.00 - 07+100.00 RUTIN JALAN 100.00
07+100.00 - 08+104.00 REKONSTRUKSI 1,004.00
08+100.00 - 09+000.00 RUTIN JALAN 900.00
08+900.00 - 10+707.00 REKONSTRUKSI 1,807.00
10+700.00 - 16+200.00 RUTIN JALAN 5,500.00
16+200.00 - 16+725.00 REKONSTRUKSI 525.00
16+500.00 - 17+000.00 RUTIN JALAN 500.00
17+000.00 - 17+535.00 REKONSTRUKSI 535.00
17+500.00 - 18+350.00 RUTIN JALAN 850.00
18+350.00 - 33+950.00 HOLDING 15,600.00
33+950.00 - 42+477.00 RUTIN JALAN 8,527.00
42+420.00 42,848.00

38+900.00
13,000.00
DATA SURVEY
RUAS JALAN RUNTU - SP. RUNTU

Panjang Lebar Luas


No. STA. Posisi Lingkup Ket.
(M) (M) (M2)

1 00+352.00 Kanan 9.00 2.40 21.60 Rutin Jalan


2 00+395.00 Kanan 60.00 2.40 144.00 Rutin Jalan CAP
3 00+460.00 Kanan 23.00 1.50 34.50 Rutin Jalan CAP
4 00+530.00 Kanan 27.00 2.40 64.80 Rutin Jalan
00+574.00 Kanan 16.00 3.20 51.20 Rutin Jalan CAP
5
00+590.00 Kanan 20.00 2.40 48.00 Rutin Jalan CAP
6 00+674.00 Kanan 7.00 2.40 16.80 Rutin Jalan CAP
7 00+711.00 Kanan 12.00 2.40 28.80 Rutin Jalan
8 00+855.00 Kanan 7.00 2.40 16.80 Rutin Jalan
9 00+895.00 Kanan 6.00 2.40 14.40 Rutin Jalan
10 00+917.00 Kanan 5.00 2.40 12.00 Rutin Jalan CAP
11 00+957.00 Kanan 6.00 2.40 14.40 Rutin Jalan CAP
12 00+976.00 Kiri 6.00 4.00 24.00 Rutin Jalan CAP
13 01+023.00 Kanan 8.00 2.40 19.20 Rutin Jalan
14 01+095.00 Kanan 3.00 3.00 9.00 Rutin Jalan CAP
15 01+112.00 Kanan 11.00 2.50 27.50 Rutin Jalan
16 01+300.00 Kanan 6.00 3.00 18.00 Rutin Jalan
17 01+315.00 Full 12.00 6.00 72.00 Rutin Jalan
18 02+770.00 Kanan 21.00 3.00 63.00 Rutin Jalan CAP
19 02+800.00 Full 11.00 6.00 66.00 Rutin Jalan CAP
20 02+816.00 Tengah 2.00 2.00 4.00 Rutin Jalan CAP
21 02+836.00 Kanan 4.00 3.00 12.00 Rutin Jalan
22 02+894.00 Kiri 3.00 2.40 7.20 Rutin Jalan CAP
23 02+915.00 Kiri 17.00 1.20 20.40 Rutin Jalan CAP
24 02+980.00 Kanan 11.00 3.00 33.00 Rutin Jalan
25 03+036.00 Full 15.00 6.00 90.00 Rutin Jalan
26 03+054.00 Kanan 6.00 3.00 18.00 Rutin Jalan CAP
27 03+075.00 Kanan 4.00 3.00 12.00 Rutin Jalan
28 04+470.00 Kanan 12.00 3.00 36.00 Rutin Jalan CAP
04+490.00 Kanan 20.00 2.40 48.00 Rutin Jalan CAP
29
04+510.00 Full 26.00 6.00 156.00 Rutin Jalan
04+553.00 Full 13.00 6.00 78.00 Rutin Jalan CAP
30
04+566.00 Kanan 19.00 3.00 57.00 Rutin Jalan CAP
04+650.00 Full 14.00 6.00 84.00 Rutin Jalan CAP
31 04+664.00 Kanan 27.00 3.00 81.00 Rutin Jalan CAP
04+691.00 Tengah 36.00 2.50 90.00 Rutin Jalan CAP
32 04+738.00 Kanan 23.00 3.00 69.00 Rutin Jalan
33 04+789.00 Kanan 10.00 3.00 30.00 Rutin Jalan CAP
34 04+869.00 Full 24.00 6.00 144.00 Rutin Jalan
35 04+932.00 Kanan 13.00 2.40 31.20 Rutin Jalan CAP
36 04+960.00 Kiri 13.00 2.40 31.20 Rutin Jalan CAP
05+000.00
37 05+109.00 Kanan 7.00 2.50 17.50 Holding CAP
38 05+131.00 Kanan 12.00 2.40 28.80 Holding CAP
39 05+183.00 Kanan 17.00 2.50 42.50 Holding
40 05+230.00 Kanan 4.00 2.50 10.00 Holding
05+279.00 Full 14.00 6.00 84.00 Holding
41
05+293.00 Kanan 11.00 3.00 33.00 Holding
42 05+326.00 Kanan 16.00 3.00 48.00 Holding
43 05+353.00 Kanan 4.00 3.00 12.00 Holding
44 05+378.00 Kanan 22.00 3.00 66.00 Holding CAP
45 05+420.00 Kanan 3.00 2.50 7.50 Holding CAP
46 05+479.00 Full 50.00 6.00 300.00 Holding CAP
47 05+532.00 Kanan 3.00 2.40 7.20 Holding
05+537.00 Kiri 4.00 3.00 12.00 Holding CAP
48
05+541.00 Full 4.00 6.00 24.00 Holding CAP
49 05+562.00 Full 20.00 6.00 120.00 Holding
50 05+725.00 Kanan 8.00 2.40 19.20 Holding
51 05+905.00 Kanan 51.00 2.40 122.40 Holding
05+984.00 Full 5.00 6.00 30.00 Holding
52
05+989.00 Kanan 16.00 3.00 48.00 Holding
53 06+054.00 Kiri 9.00 2.40 21.60 Holding CAP
54 06+056.00 Kanan 4.00 2.40 9.60 Holding
06+102.00 Kiri 48.00 3.00 144.00 Holding CAP
55
06+102.00 Kanan 48.00 3.00 144.00 Holding Tikungan
06+161.00 Full 32.00 6.00 192.00 Holding
56
06+193.00 Kiri 10.00 2.40 24.00 Holding
57 06+236.00 Kanan 28.00 3.20 89.60 Holding CAP
58 06+415.00 Kanan 5.00 2.40 12.00 Holding
59 06+432.00 Kiri 6.00 2.40 14.40 Holding CAP
60 06+432.00 Kanan 6.00 2.40 14.40 Holding CAP
06+484.00 Kanan 3.00 3.00 9.00 Holding
61
06+487.00 Full 4.00 6.00 24.00 Holding
62 06+505.00 Kanan 11.00 3.00 33.00 Holding CAP
06+519.00 Kanan 20.00 2.40 48.00 Holding CAP
63
06+539.00 Full 25.00 6.00 150.00 Holding
06+590.00 Kanan 26.00 3.00 78.00 Holding CAP
06+616.00 Full 20.00 6.00 120.00 Holding
64
06+636.00 Kanan 26.00 3.00 78.00 Holding
06+662.00 Full 20.00 6.00 120.00 Holding
06+712.00 Kanan 5.00 3.00 15.00 Holding CAP
65
06+717.00 Full 7.00 6.00 42.00 Holding CAP
66 06+732.00 Full 20.00 6.00 120.00 Holding
06+852.00 Kanan 18.00 3.00 54.00 Holding
67
06+870.00 Kanan 6.00 2.40 14.40 Holding
06+880.00 Kanan 7.00 2.80 19.60 Holding
68
06+887.00 Kanan 4.00 2.40 9.60 Holding
69 06+895.00 Kanan 3.00 2.40 7.20 Holding CAP
70 06+925.00 Kanan 10.00 2.40 24.00 Holding
71 06+959.00 Kanan 9.00 3.20 28.80 Holding
72 06+998.00 Kanan 5.00 2.40 12.00 Holding CAP
73 07+043.00 Full 14.00 6.00 84.00 Holding
07+066.00 Full 30.00 6.00 180.00 Holding
74
07+096.00 Kanan 16.00 2.40 38.40 Holding
76 07+381.00 Kanan 6.00 2.40 14.40 Holding CAP
77 07+425.00 Kiri 4.00 2.50 10.00 Holding CAP
78 07+433.00 Kanan 9.00 3.00 27.00 Holding
79 07+451.00 Kanan 7.00 2.40 16.80 Holding CAP
80 07+641.00 Kanan 6.00 2.40 14.40 Holding
81 07+750.00 Full 10.00 6.00 60.00 Holding
82 07+800.00 Kanan 10.00 3.00 30.00 Holding CAP
83 07+874.00 Full 18.00 6.00 108.00 Holding
84 07+925.00 Kanan 13.00 2.50 32.50 Holding
85 07+942.00 Tengah 3.00 2.40 7.20 Holding
86 08+044.00 Full 19.00 6.00 114.00 Holding CAP
87 08+373.00 Kanan 16.00 2.50 40.00 Holding
08+402.00 Kanan 17.00 3.00 51.00 Holding
88
08+419.00 Full 16.00 6.00 96.00 Holding
89 08+498.00 Kanan 19.00 3.00 57.00 Holding CAP
08+525.00 Kanan 6.00 2.40 14.40 Holding
90
08+531.00 Kanan 12.00 3.00 36.00 Holding
91 08+549.00 Kiri 8.00 2.40 19.20 Holding CAP
92 08+564.00 Full 10.00 6.00 60.00 Holding
93 08+585.00 Kanan 5.00 3.00 15.00 Holding
94 08+599.00 Tengah 4.00 2.40 9.60 Holding CAP
95 08+643.00 Kanan 5.00 3.00 15.00 Holding
96 08+690.00 Kanan 10.00 2.40 24.00 Holding CAP
97 08+733.00 Kanan 14.00 4.00 56.00 Holding
98 08+778.00 Kanan 14.00 2.50 35.00 Holding
99 08+813.00 Kanan 8.00 2.40 19.20 Holding
100 08+823.00 Kiri 3.00 2.40 7.20 Holding CAP
101 08+876.00 Kanan 20.00 2.40 48.00 Holding
102 08+960.00 Kanan 17.00 1.50 25.50 Holding CAP
103 09+010.00 Kanan 8.00 2.40 19.20 Holding
104 09+427.00 Kanan 4.00 3.00 12.00 Holding
105 09+760.00 Kanan 7.00 2.40 16.80 Holding
106 09+798.00 Kanan 5.00 2.40 12.00 Holding
107 09+813.00 Kanan 6.00 2.40 14.40 Holding CAP
108 10+066.00 Kanan 9.00 3.00 27.00 Holding
109 10+267.00 Kanan 7.00 2.40 16.80 Holding
110 10+375.00 Kanan 5.00 2.40 12.00 Holding
111 10+514.00 Kanan 5.00 1.50 7.50 Holding CAP
112 10+630.00 Kanan 6.00 3.00 18.00 Holding
113 10+840.00 Kanan 8.00 3.50 28.00 Holding
114 10+914.00 Kanan 6.00 2.50 15.00 Holding
115 11+077.00 Kanan 4.00 2.50 10.00 Holding
116 11+095.00 Kanan 7.00 3.20 22.40 Holding
117 11+105.00 Kanan 5.00 3.00 15.00 Holding
118 11+290.00 Kanan 6.00 2.40 14.40 Holding
119 11+430.00 Kanan 6.00 2.40 14.40 Holding
11+437.00 Kiri 12.00 2.40 28.80 Holding CAP
120
11+449.00 Kiri 7.00 3.50 24.50 Holding
121 11+730.00 Kanan 13.00 2.40 31.20 Holding
122 11+808.00 Full 15.00 6.00 90.00 Holding
123 11+921.00 Kanan 18.00 2.50 45.00 Holding CAP
124 11+954.00 Kanan 17.00 3.00 51.00 Holding
12+000.00
125 12+012.00 Kanan 9.00 2.50 22.50 Rutin Jalan
126 12+035.00 Kanan 6.00 2.40 14.40 Rutin Jalan
127 12+089.00 Kanan 11.00 2.40 26.40 Rutin Jalan CAP
128 12+130.00 Kanan 14.00 3.00 42.00 Rutin Jalan
129 12+169.00 Kanan 16.00 3.00 48.00 Rutin Jalan
130 12+213.00 Kanan 14.00 3.20 44.80 Rutin Jalan
131 12+235.00 Kanan 13.00 2.00 26.00 Rutin Jalan CAP
132 12+271.00 Kanan 8.00 3.20 25.60 Rutin Jalan
133 12+287.00 Kiri 5.00 3.00 15.00 Rutin Jalan CAP
134 12+688.00 Kanan 14.00 3.00 42.00 Rutin Jalan CAP
12+900.00
135 13+060.00 Kanan 5.00 3.00 15.00 Rutin Kondisi
136 13+240.00 Full 26.00 6.00 156.00 Rutin Kondisi CAP
137 13+266.00 Full 33.75 6.00 202.50 Rutin Kondisi
138 13+607.00 Kanan 13.00 2.40 31.20 Rutin Kondisi
139 13+620.00 Kiri 7.00 2.97 20.80 Rutin Kondisi CAP
140 13+743.00 Kanan 7.00 3.00 21.00 Rutin Kondisi
141 13+858.00 Kanan 5.00 2.40 12.00 Rutin Kondisi
13+917.00 Full 30.00 6.00 180.00 Rutin Kondisi
142
13+947.00 Kanan 13.00 3.00 39.00 Rutin Kondisi
14+140.00
143 14+193.00 Full 12.00 6.00 72.00 Rutin Jalan
144 14+210.00 Kanan 3.00 2.40 7.20 Rutin Jalan CAP
145 14+245.00 Kanan 7.00 3.00 21.00 Rutin Jalan CAP
146 14+811.00 Kanan 8.00 2.40 19.20 Rutin Jalan
147 14+850.00 Kanan 8.00 2.40 19.20 Rutin Jalan
148 14+928.00 Kanan 7.00 2.40 16.80 Rutin Jalan
149 15+400.00 Kanan 6.00 2.40 14.40 Rutin Jalan
150 15+487.00 Kanan 5.00 2.40 12.00 Rutin Jalan
151 15+513.00 Tengah 3.00 1.50 4.50 Rutin Jalan CAP
152 15+570.00 Kanan 12.00 3.00 36.00 Rutin Jalan
15+608.00 Full 11.00 6.00 66.00 Rutin Jalan
153
15+619.00 Kiri 14.00 3.00 42.00 Rutin Jalan
154 15+638.00 Tengah 19.00 2.00 38.00 Rutin Jalan CAP
155 16+499.00 Full 75.00 6.00 450.00 Rutin Jalan
156 16+599.00 Kiri 10.00 2.40 24.00 Rutin Jalan CAP
157 16+609.00 Full 11.00 6.00 66.00 Rutin Jalan CAP
16+640.00 Full 20.00 6.00 120.00 Rutin Jalan
158
16+660.00 Kanan 16.00 3.00 48.00 Rutin Jalan
16+698.00 Full 80.00 6.00 480.00 Rutin Jalan
159
16+778.00 Kanan 12.00 3.00 36.00 Rutin Jalan
160 16+717.00 Kanan 10.00 3.00 30.00 Rutin Jalan
161 16+737.00 Kanan 15.00 3.00 45.00 Rutin Jalan
16+757.00 Kanan 12.00 3.00 36.00 Rutin Jalan
162
16+769.00 Full 13.00 6.00 78.00 Rutin Jalan
163 16+786.00 Kanan 17.00 3.00 51.00 Rutin Jalan
164 16+980.00 Kanan 42.00 4.00 168.00 Rutin Jalan CAP
165 17+036.00 Kanan 20.00 3.50 70.00 Rutin Jalan
166 17+092.00 Kanan 3.00 2.40 7.20 Rutin Jalan CAP
167 17+143.00 Full 28.00 6.00 168.00 Rutin Jalan
168 17+184.00 Tengah 10.00 2.50 25.00 Rutin Jalan CAP
169 17+195.00 Kiri 9.00 3.00 27.00 Rutin Jalan
17+207.00 Kiri 25.00 3.00 75.00 Rutin Jalan CAP
170
17+207.00 Kanan 25.00 3.00 75.00 Rutin Jalan
17+250.00 Kiri 16.00 3.00 48.00 Rutin Jalan CAP
171
17+250.00 Kanan 16.00 3.00 48.00 Rutin Jalan
17+273.00 Full 8.00 6.00 48.00 Rutin Jalan
172
17+281.00 Kanan 5.00 3.00 15.00 Rutin Jalan
173 17+294.00 Kiri 5.00 2.00 10.00 Rutin Jalan CAP
174 17+303.00 Tengah 17.00 2.00 34.00 Rutin Jalan CAP
175 17+323.00 Kanan 36.00 3.00 108.00 Rutin Jalan CAP
17+362.00 Full 20.00 6.00 120.00 Rutin Jalan
176
17+382.00 Kanan 15.00 3.00 45.00 Rutin Jalan
177 17+404.00 Kiri 13.00 2.00 26.00 Rutin Jalan CAP
178 17+428.00 Kanan 29.00 2.40 69.60 Rutin Jalan
179 17+500.00 Kiri 4.00 3.00 12.00 Rutin Jalan CAP
180 17+508.00 Kanan 9.00 3.20 28.80 Rutin Jalan
17+524.00 Full 12.00 6.00 72.00 Rutin Jalan
181
17+536.00 Tengah 9.00 2.40 21.60 Rutin Jalan
182 17+611.00 Kanan 5.00 2.40 12.00 Rutin Jalan CAP
183 17+622.00 Kanan 11.00 2.40 26.40 Rutin Jalan
184 17+640.00 Kanan 18.00 2.40 43.20 Rutin Jalan
185 17+700.00 Tengah 12.00 3.00 36.00 Rutin Jalan CAP
186 17+716.00 Kiri 14.00 2.40 33.60 Rutin Jalan
187 17+734.00 Full 37.00 6.00 222.00 Rutin Jalan
188 17+823.00 Kanan 5.00 2.40 12.00 Rutin Jalan
189 18+650.00 Kanan 8.00 2.00 16.00 Rutin Jalan CAP
190 19+602.00 Kanan 3.00 2.50 7.50 Rutin Jalan CAP
191 19+750.00 Tengah 5.00 2.00 10.00 Rutin Jalan CAP
192 19+770.00 Kanan 9.00 1.50 13.50 Rutin Jalan CAP
193 19+803.00 Kanan 10.00 1.50 15.00 Rutin Jalan CAP
194 19+879.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
195 19+902.00 Kanan 15.00 3.00 45.00 Rutin Jalan
196 19+965.00 Tengah 33.00 2.40 79.20 Rutin Jalan CAP
197 20+010.00 Kanan 6.00 3.20 19.20 Rutin Jalan CAP
198 20+036.00 Kanan 8.00 1.50 12.00 Rutin Jalan CAP
199 20+056.00 Kiri 5.00 1.50 7.50 Rutin Jalan CAP
200 20+125.00 Kanan 17.00 2.00 34.00 Rutin Jalan CAP
201 20+223.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
202 20+318.00 Kanan 12.00 3.00 36.00 Rutin Jalan CAP
203 20+370.00 Kiri 15.00 2.00 30.00 Rutin Jalan
204 20+413.00 Kiri 7.00 1.50 10.50 Rutin Jalan CAP
205 20+510.00 Kanan 10.00 2.00 20.00 Rutin Jalan CAP
206 20+565.00 Kanan 8.00 3.00 24.00 Rutin Jalan
207 20+577.00 Tengah 6.00 1.50 9.00 Rutin Jalan CAP
208 20+588.00 Kanan 9.00 2.40 21.60 Rutin Jalan
209 20+613.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
210 20+717.00 Kanan 12.00 1.50 18.00 Rutin Jalan CAP
211 20+763.00 Full 14.00 6.00 84.00 Rutin Jalan
212 20+841.00 Full 8.00 6.00 48.00 Rutin Jalan
213 21+013.00 Kanan 5.00 3.00 15.00 Rutin Jalan CAP
214 21+044.00 Kanan 8.00 3.00 24.00 Rutin Jalan CAP
215 21+323.00 Kanan 6.00 1.50 9.00 Rutin Jalan CAP
21+414.00

Total 11,668.90
DATA SURVEY
RUAS JALAN KUJAN - RUNTU

Panjang Lebar Luas


No. STA. Posisi Lingkup Ket.
(M) (M) (M2)

1 02+338.00 Full 34.00 6.00 204.00 Rutin Kondisi CAP


2 02+388.00 Kiri 10.00 2.50 25.00 Rutin Kondisi CAP
3 02+407.00 Kiri 3.00 1.00 3.00 Rutin Kondisi CAP
4 02+412.00 Kiri 5.00 3.00 15.00 Rutin Kondisi CAP
5 01+417.00 Kanan 6.00 3.00 18.00 Rutin Kondisi CAP
6 02+438.00 Kanan 12.00 3.00 36.00 Rutin Kondisi CAP
02+460.00 Full 7.00 6.00 42.00 Rutin Kondisi CAP
7
02+467.00 Kiri 6.00 3.00 18.00 Rutin Kondisi CAP
8 02+491.00 Kanan 5.00 2.00 10.00 Rutin Kondisi CAP
9 02+548.00 Full 10.00 6.00 60.00 Rutin Kondisi
10 02+680.00 Kanan 11.00 3.00 33.00 Rutin Kondisi
11 02+816.00 Kanan 17.00 3.50 59.50 Rutin Kondisi
12 02+921.00 Full 5.00 6.00 30.00 Rutin Kondisi CAP
13 02+931.00 Full 6.00 6.00 36.00 Rutin Kondisi CAP
14 02+987.00 Kanan 11.00 3.50 38.50 Rutin Kondisi
15 03+531.00 Full 37.00 6.00 222.00 Rutin Kondisi CAP
16 03+630.00 Kiri 8.00 2.00 16.00 Rutin Kondisi CAP
17 03+725.00 Kanan 5.00 2.40 12.00 Rutin Kondisi
18 03+790.00 Full 13.00 6.00 78.00 Rutin Kondisi
19 03+934.00 Kanan 7.00 2.50 17.50 Rutin Kondisi
20 03+984.00 Kanan 5.00 2.50 12.50 Rutin Kondisi
21 04+002.00 Kiri 6.00 3.00 18.00 Rutin Kondisi CAP
22 04+022.00 Full 14.00 6.00 84.00 Rutin Kondisi CAP
23 04+108.00 Kiri 3.00 1.50 4.50 Rutin Kondisi CAP
24 04+113.00 Tengah 3.00 1.00 3.00 Rutin Kondisi CAP
04+165.00 Kiri 54.00 3.00 162.00 Rutin Kondisi CAP
25
04+165.00 Kanan 54.00 3.00 162.00 Rutin Kondisi
26 04+245.00 Kiri 8.00 1.50 12.00 Rutin Kondisi CAP
27 04+531.00 Kiri 9.00 2.50 22.50 Rutin Kondisi
04+604.00 Kanan 33.00 3.00 99.00 Rutin Kondisi
28
04+637.00 Full 34.00 6.00 204.00 Rutin Kondisi
29 04+689.00 Kiri 8.00 1.50 12.00 Rutin Kondisi CAP
30 05+430.00 Kanan 12.00 2.50 30.00 Rutin Kondisi CAP
31 06+090.00 Kanan 5.00 2.00 10.00 Rutin Kondisi CAP
32 06+359.00 Kanan 19.00 1.50 28.50 Rutin Kondisi CAP
33 06+537.00 Full 20.00 6.00 120.00 Rutin Kondisi CAP
34 06+702.00 Kanan 4.00 2.50 10.00 Rutin Kondisi CAP
35 06+744.00 Kanan 3.00 1.50 4.50 Rutin Kondisi CAP
36 06+898.00 Tengah 9.00 1.50 13.50 Rutin Kondisi CAP
37 06+925.00 Kanan 3.00 1.00 3.00 Rutin Kondisi CAP
06+980.00
38 06+990.00 Full 10.00 6.00 Rekonstruksi
39 07+008.00 Kanan 10.00 3.00 Rekonstruksi
40 07+089.00 Tengah 6.00 2.00 Rekonstruksi
07+900.00
41 08+380.00 Tengah 21.00 2.00 42.00 Rutin Jalan CAP
42 08+424.00 Tengah 10.00 2.00 20.00 Rutin Jalan CAP
08+434.00 Kanan 6.00 2.40 14.40 Rutin Jalan
43
08+440.00 Kanan 10.00 4.00 40.00 Rutin Jalan
44 08+475.00 Kanan 53.00 3.00 159.00 Rutin Jalan CAP
45 08+483.00 Kiri 3.00 1.50 4.50 Rutin Jalan CAP
46 08+540.00 Tengah 4.00 1.50 6.00 Rutin Jalan CAP
08+544.00 Kanan 13.00 3.50 45.50 Rutin Jalan
47
08+557.00 Full 26.00 6.00 156.00 Rutin Jalan CAP
48 08+583.00 Full 25.00 6.00 150.00 Rutin Jalan
49 08+630.00 Full 17.00 6.00 102.00 Rutin Jalan CAP
50 08+668.00 Kanan 5.00 2.50 12.50 Rutin Jalan
51 08+685.00 Kanan 5.00 2.50 12.50 Rutin Jalan
08+728.00 Kanan 30.00 3.50 105.00 Rutin Jalan
52
08+758.00 Kanan 15.00 3.00 45.00 Rutin Jalan CAP
53 08+774.00 Tengah 3.00 2.50 7.50 Rutin Jalan
54 08+788.00 Kanan 5.00 2.40 12.00 Rutin Jalan
55 08+804.00 Kanan 5.00 2.50 12.50 Rutin Jalan
56 08+831.00 Kiri 22.00 3.50 77.00 Rutin Jalan
08+900.00
Rekonstruksi
10+475.00
57 10+718.00 Kanan 20.00 3.00 60.00 Rutin Jalan CAP
10+739.00 Kiri 19.00 2.40 45.60 Rutin Jalan
58
10+758.00 Full 12.00 6.00 72.00 Rutin Jalan
59 10+786.00 Full 53.00 6.00 318.00 Rutin Jalan
60 10+850.00 Kanan 25.00 2.40 60.00 Rutin Jalan
61 10+887.00 Kanan 11.00 2.40 26.40 Rutin Jalan
62 10+912.00 Kanan 6.00 2.40 14.40 Rutin Jalan
63 10+924.00 Kanan 7.00 2.40 16.80 Rutin Jalan
64 10+955.00 Full 25.00 6.00 150.00 Rutin Jalan
65 10+990.00 Tengah 7.00 2.00 14.00 Rutin Jalan CAP
66 11+070.00 Kanan 19.00 3.00 57.00 Rutin Jalan
67 11+083.00 Kiri 4.00 2.40 9.60 Rutin Jalan
68 11+100.00 Kiri 19.00 3.00 57.00 Rutin Jalan CAP
69 11+153.00 Kanan 5.00 2.40 12.00 Rutin Jalan
70 11+172.00 Kanan 29.00 2.40 69.60 Rutin Jalan
71 11+220.00 Kiri 7.00 2.40 16.80 Rutin Jalan
72 11+227.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
73 11+252.00 Kiri 19.00 1.50 28.50 Rutin Jalan CAP
74 11+323.00 Kanan 5.00 2.40 12.00 Rutin Jalan
75 11+460.00 Kanan 7.00 2.40 16.80 Rutin Jalan
76 11+522.00 Kanan 9.00 2.40 21.60 Rutin Jalan
77 11+536.00 Kanan 10.00 1.50 15.00 Rutin Jalan CAP
78 11+559.00 Kanan 3.00 2.40 7.20 Rutin Jalan
79 11+700.00 Kanan 7.00 2.40 16.80 Rutin Jalan
80 11+713.00 Kanan 21.00 2.00 42.00 Rutin Jalan CAP
81 11+742.00 Kanan 17.00 2.40 40.80 Rutin Jalan
82 11+759.00 Full 9.00 6.00 54.00 Rutin Jalan
83 11+770.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
84 11+800.00 Full 60.00 6.00 360.00 Rutin Jalan
85 12+000.00 Kiri 4.00 3.00 12.00 Rutin Jalan
86 12+035.00 Kiri 28.00 3.00 84.00 Rutin Jalan CAP
87 12+123.00 Full 29.00 6.00 174.00 Rutin Jalan CAP
88 12+227.00 Full 9.00 6.00 54.00 Rutin Jalan
13+185.00 Kanan 31.00 3.00 93.00 Rutin Jalan CAP
89
13+216.00 Full 42.00 6.00 252.00 Rutin Jalan CAP
90 13+262.00 Kanan 10.00 2.00 20.00 Rutin Jalan CAP
13+353.00 Kanan 29.00 3.00 87.00 Rutin Jalan CAP
91
13+382.00 Full 17.00 6.00 102.00 Rutin Jalan CAP
92 13+426.00 Kanan 16.00 3.00 48.00 Rutin Jalan CAP
93 13+473.00 Kanan 42.00 3.00 126.00 Rutin Jalan CAP
94 13+526.00 Kanan 9.00 2.00 18.00 Rutin Jalan CAP
95 13+607.00 Kanan 1.50 1.50 2.25 Rutin Jalan CAP
96 13+812.00 Kanan 12.00 3.00 36.00 Rutin Jalan CAP
97 13+853.00 Kanan 4.00 2.00 8.00 Rutin Jalan CAP
98 13+892.00 Kanan 29.00 2.50 72.50 Rutin Jalan CAP
99 13+932.00 Kanan 4.00 1.50 6.00 Rutin Jalan CAP
100 13+964.00 Kanan 21.00 2.00 42.00 Rutin Jalan CAP
101 14+010.00 Kanan 17.00 2.50 42.50 Rutin Jalan CAP
102 14+028.00 Kiri 22.00 3.00 66.00 Rutin Jalan CAP
103 14+195.00 Kanan 6.00 1.50 9.00 Rutin Jalan CAP
14+210.00 Kanan 97.00 3.00 291.00 Rutin Jalan CAP
104
14+307.00 Full 15.00 6.00 90.00 Rutin Jalan CAP
105 14+326.00 Full 58.00 6.00 348.00 Rutin Jalan CAP
106 14+394.00 Full 42.00 6.00 252.00 Rutin Jalan CAP
14+441.00 Full 61.00 6.00 366.00 Rutin Jalan CAP
107
14+502.00 Kanan 16.00 3.00 48.00 Rutin Jalan CAP
108 14+526.00 Kanan 15.00 3.00 45.00 Rutin Jalan CAP
109 14+553.00 Kanan 7.00 3.00 21.00 Rutin Jalan CAP
110 14+563.00 Full 30.00 6.00 180.00 Rutin Jalan CAP
111 14+735.00 Full 38.00 6.00 228.00 Rutin Jalan CAP
112 15+169.00 Kanan 12.00 2.00 24.00 Rutin Jalan
113 15+378.00 Kanan 7.00 2.50 17.50 Rutin Jalan
114 15+530.00 Kanan 7.00 3.00 21.00 Rutin Jalan
115 15+800.00 Kanan 7.00 2.50 17.50 Rutin Jalan
116 15+830.00 Kanan 4.00 2.50 10.00 Rutin Jalan
117 15+890.00 Full 2.00 3.00 6.00 Rutin Jalan CAP
118 15+931.00 Kanan 8.00 6.00 48.00 Rutin Jalan
119 16+030.00 Full 14.00 3.00 42.00 Rutin Jalan CAP
120 16+092.00 Kanan 21.00 6.00 126.00 Rutin Jalan
121 16+135.00 Kiri 6.00 2.00 12.00 Rutin Jalan
122 16+158.00 Kanan 4.00 1.50 6.00 Rutin Jalan CAP
123 16+189.00 Kanan 9.00 3.00 27.00 Rutin Jalan CAP
122.B 16+206.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
122.C 16+220.00 Kanan 9.00 2.50 22.50 Rutin Jalan CAP
122.D 16+234.00 Kanan 22.00 2.50 55.00 Rutin Jalan CAP
124 16+415.00 Kanan 5.00 2.00 10.00 Rutin Jalan CAP
125 16+429.00 Kanan 9.00 3.00 27.00 Rutin Jalan
126 16+515.00 Kanan 9.00 1.50 13.50 Rutin Jalan
127 16+530.00 Kanan 3.00 1.50 4.50 Rutin Jalan CAP
128 16+616.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
129 16+705.00 Kanan 5.00 2.50 12.50 Rutin Jalan
130 16+720.00 Kanan 14.00 2.50 35.00 Rutin Jalan
131 16+750.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
132 16+766.00 Full 11.00 6.00 66.00 Rutin Jalan CAP
133 16+793.00 Full 12.00 6.00 72.00 Rutin Jalan CAP
134 16+815.00 Kanan 6.00 3.00 18.00 Rutin Jalan CAP
135 16+863.00 Tengah 21.00 2.00 42.00 Rutin Jalan CAP
16+940.00
16+946.00 Kiri 14.00 3.00 Rekonstruksi
136
16+960.00 Full 22.00 6.00 Rekonstruksi
137 16+991.00 Full 42.00 6.00 Rekonstruksi
138 17+080.00 Kanan 8.00 2.00 Rekonstruksi
139 17+098.00 Kiri 14.00 2.50 Rekonstruksi
140 17+109.00 Kanan 4.00 1.50 Rekonstruksi
141 17+123.00 Kanan 7.00 1.50 Rekonstruksi
142 17+154.00 Kanan 5.00 2.50 Rekonstruksi
143 17+167.00 Kanan 3.00 2.00 Rekonstruksi
144 17+178.00 Full 22.00 6.00 Rekonstruksi
145 17+254.00 Kanan 19.00 3.00 Rekonstruksi
146 17+281.00 Kanan 8.00 3.00 Rekonstruksi
147 17+306.00 Kanan 6.00 2.50 Rekonstruksi
148 17+330.00 Kanan 2.00 2.50 Rekonstruksi
149 17+351.00 Kanan 9.00 2.00 Rekonstruksi
17+360.00
17+400.00 Full 7.00 6.00 42.00 Rutin Jalan
150
17+407.00 Kanan 19.00 3.00 57.00 Rutin Jalan
151 17+451.00 Full 21.00 6.00 126.00 Rutin Jalan CAP
152 17+484.00 Kanan 4.00 1.50 6.00 Rutin Jalan CAP
153 17+516.00 Full 33.00 6.00 198.00 Rutin Jalan CAP
154 17+562.00 Kanan 6.00 2.50 15.00 Rutin Jalan CAP
155 17+578.00 Kanan 22.00 2.00 44.00 Rutin Jalan CAP
156 17+618.00 Kanan 8.00 1.00 8.00 Rutin Jalan CAP
157 17+685.00 Kanan 5.00 2.00 10.00 Rutin Jalan CAP
158 17+822.00 Full 6.00 6.00 36.00 Rutin Jalan
159 17+860.00 Kanan 5.00 2.00 10.00 Rutin Jalan CAP
160 17+877.00 Kiri 3.00 1.00 3.00 Rutin Jalan CAP
161 18+220.00 Kiri 4.00 2.50 10.00 Rutin Jalan
162 18+256.00 Kanan 29.00 3.00 87.00 Rutin Jalan CAP
18+350.00
163 18+382.00 Kanan 7.00 3.00 21.00 Holding CAP
164 18+415.00 Kanan 8.00 3.00 24.00 Holding CAP
18+447.00 Kanan 22.00 3.00 66.00 Holding CAP
165
18+469.00 Full 31.00 6.00 186.00 Holding CAP
166 18+656.00 Kanan 6.00 2.00 12.00 Holding CAP
167 18+698.00 Kanan 8.00 2.50 20.00 Holding CAP
168 18+893.00 Kanan 14.00 3.00 42.00 Holding
169 18+934.00 Kanan 5.00 2.50 12.50 Holding
170 18+936.00 Kiri 17.00 2.00 34.00 Holding CAP
171 19+017.00 Kanan 4.00 2.00 8.00 Holding CAP
19+031.00 Kanan 11.00 3.00 33.00 Holding CAP
172
19+042.00 Full 18.00 6.00 108.00 Holding CAP
173 19+100.00 Kanan 11.00 2.00 22.00 Holding CAP
174 19+120.00 Kanan 8.00 1.50 12.00 Holding CAP
175 19+240.00 Kanan 11.00 3.00 33.00 Holding CAP
176 19+292.00 Kanan 7.00 2.00 14.00 Holding CAP
177 19+439.00 Full 38.00 6.00 228.00 Holding CAP
178 19+544.00 Kanan 3.00 1.50 4.50 Holding CAP
179 19+554.00 Kanan 3.00 3.00 9.00 Holding CAP
180 19+595.00 Kanan 11.00 3.00 33.00 Holding CAP
181 19+649.00 Kanan 7.00 2.00 14.00 Holding CAP
182 19+668.00 Kanan 12.00 2.00 24.00 Holding CAP
183 19+692.00 Kiri 8.00 2.00 16.00 Holding CAP
184 19+752.00 Kiri 4.00 2.50 10.00 Holding CAP
185 19+760.00 Kanan 2.00 3.00 6.00 Holding CAP
186 19+779.00 Kanan 30.00 2.00 60.00 Holding CAP
187 20+607.00 Full 69.00 6.00 414.00 Holding CAP
188 20+700.00 Full 38.00 6.00 228.00 Holding CAP
189 20+806.00 Kanan 10.00 3.00 30.00 Holding
190 21+225.00 Kanan 14.00 3.00 42.00 Holding
191 21+228.00 Kiri 3.00 2.00 6.00 Holding
192 21+264.00 Kanan 3.00 2.00 6.00 Holding CAP
193 21+324.00 Kanan 5.00 2.00 10.00 Holding CAP
194 21+347.00 Kanan 10.00 2.50 25.00 Holding
195 21+375.00 Kiri 7.00 3.00 21.00 Holding CAP
196 21+385.00 Kanan 10.00 2.50 25.00 Holding CAP
197 21+425.00 Kanan 4.00 1.50 6.00 Holding CAP
198 21+433.00 Kanan 20.00 1.50 30.00 Holding CAP
199 21+489.00 Kanan 27.00 3.00 81.00 Holding CAP
200 21+908.00 Kanan 11.00 3.00 33.00 Holding
201 21+911.00 Kiri 3.00 2.00 6.00 Holding CAP
202 22+617.00 Kanan 8.00 3.00 24.00 Holding
203 22+657.00 Kanan 7.00 2.50 17.50 Holding
204 22+718.00 Kanan 11.00 2.50 27.50 Holding
205 22+758.00 Kanan 4.00 2.50 10.00 Holding
206 22+783.00 Kanan 4.00 2.50 10.00 Holding
207 22+828.00 Kanan 7.00 2.50 17.50 Holding
22+914.00 Full 59.00 6.00 354.00 Holding
208
22+973.00 Kanan 11.00 3.00 33.00 Holding
209 22+998.00 Kanan 11.00 2.50 27.50 Holding CAP
210 23+019.00 Kanan 4.00 2.50 10.00 Holding
211 23+043.00 Kanan 7.00 1.50 10.50 Holding CAP
212 23+088.00 Kiri 14.00 1.50 21.00 Holding CAP
213 23+131.00 Kanan 16.00 2.50 40.00 Holding
214 23+159.00 Kanan 8.00 2.50 20.00 Holding
23+185.00 Kanan 12.00 3.00 36.00 Holding CAP
215
23+197.00 Full 9.00 6.00 54.00 Holding
216 23+212.00 Tengah 5.00 2.00 10.00 Holding CAP
217 23+228.00 Kanan 13.00 2.00 26.00 Holding
218 23+310.00 Kiri 4.00 3.00 12.00 Holding
219 23+313.00 Kanan 9.00 2.50 22.50 Holding
23+379.00 Kanan 12.00 3.00 36.00 Holding
220
23+391.00 Full 6.00 6.00 36.00 Holding
221 23+446.00 Kanan 5.00 1.50 7.50 Holding CAP
222 23+460.00 Kanan 20.00 3.00 60.00 Holding CAP
223 23+517.00 Kanan 11.00 3.00 33.00 Holding CAP
224 23+635.00 Kanan 5.00 1.50 7.50 Holding CAP
225 23+647.00 Kanan 41.00 3.00 123.00 Holding CAP
226 23+728.00 Full 11.00 6.00 66.00 Holding CAP
227 23+762.00 Kiri 20.00 3.00 60.00 Holding CAP
228 23+789.00 Full 20.00 6.00 120.00 Holding
229 23+827.00 Full 13.00 6.00 78.00 Holding
230 23+861.00 Kanan 5.00 1.00 5.00 Holding CAP
231 24+125.00 Kanan 5.00 2.00 10.00 Holding
232 24+126.00 Kiri 6.00 3.00 18.00 Holding CAP
233 24+330.00 Kanan 17.00 3.00 51.00 Holding
234 24+376.00 Tengah 6.00 2.00 12.00 Holding CAP
235 24+421.00 Kanan 4.00 1.50 6.00 Holding CAP
236 24+545.00 Kanan 5.00 3.00 15.00 Holding CAP
237 24+582.00 Tengah 4.00 3.00 12.00 Holding CAP
238 24+615.00 Kanan 9.00 3.00 27.00 Holding CAP
239 24+657.00 Kanan 6.00 2.50 15.00 Holding
240 24+818.00 Kanan 4.00 2.00 8.00 Holding CAP
24+880.00
241 24+875.00 Kanan 11.00 3.00 Rekonstruksi
242 24+887.00 Tengah 11.00 2.50 Rekonstruksi
243 24+915.00 Full 20.00 6.00 Rekonstruksi
244 24+955.00 Kanan 8.00 2.50 Rekonstruksi
245 25+008.00 Full 8.00 6.00 Rekonstruksi
246 25+065.00 Kanan 6.00 1.50 Rekonstruksi
247 25+095.00 Kanan 29.00 3.00 Rekonstruksi
248 25+147.00 Kanan 16.00 3.00 Rekonstruksi
249 25+190.00 Kanan 3.00 1.50 Rekonstruksi
250 25+230.00 Kanan 5.00 2.50 Rekonstruksi
251 25+279.00 Kiri 3.00 1.50 Rekonstruksi
252 25+306.00 Kanan 3.00 2.50 Rekonstruksi
253 25+317.00 Kanan 12.00 3.50 Rekonstruksi
254 25+340.00 Kanan 9.00 2.50 Rekonstruksi
255 25+366.00 Kanan 7.00 2.50 Rekonstruksi
256 25+392.00 Full 93.00 6.00 Rekonstruksi
25+478.00
257 25+605.00 Full 15.00 6.00 90.00 Holding
258 25+639.00 Kanan 13.00 3.00 39.00 Holding
259 25+658.00 Kiri 5.00 1.50 7.50 Holding
260 25+671.00 Kanan 3.00 2.00 6.00 Holding
261 25+751.00 Kanan 14.00 3.00 42.00 Holding CAP
262 25+775.00 Kanan 7.00 1.50 10.50 Holding CAP
263 25+793.00 Full 9.00 6.00 54.00 Holding CAP
264 25+860.00 Full 11.00 6.00 66.00 Holding CAP
265 25+926.00 Kiri 13.00 3.50 45.50 Holding CAP
266 25+947.00 Full 35.00 6.00 210.00 Holding CAP
267 25+988.00 Kiri 18.00 3.00 54.00 Holding CAP
268 26+011.00 Full 17.00 6.00 102.00 Holding CAP
269 26+066.00 Kanan 12.00 2.50 30.00 Holding CAP
270 26+137.00 Kanan 4.00 1.50 6.00 Holding CAP
26+340.00 Kanan 7.00 2.00 14.00 Holding
271
26+347.00 Kiri 8.00 4.00 32.00 Holding
272 26+358.00 Kanan 6.00 3.00 18.00 Holding CAP
273 26+389.00 Kanan 4.00 2.50 10.00 Holding CAP
274 26+397.00 Kiri 3.00 1.50 4.50 Holding CAP
275 26+405.00 Kanan 3.00 1.50 4.50 Holding CAP
276 26+452.00 Full 15.00 6.00 90.00 Holding
277 26+494.00 Kanan 6.00 3.00 18.00 Holding
278 26+650.00 Tengah 34.00 1.50 51.00 Holding CAP
279 26+694.00 Tengah 17.00 1.50 25.50 Holding CAP
280 26+707.00 Kanan 15.00 4.00 60.00 Holding
281 26+734.00 Kanan 16.00 4.00 64.00 Holding CAP
282 26+795.00 Tengah 5.00 1.00 5.00 Holding CAP
283 26+883.00 Tengah 7.00 1.50 10.50 Holding CAP
284 26+894.00 Tengah 12.00 1.50 18.00 Holding CAP
285 26+913.00 Kanan 10.00 2.40 24.00 Holding
286 26+944.00 Kanan 9.00 3.00 27.00 Holding
287 26+969.00 Kanan 5.00 2.00 10.00 Holding CAP
288 27+067.00 Kiri 4.00 1.50 6.00 Holding CAP
289 27+073.00 Kiri 2.00 1.50 3.00 Holding CAP
290 27+095.00 Kiri 15.00 4.00 60.00 Holding
291 27+563.00 Tengah 6.00 2.50 15.00 Holding CAP
292 27+570.00 Kanan 8.00 3.00 24.00 Holding CAP
27+588.00 Full 32.00 6.00 192.00 Holding
293
27+620.00 Kanan 13.00 3.00 39.00 Holding
294 27+644.00 Full 13.00 6.00 78.00 Holding
295 27+721.00 Kanan 3.00 4.00 12.00 Holding
296 28+340.00 Kanan 10.00 3.00 30.00 Holding CAP
297 28+351.00 Kiri 5.00 2.40 12.00 Holding
298 28+360.00 Kanan 25.00 3.00 75.00 Holding CAP
299 28+438.00 Full 10.00 6.00 60.00 Holding CAP
300 28+457.00 Full 9.00 6.00 54.00 Holding
301 28+476.00 Full 86.00 6.00 516.00 Holding
302 28+570.00 Kanan 25.00 3.00 75.00 Holding CAP
303 28+600.00 Full 22.00 6.00 132.00 Holding CAP
304 28+644.00 Kanan 12.00 2.00 24.00 Holding CAP
305 28+683.00 Full 9.00 6.00 54.00 Holding CAP
306 28+700.00 Kanan 8.00 4.00 32.00 Holding CAP
307 28+724.00 Full 18.00 6.00 108.00 Holding CAP
308 28+743.00 Kanan 48.00 3.00 144.00 Holding CAP
309 28+799.00 Tengah 5.00 1.50 7.50 Holding CAP
28+829.00 Full 16.00 6.00 96.00 Holding CAP
310
28+845.00 Kiri 27.00 3.00 81.00 Holding CAP
311 28+898.00 Kanan 16.00 1.50 24.00 Holding CAP
312 28+932.00 Tengah 1.50 1.50 2.25 Holding CAP
313 28+957.00 Kanan 16.00 4.00 64.00 Holding CAP
314 28+985.00 Kanan 7.00 3.00 21.00 Holding CAP
315 29+015.00 Kanan 6.00 1.50 9.00 Holding CAP
316 29+081.00 Full 9.00 6.00 54.00 Holding
317 29+980.00 Kanan 7.00 2.40 16.80 Holding
318 29+994.00 Kiri 13.00 1.50 19.50 Holding CAP
319 30+023.00 Kiri 15.00 1.50 22.50 Holding CAP
320 30+083.00 Tengah 5.00 1.50 7.50 Holding CAP
321 30+093.00 Tengah 7.00 2.00 14.00 Holding CAP
322 30+105.00 Tengah 5.00 2.00 10.00 Holding CAP
323 30+350.00 Full 27.00 6.00 162.00 Holding
30+373.00 Kiri 7.00 3.00 21.00 Holding CAP
324
30+380.00 Full 20.00 6.00 120.00 Holding CAP
325 30+425.00 Kanan 7.00 3.00 21.00 Holding
326 30+515.00 Kanan 5.00 3.00 15.00 Holding
327 30+595.00 Kanan 2.00 3.00 6.00 Holding CAP
328 30+840.00 Kanan 13.00 2.50 32.50 Holding CAP
329 30+858.00 Full 17.00 6.00 102.00 Holding
330 30+890.00 Kanan 10.00 3.00 30.00 Holding CAP
331 30+956.00 Kanan 9.00 2.50 22.50 Holding CAP
332 31+075.00 Full 13.00 6.00 78.00 Holding
333 31+200.00 Kanan 6.00 3.00 18.00 Holding CAP
334 31+210.00 Full 16.00 6.00 96.00 Holding
335 31+285.00 Full 8.00 6.00 48.00 Holding
336 31+303.00 Kanan 7.00 4.00 28.00 Holding CAP
337 31+338.00 Tengah 3.00 1.50 4.50 Holding CAP
338 31+346.00 Kanan 6.00 2.50 15.00 Holding
339 31+374.00 Kanan 3.00 2.00 6.00 Holding CAP
340 31+391.00 Kanan 8.00 2.40 19.20 Holding
341 31+408.00 Kanan 3.00 2.50 7.50 Holding
342 31+453.00 Kiri 2.00 1.50 3.00 Holding CAP
343 31+455.00 Kanan 5.00 2.50 12.50 Holding CAP
344 31+474.00 Kanan 3.00 2.50 7.50 Holding CAP
345 31+481.00 Kanan 9.00 2.50 22.50 Holding CAP
31+504.00 Kiri 6.00 3.00 18.00 Holding
346
31+510.00 Full 17.00 6.00 102.00 Holding
347 31+668.00 Kanan 6.00 2.00 12.00 Holding CAP
348 31+682.00 Kanan 5.00 2.50 12.50 Holding
31+754.00 Full 13.00 6.00 78.00 Holding
349
349
31+767.00 Kanan 11.00 3.00 33.00 Holding
350 31+898.00 Full 3.00 6.00 18.00 Holding CAP
351 31+925.00 Kanan 9.00 2.50 22.50 Holding
352 32+033.00 Tengah 5.00 3.00 15.00 Holding CAP
353 33+081.00 Kanan 3.00 3.00 9.00 Holding CAP
354 33+108.00 Kanan 7.00 2.50 17.50 Holding
355 33+116.00 Kiri 6.00 3.00 18.00 Holding CAP
356 33+250.00 Kanan 7.00 3.00 21.00 Holding
357 33+655.00 Kanan 8.00 2.40 19.20 Holding
358 33+750.00 Kanan 10.00 2.40 24.00 Holding
359 33+766.00 Kanan 12.00 2.40 28.80 Holding
33+810.00 Kanan 13.00 2.50 32.50 Holding
360
33+823.00 Full 7.00 6.00 42.00 Holding
361 33+900.00 Kanan 5.00 2.50 12.50 Holding CAP
326 33+915.00 Kanan 13.00 2.00 26.00 Holding CAP
327 33+932.00 Kanan 11.00 2.40 26.40 Holding
328 33+947.00 Kanan 20.00 2.40 48.00 Holding
33+950.00
329 33+973.00 Kanan 9.00 2.40 21.60 Rutin Jalan
33+987.00 Kanan 4.00 2.00 8.00 Rutin Jalan CAP
330
33+991.00 Full 8.00 6.00 48.00 Rutin Jalan CAP
331 34+059.00 Kanan 14.00 3.00 42.00 Rutin Jalan CAP
332 34+090.00 Kanan 10.00 3.00 30.00 Rutin Jalan CAP
333 34+103.00 Kanan 7.00 3.00 21.00 Rutin Jalan
334 34+141.00 Kiri 5.00 2.00 10.00 Rutin Jalan CAP
335 34+181.00 Full 14.00 6.00 84.00 Rutin Jalan CAP
336 34+230.00 Kanan 7.00 2.50 17.50 Rutin Jalan
337 34+313.00 Kanan 26.00 2.50 65.00 Rutin Jalan
338 34+345.00 Full 41.00 6.00 246.00 Rutin Jalan
339 34+433.00 Full 12.00 6.00 72.00 Rutin Jalan
340 34+494.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
341 34+575.00 Kiri 7.00 2.40 16.80 Rutin Jalan
342 34+594.00 Kanan 4.00 2.40 9.60 Rutin Jalan CAP
343 34+622.00 Full 30.00 6.00 180.00 Rutin Jalan
344 34+661.00 Kanan 9.00 2.50 22.50 Rutin Jalan CAP
345 34+666.00 Kiri 3.00 1.50 4.50 Rutin Jalan CAP
346 34+686.00 Kanan 15.00 1.50 22.50 Rutin Jalan CAP
347 34+699.00 Kiri 10.00 1.50 15.00 Rutin Jalan CAP
348 34+730.00 Kanan 4.00 2.00 8.00 Rutin Jalan CAP
349 34+743.00 Kanan 16.00 2.40 38.40 Rutin Jalan
350 34+765.00 Kiri 5.00 3.00 15.00 Rutin Jalan CAP
351 34+774.00 Kanan 12.00 4.00 48.00 Rutin Jalan
352 34+820.00 Tengah 4.00 1.50 6.00 Rutin Jalan CAP
353 34+829.00 Kanan 9.00 3.00 27.00 Rutin Jalan
354 34+849.00 Full 16.00 6.00 96.00 Rutin Jalan
355 34+874.00 Kanan 6.00 2.50 15.00 Rutin Jalan
356 34+893.00 Kanan 7.00 2.00 14.00 Rutin Jalan CAP
357 34+935.00 Kanan 5.00 2.40 12.00 Rutin Jalan
358 34+940.00 Tengah 8.00 1.50 12.00 Rutin Jalan CAP
34+962.00 Kanan 5.00 4.00 20.00 Rutin Jalan
359
34+967.00 Kanan 7.00 2.40 16.80 Rutin Jalan
360 34+977.00 Kiri 6.00 2.50 15.00 Rutin Jalan
361 34+987.00 Kiri 10.00 2.40 24.00 Rutin Jalan
362 35+000.00 Full 16.00 6.00 96.00 Rutin Jalan
363 35+182.00 Kanan 6.00 1.50 9.00 Rutin Jalan CAP
364 35+196.00 Tengah 6.00 1.50 9.00 Rutin Jalan CAP
365 35+228.00 Kanan 6.00 2.50 15.00 Rutin Jalan
366 35+295.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
367 35+307.00 Kanan 4.00 2.40 9.60 Rutin Jalan
368 35+394.00 Kanan 6.00 2.50 15.00 Rutin Jalan CAP
369 35+437.00 Kanan 11.00 2.00 22.00 Rutin Jalan CAP
370 35+496.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
371 35+535.00 Kiri 5.00 2.40 12.00 Rutin Jalan CAP
372 35+542.00 Kanan 9.00 4.00 36.00 Rutin Jalan CAP
373 35+616.00 Kanan 12.00 2.40 28.80 Rutin Jalan
374 35+634.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
35+646.00 Full 12.00 6.00 72.00 Rutin Jalan CAP
375
35+658.00 Kanan 5.00 3.00 15.00 Rutin Jalan CAP
376 35+676.00 Kanan 15.00 3.00 45.00 Rutin Jalan
377 35+748.00 Kanan 10.00 2.40 24.00 Rutin Jalan
378 35+776.00 Kanan 6.00 2.50 15.00 Rutin Jalan
379 35+790.00 Kanan 3.00 2.50 7.50 Rutin Jalan
380 35+790.00 Kiri 2.00 1.50 3.00 Rutin Jalan CAP
381 35+823.00 Kanan 12.00 3.00 36.00 Rutin Jalan
382 35+840.00 Kanan 8.00 2.40 19.20 Rutin Jalan
383 35+853.00 Kanan 9.00 2.00 18.00 Rutin Jalan CAP
384 35+891.00 Kanan 15.00 3.00 45.00 Rutin Jalan CAP
385 38+098.00 Kanan 7.00 2.40 16.80 Rutin Jalan
386 38+123.00 Tengah 2.00 2.40 4.80 Rutin Jalan CAP
38+128.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
387
38+134.00 Kanan 5.00 4.00 20.00 Rutin Jalan CAP
388 38+183.00 Kanan 8.00 2.50 20.00 Rutin Jalan CAP
389 38+195.00 Kanan 7.00 3.00 21.00 Rutin Jalan CAP
390 38+218.00 Kanan 22.00 3.50 77.00 Rutin Jalan CAP
391 38+245.00 Kanan 7.00 2.50 17.50 Rutin Jalan CAP
392 38+259.00 Kanan 11.00 2.50 27.50 Rutin Jalan CAP
393 38+353.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
394 38+391.00 Kiri 2.00 2.00 4.00 Rutin Jalan CAP
395 38+398.00 Kiri 9.00 2.00 18.00 Rutin Jalan CAP
396 38+399.00 Kanan 8.00 2.00 16.00 Rutin Jalan CAP
397 38+408.00 Kiri 3.00 2.00 6.00 Rutin Jalan
398 38+413.00 Kiri 4.00 2.00 8.00 Rutin Jalan CAP
399 38+460.00 Kanan 2.00 1.50 3.00 Rutin Jalan CAP
400 38+842.00 Kanan 11.00 2.00 22.00 Rutin Jalan
401 38+940.00 Kanan 6.00 2.50 15.00 Rutin Jalan
402 38+985.00 Kanan 9.00 2.50 22.50 Rutin Jalan
403 39+033.00 Kiri 6.00 3.50 21.00 Rutin Jalan
404 39+050.00 Kanan 6.00 3.00 18.00 Rutin Jalan
405 39+056.00 Kiri 5.00 1.50 7.50 Rutin Jalan
406 39+060.00 Kanan 2.00 2.00 4.00 Rutin Jalan CAP
407 39+094.00 Kanan 4.00 2.50 10.00 Rutin Jalan
408 39+101.00 Full 35.00 6.00 210.00 Rutin Jalan
409 39+325.00 Full 33.00 6.00 198.00 Rutin Jalan
410 39+390.00 Kanan 12.00 2.50 30.00 Rutin Jalan
411 39+535.00 Kiri 4.00 2.00 8.00 Rutin Jalan
412 39+910.00 Kanan 5.00 3.00 15.00 Rutin Jalan
413 40+006.00 Kanan 10.00 3.00 30.00 Rutin Jalan
414 40+049.00 Kanan 5.00 3.00 15.00 Rutin Jalan
415 40+085.00 Kanan 24.00 3.00 72.00 Rutin Jalan
416 40+118.00 Kanan 14.00 3.00 42.00 Rutin Jalan
417 40+144.00 Kanan 2.00 1.00 2.00 Rutin Jalan CAP
418 40+152.00 Kanan 3.00 2.00 6.00 Rutin Jalan
419 40+166.00 Kanan 8.00 2.50 20.00 Rutin Jalan
40+203.00 Kanan 12.00 3.00 36.00 Rutin Jalan
420
40+215.00 Full 6.00 6.00 36.00 Rutin Jalan
421 40+226.00 Kanan 4.00 2.50 10.00 Rutin Jalan CAP
422 40+711.00 Kanan 9.00 3.00 27.00 Rutin Jalan
423 40+722.00 Kiri 6.00 3.50 21.00 Rutin Jalan
424 40+825.00 Full 10.00 6.00 60.00 Rutin Jalan
425 40+865.00 Kanan 9.00 3.00 27.00 Rutin Jalan
426 40+953.00 Kanan 8.00 3.00 24.00 Rutin Jalan
427 41+043.00 Kanan 10.00 2.00 20.00 Rutin Jalan
428 41+127.00 Kanan 10.00 3.00 30.00 Rutin Jalan
429 41+143.00 Full 20.00 6.00 120.00 Rutin Jalan
430 41+325.00 Kanan 6.00 3.00 18.00 Rutin Jalan
431 41+352.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
432 42+075.00 Full 14.00 6.00 84.00 Rutin Jalan CAP
433 42+302.00 Kanan 7.00 2.00 14.00 Rutin Jalan
434 42+334.00 Kiri 6.00 3.00 18.00 Rutin Jalan CAP

Total 21,374.60
DATA SURVEY
RUAS JALAN RUNTU - SP. RUNTU

Panjang Lebar Luas Rutin Rutin


No. STA. Posisi Holding Lingkup Ket.
(M) (M) (M2) Jalan Kondisi

1 00+352.00 Kanan 9.00 2.40 21.60 Rutin Jalan LPA


2 00+395.00 Kanan 60.00 2.40 144.00 Rutin Jalan CAP
3 00+460.00 Kanan 23.00 1.50 34.50 Rutin Jalan CAP
4 00+530.00 Kanan 27.00 2.40 64.80 Rutin Jalan
00+574.00 Kanan 16.00 3.20 51.20 Rutin Jalan CAP
5
00+590.00 Kanan 20.00 2.40 48.00 Rutin Jalan CAP
6 00+674.00 Kanan 7.00 2.40 16.80 Rutin Jalan CAP
7 00+711.00 Kanan 12.00 2.40 28.80 Rutin Jalan
8 00+855.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
9 00+895.00 Kanan 6.00 2.40 14.40 Rutin Jalan LPA
10 00+917.00 Kanan 5.00 2.40 12.00 Rutin Jalan CAP
11 00+957.00 Kanan 6.00 2.40 14.40 Rutin Jalan CAP
12 00+976.00 Kiri 6.00 4.00 24.00 Rutin Jalan CAP
13 01+023.00 Kanan 8.00 2.40 19.20 Rutin Jalan
14 01+095.00 Kanan 3.00 3.00 9.00 Rutin Jalan CAP
15 01+112.00 Kanan 11.00 2.50 27.50 Rutin Jalan
16 01+300.00 Kanan 6.00 3.00 18.00 Rutin Jalan LPA
17 01+315.00 Full 12.00 6.00 72.00 Rutin Jalan LPA
18 02+770.00 Kanan 21.00 3.00 63.00 Rutin Jalan CAP
19 02+800.00 Full 11.00 6.00 66.00 Rutin Jalan CAP
20 02+816.00 Tengah 2.00 2.00 4.00 Rutin Jalan CAP
21 02+836.00 Kanan 4.00 3.00 12.00 Rutin Jalan
22 02+894.00 Kiri 3.00 2.40 7.20 Rutin Jalan CAP
23 02+915.00 Kiri 17.00 1.20 20.40 Rutin Jalan CAP
24 02+980.00 Kanan 11.00 3.00 33.00 Rutin Jalan LPA
25 03+036.00 Full 10.00 6.00 60.00 Rutin Jalan LPA
26 03+054.00 Kanan 6.00 3.00 18.00 Rutin Jalan CAP
27 03+075.00 Kanan 4.00 3.00 12.00 Rutin Jalan
28 04+470.00 Kanan 12.00 3.00 36.00 Rutin Jalan CAP
04+490.00 Kanan 20.00 2.40 48.00 Rutin Jalan CAP
29
04+510.00 Full 26.00 6.00 156.00 Rutin Jalan
04+553.00 Full 13.00 6.00 78.00 Rutin Jalan CAP
30
04+566.00 Kanan 19.00 3.00 57.00 Rutin Jalan CAP
04+650.00 Full 14.00 6.00 84.00 Rutin Jalan CAP
31 04+664.00 Kanan 27.00 3.00 81.00 Rutin Jalan CAP
04+691.00 Tengah 36.00 2.50 90.00 Rutin Jalan CAP
32 04+738.00 Kanan 23.00 3.00 69.00 Rutin Jalan
33 04+789.00 Kanan 10.00 3.00 30.00 Rutin Jalan CAP
34 04+869.00 Full 20.00 6.00 120.00 Rutin Jalan LPA
35 04+932.00 Kanan 13.00 2.40 31.20 Rutin Jalan CAP
36 04+960.00 Kiri 13.00 2.40 31.20 Rutin Jalan CAP
05+000.00
37 05+109.00 Kanan 7.00 2.50 17.50 Holding CAP
38 05+131.00 Kanan 12.00 2.40 28.80 Holding CAP
39 05+183.00 Kanan 17.00 2.50 42.50 Holding LPA
40 05+230.00 Kanan 4.00 2.50 10.00 Holding
05+279.00 Full 14.00 6.00 84.00 Holding LPA
41
05+293.00 Kanan 11.00 3.00 33.00 Holding LPA
42 05+326.00 Kanan 16.00 3.00 48.00 Holding
43 05+353.00 Kanan 4.00 3.00 12.00 Holding
44 05+378.00 Kanan 22.00 3.00 66.00 Holding CAP
45 05+420.00 Kanan 3.00 2.50 7.50 Holding CAP
46 05+479.00 Full 50.00 6.00 300.00 Holding CAP
47 05+532.00 Kanan 3.00 2.40 7.20 Holding
05+537.00 Kiri 4.00 3.00 12.00 Holding CAP
48
05+541.00 Full 4.00 6.00 24.00 Holding CAP
49 05+562.00 Full 20.00 6.00 120.00 Holding LPA
50 05+725.00 Kanan 8.00 2.40 19.20 Holding
51 05+905.00 Kanan 51.00 2.40 122.40 Holding
05+984.00 Full 5.00 6.00 30.00 Holding LPA
52
05+989.00 Kanan 16.00 3.00 48.00 Holding LPA
53 06+054.00 Kiri 9.00 2.40 21.60 Holding CAP
54 06+056.00 Kanan 4.00 2.40 9.60 Holding
06+102.00 Kiri 48.00 3.00 144.00 Holding CAP
55
06+102.00 Kanan 48.00 3.00 144.00 Holding LPA
06+161.00 Full 32.00 6.00 192.00 Holding LPA
56
06+193.00 Kiri 10.00 2.40 24.00 Holding LPA
57 06+236.00 Kanan 28.00 3.20 89.60 Holding CAP
58 06+415.00 Kanan 5.00 2.40 12.00 Holding LPA
59 06+432.00 Kiri 6.00 2.40 14.40 Holding CAP
60 06+432.00 Kanan 6.00 2.40 14.40 Holding CAP
06+484.00 Kanan 3.00 3.00 9.00 Holding LPA
61
06+487.00 Full 4.00 6.00 24.00 Holding LPA
62 06+505.00 Kanan 11.00 3.00 33.00 Holding CAP
06+519.00 Kanan 20.00 2.40 48.00 Holding CAP
63
06+539.00 Full 25.00 6.00 150.00 Holding LPA
06+590.00 Kanan 26.00 3.00 78.00 Holding CAP
06+616.00 Full 20.00 6.00 120.00 Holding LPA
64
06+636.00 Kanan 26.00 3.00 78.00 Holding LPA
06+662.00 Full 20.00 6.00 120.00 Holding LPA
06+712.00 Kanan 5.00 3.00 15.00 Holding CAP
65
06+717.00 Full 7.00 6.00 42.00 Holding CAP
66 06+732.00 Full 20.00 6.00 120.00 Holding LPA
06+852.00 Kanan 18.00 3.00 54.00 Holding LPA
67
06+870.00 Kanan 6.00 2.40 14.40 Holding LPA
06+880.00 Kanan 7.00 2.80 19.60 Holding
68
06+887.00 Kanan 4.00 2.40 9.60 Holding
69 06+895.00 Kanan 3.00 2.40 7.20 Holding CAP
70 06+925.00 Kanan 10.00 2.40 24.00 Holding
71 06+959.00 Kanan 9.00 3.20 28.80 Holding LPA
72 06+998.00 Kanan 5.00 2.40 12.00 Holding CAP
73 07+043.00 Full 14.00 6.00 84.00 Holding LPA
07+066.00 Full 30.00 6.00 180.00 Holding LPA
74
07+096.00 Kanan 16.00 2.40 38.40 Holding LPA
76 07+381.00 Kanan 6.00 2.40 14.40 Holding CAP
77 07+425.00 Kiri 4.00 2.50 10.00 Holding CAP
78 07+433.00 Kanan 9.00 3.00 27.00 Holding LPA
79 07+451.00 Kanan 7.00 2.40 16.80 Holding CAP
80 07+641.00 Kanan 6.00 2.40 14.40 Holding LPA
81 07+750.00 Full 10.00 6.00 60.00 Holding LPA
82 07+800.00 Kanan 10.00 3.00 30.00 Holding CAP
83 07+874.00 Full 18.00 6.00 108.00 Holding LPA
84 07+925.00 Kanan 13.00 2.50 32.50 Holding
85 07+942.00 Tengah 3.00 2.40 7.20 Holding LPA
86 08+044.00 Full 19.00 6.00 114.00 Holding CAP
87 08+373.00 Kanan 16.00 2.50 40.00 Holding LPA
08+402.00 Kanan 17.00 3.00 51.00 Holding LPA
88
08+419.00 Full 16.00 6.00 96.00 Holding LPA
89 08+498.00 Kanan 19.00 3.00 57.00 Holding CAP
08+525.00 Kanan 6.00 2.40 14.40 Holding LPA
90
08+531.00 Kanan 12.00 3.00 36.00 Holding LPA
91 08+549.00 Kiri 8.00 2.40 19.20 Holding CAP
92 08+564.00 Full 10.00 6.00 60.00 Holding LPA
93 08+585.00 Kanan 5.00 3.00 15.00 Holding LPA
94 08+599.00 Tengah 4.00 2.40 9.60 Holding CAP
95 08+643.00 Kanan 5.00 3.00 15.00 Holding LPA
96 08+690.00 Kanan 10.00 2.40 24.00 Holding CAP
97 08+733.00 Kanan 14.00 4.00 56.00 Holding LPA
98 08+778.00 Kanan 14.00 2.50 35.00 Holding LPA
99 08+813.00 Kanan 8.00 2.40 19.20 Holding
100 08+823.00 Kiri 3.00 2.40 7.20 Holding CAP
101 08+876.00 Kanan 20.00 2.40 48.00 Holding LPA
102 08+960.00 Kanan 17.00 1.50 25.50 Holding CAP
103 09+010.00 Kanan 8.00 2.40 19.20 Holding LPA
104 09+427.00 Kanan 4.00 3.00 12.00 Holding LPA
105 09+760.00 Kanan 7.00 2.40 16.80 Holding LPA
106 09+798.00 Kanan 5.00 2.40 12.00 Holding LPA
107 09+813.00 Kanan 6.00 2.40 14.40 Holding CAP
108 10+066.00 Kanan 9.00 3.00 27.00 Holding LPA
109 10+267.00 Kanan 7.00 2.40 16.80 Holding LPA
110 10+375.00 Kanan 5.00 2.40 12.00 Holding LPA
111 10+514.00 Kanan 5.00 1.50 7.50 Holding CAP
112 10+630.00 Kanan 6.00 3.00 18.00 Holding LPA
113 10+840.00 Kanan 8.00 3.50 28.00 Holding LPA

114 10+914.00 Kanan 6.00 2.50 15.00 Holding LPA


115 11+077.00 Kanan 4.00 2.50 10.00 Holding LPA
116 11+095.00 Kanan 7.00 3.20 22.40 Holding LPA
117 11+105.00 Kanan 5.00 3.00 15.00 Holding LPA
118 11+290.00 Kanan 6.00 2.40 14.40 Holding LPA
119 11+430.00 Kanan 6.00 2.40 14.40 Holding LPA
11+437.00 Kiri 12.00 2.40 28.80 Holding CAP
120
11+449.00 Kiri 7.00 3.50 24.50 Holding LPA
121 11+730.00 Kanan 13.00 2.40 31.20 Holding LPA
122 11+808.00 Full 15.00 6.00 90.00 Holding LPA
123 11+921.00 Kanan 18.00 2.50 45.00 Holding CAP
124 11+954.00 Kanan 17.00 3.00 51.00 Holding LPA
12+000.00
125 12+012.00 Kanan 9.00 2.50 22.50 Rutin Jalan
126 12+035.00 Kanan 6.00 2.40 14.40 Rutin Jalan LPA
127 12+089.00 Kanan 11.00 2.40 26.40 Rutin Jalan CAP
128 12+130.00 Kanan 14.00 3.00 42.00 Rutin Jalan
129 12+169.00 Kanan 16.00 3.00 48.00 Rutin Jalan
130 12+213.00 Kanan 14.00 3.00 42.00 Rutin Jalan
131 12+235.00 Kanan 13.00 2.00 26.00 Rutin Jalan CAP
132 12+271.00 Kanan 8.00 3.00 24.00 Rutin Jalan LPA
133 12+287.00 Kiri 5.00 3.00 15.00 Rutin Jalan CAP
134 12+688.00 Kanan 14.00 3.00 42.00 Rutin Jalan CAP
12+900.00
135 13+060.00 Kanan 5.00 3.00 15.00 Rutin Kondisi LPA
136 13+240.00 Full 26.00 6.00 156.00 Rutin Kondisi CAP
137 13+266.00 Full 33.75 6.00 202.50 Rutin Kondisi LPA
138 13+607.00 Kanan 13.00 2.40 31.20 Rutin Kondisi LPA
139 13+620.00 Kiri 7.00 2.97 20.80 Rutin Kondisi CAP
140 13+743.00 Kanan 7.00 3.00 21.00 Rutin Kondisi LPA
141 13+858.00 Kanan 5.00 2.40 12.00 Rutin Kondisi LPA
13+917.00 Full 30.00 6.00 180.00 Rutin Kondisi LPA
142
13+947.00 Kanan 13.00 3.00 39.00 Rutin Kondisi LPA
14+140.00
143 14+193.00 Full 12.00 6.00 72.00 Rutin Jalan LPA
144 14+210.00 Kanan 3.00 2.40 7.20 Rutin Jalan CAP
145 14+245.00 Kanan 7.00 3.00 21.00 Rutin Jalan CAP
146 14+811.00 Kanan 8.00 2.40 19.20 Rutin Jalan LPA
147 14+850.00 Kanan 8.00 2.40 19.20 Rutin Jalan LPA
148 14+928.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
149 15+400.00 Kanan 6.00 2.40 14.40 Rutin Jalan LPA
150 15+487.00 Kanan 5.00 2.40 12.00 Rutin Jalan LPA
151 15+513.00 Tengah 3.00 1.50 4.50 Rutin Jalan CAP
152 15+570.00 Kanan 12.00 3.00 36.00 Rutin Jalan LPA
15+608.00 Full 11.00 6.00 66.00 Rutin Jalan LPA
153
15+619.00 Kiri 14.00 3.00 42.00 Rutin Jalan LPA
154 15+638.00 Tengah 19.00 2.00 38.00 Rutin Jalan CAP
155 16+499.00 Full 75.00 6.00 450.00 Rutin Jalan LPA
156 16+599.00 Kiri 10.00 2.40 24.00 Rutin Jalan CAP
157 16+609.00 Full 11.00 6.00 66.00 Rutin Jalan CAP
16+640.00 Full 20.00 6.00 120.00 Rutin Jalan LPA
158
16+660.00 Kanan 16.00 3.00 48.00 Rutin Jalan LPA
16+698.00 Full 80.00 6.00 480.00 Rutin Jalan LPA
159
16+778.00 Kanan 12.00 3.00 36.00 Rutin Jalan LPA
160 16+717.00 Kanan 10.00 3.00 30.00 Rutin Jalan LPA
161 16+737.00 Kanan 15.00 3.00 45.00 Rutin Jalan LPA
16+757.00 Kanan 12.00 3.00 36.00 Rutin Jalan LPA
162
16+769.00 Full 13.00 6.00 78.00 Rutin Jalan LPA
163 16+786.00 Kanan 17.00 3.00 51.00 Rutin Jalan LPA
164 16+980.00 Kanan 42.00 4.00 168.00 Rutin Jalan CAP
165 17+036.00 Kanan 20.00 3.50 70.00 Rutin Jalan
166 17+092.00 Kanan 3.00 2.40 7.20 Rutin Jalan CAP
167 17+143.00 Full 28.00 6.00 168.00 Rutin Jalan
168 17+184.00 Tengah 10.00 2.50 25.00 Rutin Jalan CAP
169 17+195.00 Kiri 9.00 3.00 27.00 Rutin Jalan
17+207.00 Kiri 25.00 3.00 75.00 Rutin Jalan CAP
170
17+207.00 Kanan 20.00 3.00 60.00 Rutin Jalan
17+250.00 Kiri 14.00 3.00 42.00 Rutin Jalan CAP
171
17+250.00 Kanan 14.00 3.00 42.00 Rutin Jalan LPA

17+273.00 Full 8.00 6.00 48.00 Rutin Jalan LPA


172
17+281.00 Kanan 5.00 3.00 15.00 Rutin Jalan
173 17+294.00 Kiri 5.00 2.00 10.00 Rutin Jalan CAP
174 17+303.00 Tengah 17.00 2.00 34.00 Rutin Jalan CAP
175 17+323.00 Kanan 36.00 3.00 108.00 Rutin Jalan CAP
17+362.00 Full 20.00 6.00 120.00 Rutin Jalan
176
17+382.00 Kanan 15.00 3.00 45.00 Rutin Jalan
177 17+404.00 Kiri 13.00 2.00 26.00 Rutin Jalan CAP
178 17+428.00 Kanan 29.00 2.40 69.60 Rutin Jalan
179 17+500.00 Kiri 4.00 3.00 12.00 Rutin Jalan CAP
180 17+508.00 Kanan 9.00 3.00 27.00 Rutin Jalan LPA
17+524.00 Full 12.00 6.00 72.00 Rutin Jalan LPA
181
17+536.00 Tengah 9.00 2.40 21.60 Rutin Jalan
182 17+611.00 Kanan 5.00 2.40 12.00 Rutin Jalan CAP
183 17+622.00 Kanan 11.00 2.40 26.40 Rutin Jalan
184 17+640.00 Kanan 18.00 2.40 43.20 Rutin Jalan
185 17+700.00 Tengah 12.00 3.00 36.00 Rutin Jalan CAP
186 17+716.00 Kiri 10.00 2.40 24.00 Rutin Jalan LPA
187 17+734.00 Full 30.00 6.00 180.00 Rutin Jalan LPA
188 17+823.00 Kanan 5.00 2.40 12.00 Rutin Jalan
189 18+650.00 Kanan 8.00 2.00 16.00 Rutin Jalan CAP
190 19+602.00 Kanan 3.00 2.50 7.50 Rutin Jalan CAP
191 19+750.00 Tengah 5.00 2.00 10.00 Rutin Jalan CAP
192 19+770.00 Kanan 9.00 1.50 13.50 Rutin Jalan CAP
193 19+803.00 Kanan 10.00 1.50 15.00 Rutin Jalan CAP
194 19+879.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
195 19+902.00 Kanan 15.00 3.00 45.00 Rutin Jalan
196 19+965.00 Tengah 33.00 2.40 79.20 Rutin Jalan CAP
197 20+010.00 Kanan 6.00 3.20 19.20 Rutin Jalan CAP
198 20+036.00 Kanan 8.00 1.50 12.00 Rutin Jalan CAP
199 20+056.00 Kiri 5.00 1.50 7.50 Rutin Jalan CAP
200 20+125.00 Kanan 17.00 2.00 34.00 Rutin Jalan CAP
201 20+223.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
202 20+318.00 Kanan 12.00 3.00 36.00 Rutin Jalan CAP
203 20+370.00 Kiri 15.00 2.00 30.00 Rutin Jalan
204 20+413.00 Kiri 7.00 1.50 10.50 Rutin Jalan CAP
205 20+510.00 Kanan 10.00 2.00 20.00 Rutin Jalan CAP
206 20+565.00 Kanan 8.00 3.00 24.00 Rutin Jalan
207 20+577.00 Tengah 6.00 1.50 9.00 Rutin Jalan CAP
208 20+588.00 Kanan 9.00 2.40 21.60 Rutin Jalan
209 20+613.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
210 20+717.00 Kanan 12.00 1.50 18.00 Rutin Jalan CAP
211 20+763.00 Full 14.00 6.00 84.00 Rutin Jalan LPA
212 20+841.00 Full 8.00 6.00 48.00 Rutin Jalan LPA
213 21+013.00 Kanan 5.00 3.00 15.00 Rutin Jalan CAP
214 21+044.00 Kanan 8.00 3.00 24.00 Rutin Jalan CAP
215 21+323.00 Kanan 6.00 1.50 9.00 Rutin Jalan CAP
21+414.00

Total Yang Tidak Tertangani 5,535.00


Total Rutin Jalan 866.40
Total Rutin Kondisi 302.50
Total Holding 4,826.20
DATA SURVEY
RUAS JALAN KUJAN - RUNTU

Panjang Lebar Luas Rutin Rutin


No. STA. Posisi Holding Lingkup Ket.
(M) (M) (M2) Jalan Kondisi

1 02+338.00 Full 22.00 6.00 132.00 Rutin Kondisi CAP


2 02+388.00 Kiri 10.00 2.50 25.00 Rutin Kondisi CAP
3 02+407.00 Kiri 3.00 1.00 3.00 Rutin Kondisi CAP
4 02+412.00 Kiri 5.00 3.00 15.00 Rutin Kondisi CAP
5 01+417.00 Kanan 6.00 3.00 18.00 Rutin Kondisi CAP
6 02+438.00 Kanan 12.00 3.00 36.00 Rutin Kondisi CAP
02+460.00 Full 7.00 6.00 42.00 Rutin Kondisi CAP
7
02+467.00 Kiri 6.00 3.00 18.00 Rutin Kondisi CAP
8 02+491.00 Kanan 5.00 2.00 10.00 Rutin Kondisi CAP
9 02+548.00 Full 10.00 6.00 60.00 Rutin Kondisi LPA
10 02+680.00 Kanan 11.00 3.00 33.00 Rutin Kondisi LPA
11 02+816.00 Kanan 17.00 3.50 59.50 Rutin Kondisi LPA
12 02+921.00 Full 5.00 6.00 30.00 Rutin Kondisi CAP
13 02+931.00 Full 6.00 6.00 36.00 Rutin Kondisi CAP
14 02+987.00 Kanan 11.00 3.50 38.50 Rutin Kondisi LPA
15 03+531.00 Full 37.00 6.00 222.00 Rutin Kondisi CAP
16 03+630.00 Kiri 8.00 2.00 16.00 Rutin Kondisi CAP
17 03+725.00 Kanan 5.00 2.40 12.00 Rutin Kondisi LPA
18 03+790.00 Full 13.00 6.00 78.00 Rutin Kondisi LPA
19 03+934.00 Kanan 7.00 2.50 17.50 Rutin Kondisi LPA
20 03+984.00 Kanan 5.00 2.50 12.50 Rutin Kondisi LPA
21 04+002.00 Kiri 6.00 3.00 18.00 Rutin Kondisi CAP
22 04+022.00 Full 14.00 6.00 84.00 Rutin Kondisi CAP
23 04+108.00 Kiri 3.00 1.50 4.50 Rutin Kondisi CAP
24 04+113.00 Tengah 3.00 1.00 3.00 Rutin Kondisi CAP
04+165.00 Kiri 54.00 3.00 162.00 Rutin Kondisi CAP
25
04+165.00 Kanan 54.00 3.00 162.00 Rutin Kondisi LPA
26 04+245.00 Kiri 8.00 1.50 12.00 Rutin Kondisi CAP
27 04+531.00 Kiri 9.00 2.50 22.50 Rutin Kondisi LPA
04+604.00 Kanan 33.00 3.00 99.00 Rutin Kondisi LPA
28
04+637.00 Full 34.00 6.00 204.00 Rutin Kondisi LPA
29 04+689.00 Kiri 8.00 1.50 12.00 Rutin Kondisi CAP
30 05+430.00 Kanan 12.00 2.50 30.00 Rutin Kondisi LPA
31 06+090.00 Kanan 5.00 2.00 10.00 Rutin Kondisi LPA
32 06+359.00 Kanan 19.00 1.50 28.50 Rutin Kondisi CAP
33 06+537.00 Full 20.00 6.00 120.00 Rutin Kondisi CAP
34 06+702.00 Kanan 4.00 2.50 10.00 Rutin Kondisi CAP
35 06+744.00 Kanan 3.00 1.50 4.50 Rutin Kondisi CAP
36 06+898.00 Tengah 9.00 1.50 13.50 Rutin Kondisi CAP
37 06+925.00 Kanan 3.00 1.00 3.00 Rutin Kondisi CAP
06+980.00
38 06+990.00 Full 10.00 6.00 Rekonstruksi
39 07+008.00 Kanan 10.00 3.00 Rekonstruksi
40 07+089.00 Tengah 6.00 2.00 Rekonstruksi
07+900.00
41 08+380.00 Tengah 21.00 2.00 42.00 Rutin Jalan CAP
42 08+424.00 Tengah 10.00 2.00 20.00 Rutin Jalan CAP
08+434.00 Kanan 6.00 2.40 14.40 Rutin Jalan LPA
43
08+440.00 Kanan 10.00 4.00 40.00 Rutin Jalan LPA
44 08+475.00 Kanan 53.00 3.00 159.00 Rutin Jalan CAP
45 08+483.00 Kiri 3.00 1.50 4.50 Rutin Jalan CAP
46 08+540.00 Tengah 4.00 1.50 6.00 Rutin Jalan CAP
08+544.00 Kanan 13.00 3.50 45.50 Rutin Jalan LPA
47
08+557.00 Full 26.00 6.00 156.00 Rutin Jalan CAP
48 08+583.00 Full 25.00 6.00 150.00 Rutin Jalan LPA
49 08+630.00 Full 17.00 6.00 102.00 Rutin Jalan CAP
50 08+668.00 Kanan 5.00 2.50 12.50 Rutin Jalan LPA
51 08+685.00 Kanan 5.00 2.50 12.50 Rutin Jalan LPA
08+728.00 Kanan 30.00 3.50 105.00 Rutin Jalan LPA
52
08+758.00 Kanan 15.00 3.00 45.00 Rutin Jalan CAP
53 08+774.00 Tengah 3.00 2.50 7.50 Rutin Jalan LPA
54 08+788.00 Kanan 5.00 2.40 12.00 Rutin Jalan LPA
55 08+804.00 Kanan 5.00 2.50 12.50 Rutin Jalan LPA
56 08+831.00 Kiri 22.00 3.50 77.00 Rutin Jalan LPA
08+900.00
Rekonstruksi
10+475.00

57 10+718.00 Kanan 20.00 3.00 60.00 Rutin Jalan CAP


10+739.00 Kiri 19.00 2.40 45.60 Rutin Jalan LPA
58
10+758.00 Full 12.00 6.00 72.00 Rutin Jalan LPA
59 10+786.00 Full 53.00 6.00 318.00 Rutin Jalan LPA
60 10+850.00 Kanan 25.00 2.40 60.00 Rutin Jalan LPA
61 10+887.00 Kanan 11.00 2.40 26.40 Rutin Jalan LPA
62 10+912.00 Kanan 6.00 2.40 14.40 Rutin Jalan LPA
63 10+924.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
64 10+955.00 Full 25.00 6.00 150.00 Rutin Jalan LPA
65 10+990.00 Tengah 7.00 2.00 14.00 Rutin Jalan CAP
66 11+070.00 Kanan 19.00 3.00 57.00 Rutin Jalan LPA
67 11+083.00 Kiri 4.00 2.40 9.60 Rutin Jalan LPA
68 11+100.00 Kiri 19.00 3.00 57.00 Rutin Jalan CAP
69 11+153.00 Kanan 5.00 2.40 12.00 Rutin Jalan LPA
70 11+172.00 Kanan 29.00 2.40 69.60 Rutin Jalan LPA
71 11+220.00 Kiri 7.00 2.40 16.80 Rutin Jalan LPA
72 11+227.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
73 11+252.00 Kiri 19.00 1.50 28.50 Rutin Jalan CAP
74 11+323.00 Kanan 5.00 2.40 12.00 Rutin Jalan LPA
75 11+460.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
76 11+522.00 Kanan 9.00 2.40 21.60 Rutin Jalan LPA
77 11+536.00 Kanan 10.00 1.50 15.00 Rutin Jalan CAP
78 11+559.00 Kanan 3.00 2.40 7.20 Rutin Jalan LPA
79 11+700.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
80 11+713.00 Kanan 21.00 2.00 42.00 Rutin Jalan CAP
81 11+742.00 Kanan 17.00 2.40 40.80 Rutin Jalan LPA
82 11+759.00 Full 9.00 6.00 54.00 Rutin Jalan LPA
83 11+770.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
84 11+800.00 Full 60.00 6.00 360.00 Rutin Jalan LPA
85 12+000.00 Kiri 4.00 3.00 12.00 Rutin Jalan LPA
86 12+035.00 Kiri 28.00 3.00 84.00 Rutin Jalan CAP
87 12+123.00 Full 29.00 6.00 Rutin Jalan CAP
88 12+227.00 Full 9.00 6.00 54.00 Rutin Jalan LPA
13+185.00 Kanan 31.00 3.00 93.00 Rutin Jalan CAP
89
13+216.00 Full 42.00 6.00 252.00 Rutin Jalan CAP
90 13+262.00 Kanan 10.00 2.00 20.00 Rutin Jalan CAP
13+353.00 Kanan 29.00 3.00 87.00 Rutin Jalan CAP
91
13+382.00 Full 17.00 6.00 102.00 Rutin Jalan CAP
92 13+426.00 Kanan 16.00 3.00 48.00 Rutin Jalan CAP
93 13+473.00 Kanan 42.00 3.00 126.00 Rutin Jalan CAP
94 13+526.00 Kanan 9.00 2.00 18.00 Rutin Jalan CAP
95 13+607.00 Kanan 1.50 1.50 2.25 Rutin Jalan CAP
96 13+812.00 Kanan 12.00 3.00 36.00 Rutin Jalan CAP
97 13+853.00 Kanan 4.00 2.00 8.00 Rutin Jalan CAP
98 13+892.00 Kanan 29.00 2.50 72.50 Rutin Jalan CAP
99 13+932.00 Kanan 4.00 1.50 6.00 Rutin Jalan CAP
100 13+964.00 Kanan 21.00 2.00 42.00 Rutin Jalan CAP
101 14+010.00 Kanan 17.00 2.50 42.50 Rutin Jalan CAP
102 14+028.00 Kiri 22.00 3.00 66.00 Rutin Jalan CAP
103 14+195.00 Kanan 6.00 1.50 9.00 Rutin Jalan CAP
14+210.00 Kanan 97.00 3.00 291.00 Rutin Jalan CAP
104
14+307.00 Full 15.00 6.00 90.00 Rutin Jalan CAP
105 14+326.00 Full 58.00 6.00 348.00 Rutin Jalan CAP
106 14+394.00 Full 42.00 6.00 252.00 Rutin Jalan CAP
14+441.00 Full 61.00 6.00 366.00 Rutin Jalan CAP
107
14+502.00 Kanan 16.00 3.00 48.00 Rutin Jalan CAP
108 14+526.00 Kanan 15.00 3.00 45.00 Rutin Jalan CAP
109 14+553.00 Kanan 7.00 3.00 21.00 Rutin Jalan CAP
110 14+563.00 Full 30.00 6.00 180.00 Rutin Jalan CAP
111 14+735.00 Full 38.00 6.00 228.00 Rutin Jalan CAP
112 15+169.00 Kanan 12.00 2.00 24.00 Rutin Jalan LPA
113 15+378.00 Kanan 7.00 2.50 17.50 Rutin Jalan LPA
114 15+530.00 Kanan 7.00 3.00 21.00 Rutin Jalan LPA
115 15+800.00 Kanan 7.00 2.50 17.50 Rutin Jalan LPA
116 15+830.00 Kanan 4.00 2.50 10.00 Rutin Jalan LPA
117 15+890.00 Full 2.00 3.00 6.00 Rutin Jalan CAP
118 15+931.00 Kanan 8.00 6.00 48.00 Rutin Jalan LPA
119 16+030.00 Full 14.00 3.00 42.00 Rutin Jalan CAP
120 16+092.00 Kanan 21.00 6.00 126.00 Rutin Jalan LPA

121 16+135.00 Kiri 6.00 2.00 12.00 Rutin Jalan LPA


122 16+158.00 Kanan 4.00 1.50 6.00 Rutin Jalan CAP
123 16+189.00 Kanan 9.00 3.00 27.00 Rutin Jalan CAP
122.B 16+206.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
122.C 16+220.00 Kanan 9.00 2.50 22.50 Rutin Jalan CAP
122.D 16+234.00 Kanan 22.00 2.50 55.00 Rutin Jalan CAP
124 16+415.00 Kanan 5.00 2.00 10.00 Rutin Jalan CAP
125 16+429.00 Kanan 9.00 3.00 27.00 Rutin Jalan LPA
126 16+515.00 Kanan 9.00 1.50 13.50 Rutin Jalan LPA
127 16+530.00 Kanan 3.00 1.50 4.50 Rutin Jalan CAP
128 16+616.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
129 16+705.00 Kanan 5.00 2.50 12.50 Rutin Jalan LPA
130 16+720.00 Kanan 14.00 2.50 35.00 Rutin Jalan LPA
131 16+750.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
132 16+766.00 Full 11.00 6.00 66.00 Rutin Jalan CAP
133 16+793.00 Full 12.00 6.00 72.00 Rutin Jalan CAP
134 16+815.00 Kanan 6.00 3.00 18.00 Rutin Jalan CAP
135 16+863.00 Tengah 21.00 2.00 42.00 Rutin Jalan CAP
16+940.00
16+946.00 Kiri 14.00 3.00 Rekonstruksi
136
16+960.00 Full 22.00 6.00 Rekonstruksi
137 16+991.00 Full 42.00 6.00 Rekonstruksi
138 17+080.00 Kanan 8.00 2.00 Rekonstruksi
139 17+098.00 Kiri 14.00 2.50 Rekonstruksi
140 17+109.00 Kanan 4.00 1.50 Rekonstruksi
141 17+123.00 Kanan 7.00 1.50 Rekonstruksi
142 17+154.00 Kanan 5.00 2.50 Rekonstruksi
143 17+167.00 Kanan 3.00 2.00 Rekonstruksi
144 17+178.00 Full 22.00 6.00 Rekonstruksi
145 17+254.00 Kanan 19.00 3.00 Rekonstruksi
146 17+281.00 Kanan 8.00 3.00 Rekonstruksi
147 17+306.00 Kanan 6.00 2.50 Rekonstruksi
148 17+330.00 Kanan 2.00 2.50 Rekonstruksi
149 17+351.00 Kanan 9.00 2.00 Rekonstruksi
17+360.00
17+400.00 Full 7.00 6.00 42.00 Rutin Jalan LPA
150
17+407.00 Kanan 19.00 3.00 57.00 Rutin Jalan LPA
151 17+451.00 Full 21.00 6.00 126.00 Rutin Jalan CAP
152 17+484.00 Kanan 4.00 1.50 6.00 Rutin Jalan CAP
153 17+516.00 Full 33.00 6.00 198.00 Rutin Jalan CAP
154 17+562.00 Kanan 6.00 2.50 15.00 Rutin Jalan CAP
155 17+578.00 Kanan 22.00 2.00 44.00 Rutin Jalan CAP
156 17+618.00 Kanan 8.00 1.00 8.00 Rutin Jalan CAP
157 17+685.00 Kanan 5.00 2.00 10.00 Rutin Jalan CAP
158 17+822.00 Full 6.00 6.00 36.00 Rutin Jalan LPA
159 17+860.00 Kanan 5.00 2.00 10.00 Rutin Jalan CAP
160 17+877.00 Kiri 3.00 1.00 3.00 Rutin Jalan CAP
161 18+220.00 Kiri 4.00 2.50 10.00 Rutin Jalan LPA
162 18+256.00 Kanan 29.00 3.00 87.00 Rutin Jalan CAP
18+350.00
163 18+382.00 Kanan 7.00 3.00 21.00 Holding CAP
164 18+415.00 Kanan 8.00 3.00 24.00 Holding CAP
18+447.00 Kanan 22.00 3.00 66.00 Holding CAP
165
18+469.00 Full 31.00 6.00 186.00 Holding CAP
166 18+656.00 Kanan 6.00 2.00 12.00 Holding CAP
167 18+698.00 Kanan 8.00 2.50 20.00 Holding CAP
168 18+893.00 Kanan 14.00 3.00 42.00 Holding LPA
169 18+934.00 Kanan 5.00 2.50 12.50 Holding LPA
170 18+936.00 Kiri 17.00 2.00 34.00 Holding CAP
171 19+017.00 Kanan 4.00 2.00 8.00 Holding CAP
19+031.00 Kanan 11.00 3.00 33.00 Holding CAP
172
19+042.00 Full 18.00 6.00 108.00 Holding CAP
173 19+100.00 Kanan 11.00 2.00 22.00 Holding CAP
174 19+120.00 Kanan 8.00 1.50 12.00 Holding CAP
175 19+240.00 Kanan 11.00 3.00 33.00 Holding CAP
176 19+292.00 Kanan 7.00 2.00 14.00 Holding CAP
177 19+439.00 Full 35.00 6.00 210.00 Holding CAP
178 19+544.00 Kanan 3.00 1.50 4.50 Holding CAP
179 19+554.00 Kanan 3.00 3.00 9.00 Holding CAP

180 19+595.00 Kanan 11.00 3.00 33.00 Holding CAP


181 19+649.00 Kanan 7.00 2.00 14.00 Holding CAP
182 19+668.00 Kanan 12.00 2.00 24.00 Holding CAP
183 19+692.00 Kiri 8.00 2.00 16.00 Holding CAP
184 19+752.00 Kiri 4.00 2.50 10.00 Holding CAP
185 19+760.00 Kanan 2.00 3.00 6.00 Holding CAP
186 19+779.00 Kanan 30.00 2.00 60.00 Holding CAP
187 20+607.00 Full 69.00 6.00 414.00 Holding CAP
188 20+700.00 Full 38.00 6.00 228.00 Holding CAP
189 20+806.00 Kanan 10.00 3.00 30.00 Holding LPA
190 21+225.00 Kanan 14.00 3.00 42.00 Holding LPA
191 21+228.00 Kiri 3.00 2.00 6.00 Holding LPA
192 21+264.00 Kanan 3.00 2.00 6.00 Holding CAP
193 21+324.00 Kanan 5.00 2.00 10.00 Holding CAP
194 21+347.00 Kanan 10.00 2.50 25.00 Holding LPA
195 21+375.00 Kiri 7.00 3.00 21.00 Holding CAP
196 21+385.00 Kanan 10.00 2.50 25.00 Holding CAP
197 21+425.00 Kanan 4.00 1.50 6.00 Holding CAP
198 21+433.00 Kanan 20.00 1.50 30.00 Holding CAP
199 21+489.00 Kanan 27.00 3.00 81.00 Holding CAP
200 21+908.00 Kanan 11.00 3.00 33.00 Holding LPA
201 21+911.00 Kiri 3.00 2.00 6.00 Holding CAP
202 22+617.00 Kanan 8.00 3.00 24.00 Holding LPA
203 22+657.00 Kanan 7.00 2.50 17.50 Holding LPA
204 22+718.00 Kanan 11.00 2.50 27.50 Holding LPA
205 22+758.00 Kanan 4.00 2.50 10.00 Holding LPA
206 22+783.00 Kanan 4.00 2.50 10.00 Holding LPA
207 22+828.00 Kanan 7.00 2.50 17.50 Holding LPA
22+914.00 Full 59.00 6.00 354.00 Holding LPA
208
22+973.00 Kanan 11.00 3.00 33.00 Holding LPA
209 22+998.00 Kanan 11.00 2.50 27.50 Holding CAP
210 23+019.00 Kanan 4.00 2.50 10.00 Holding LPA
211 23+043.00 Kanan 7.00 1.50 10.50 Holding CAP
212 23+088.00 Kiri 14.00 1.50 21.00 Holding CAP
213 23+131.00 Kanan 16.00 2.50 40.00 Holding LPA
214 23+159.00 Kanan 8.00 2.50 20.00 Holding LPA
23+185.00 Kanan 12.00 3.00 36.00 Holding LPA
215
23+197.00 Full 9.00 6.00 54.00 Holding LPA
216 23+212.00 Tengah 5.00 2.00 10.00 Holding CAP
217 23+228.00 Kanan 13.00 2.00 26.00 Holding LPA
218 23+310.00 Kiri 4.00 3.00 12.00 Holding LPA
219 23+313.00 Kanan 9.00 2.50 22.50 Holding LPA
23+379.00 Kanan 12.00 3.00 36.00 Holding LPA
220
23+391.00 Full 6.00 6.00 36.00 Holding LPA
221 23+446.00 Kanan 5.00 1.50 7.50 Holding CAP
222 23+460.00 Kanan 20.00 3.00 60.00 Holding CAP
223 23+517.00 Kanan 11.00 3.00 33.00 Holding CAP
224 23+635.00 Kanan 5.00 1.50 7.50 Holding CAP
225 23+647.00 Kanan 41.00 3.00 123.00 Holding CAP
226 23+728.00 Full 11.00 6.00 66.00 Holding CAP
227 23+762.00 Kiri 20.00 3.00 60.00 Holding CAP
228 23+789.00 Full 20.00 6.00 120.00 Holding LPA
229 23+827.00 Full 13.00 6.00 78.00 Holding LPA
230 23+861.00 Kanan 5.00 1.00 5.00 Holding CAP
231 24+125.00 Kanan 5.00 2.00 10.00 Holding LPA
232 24+126.00 Kiri 6.00 3.00 18.00 Holding CAP
233 24+330.00 Kanan 17.00 3.00 51.00 Holding LPA
234 24+376.00 Tengah 6.00 2.00 12.00 Holding CAP
235 24+421.00 Kanan 4.00 1.50 6.00 Holding CAP
236 24+545.00 Kanan 5.00 3.00 15.00 Holding CAP
237 24+582.00 Tengah 4.00 3.00 12.00 Holding CAP
238 24+615.00 Kanan 9.00 3.00 27.00 Holding CAP
239 24+657.00 Kanan 6.00 2.50 15.00 Holding LPA
240 24+818.00 Kanan 4.00 2.00 8.00 Holding CAP
24+880.00
241 24+875.00 Kanan 11.00 3.00 Rekonstruksi
242 24+887.00 Tengah 11.00 2.50 Rekonstruksi
243 24+915.00 Full 20.00 6.00 Rekonstruksi
244 24+955.00 Kanan 8.00 2.50 Rekonstruksi

245 25+008.00 Full 8.00 6.00 Rekonstruksi


246 25+065.00 Kanan 6.00 1.50 Rekonstruksi
247 25+095.00 Kanan 29.00 3.00 Rekonstruksi
248 25+147.00 Kanan 16.00 3.00 Rekonstruksi
249 25+190.00 Kanan 3.00 1.50 Rekonstruksi
250 25+230.00 Kanan 5.00 2.50 Rekonstruksi
251 25+279.00 Kiri 3.00 1.50 Rekonstruksi
252 25+306.00 Kanan 3.00 2.50 Rekonstruksi
253 25+317.00 Kanan 12.00 3.50 Rekonstruksi
254 25+340.00 Kanan 9.00 2.50 Rekonstruksi
255 25+366.00 Kanan 7.00 2.50 Rekonstruksi
256 25+392.00 Full 93.00 6.00 Rekonstruksi
25+478.00
257 25+605.00 Full 15.00 6.00 90.00 Holding LPA
258 25+639.00 Kanan 13.00 3.00 39.00 Holding LPA
259 25+658.00 Kiri 5.00 1.50 7.50 Holding LPA
260 25+671.00 Kanan 3.00 2.00 6.00 Holding LPA
261 25+751.00 Kanan 14.00 3.00 42.00 Holding CAP
262 25+775.00 Kanan 7.00 1.50 10.50 Holding CAP
263 25+793.00 Full 9.00 6.00 54.00 Holding CAP
264 25+860.00 Full 11.00 6.00 66.00 Holding CAP
265 25+926.00 Kiri 13.00 3.50 45.50 Holding CAP
266 25+947.00 Full 35.00 6.00 210.00 Holding CAP
267 25+988.00 Kiri 18.00 3.00 54.00 Holding CAP
268 26+011.00 Full 17.00 6.00 102.00 Holding CAP
269 26+066.00 Kanan 12.00 2.50 30.00 Holding CAP
270 26+137.00 Kanan 4.00 1.50 6.00 Holding CAP
26+340.00 Kanan 7.00 2.00 14.00 Holding LPA
271
26+347.00 Kiri 8.00 4.00 32.00 Holding LPA
272 26+358.00 Kanan 6.00 3.00 18.00 Holding CAP
273 26+389.00 Kanan 4.00 2.50 10.00 Holding CAP
274 26+397.00 Kiri 3.00 1.50 4.50 Holding CAP
275 26+405.00 Kanan 3.00 1.50 4.50 Holding CAP
276 26+452.00 Full 15.00 6.00 90.00 Holding LPA
277 26+494.00 Kanan 6.00 3.00 18.00 Holding LPA
278 26+650.00 Tengah 34.00 1.50 51.00 Holding CAP
279 26+694.00 Tengah 17.00 1.50 25.50 Holding CAP
280 26+707.00 Kanan 15.00 4.00 60.00 Holding LPA
281 26+734.00 Kanan 16.00 4.00 64.00 Holding CAP
282 26+795.00 Tengah 5.00 1.00 5.00 Holding CAP
283 26+883.00 Tengah 7.00 1.50 10.50 Holding CAP
284 26+894.00 Tengah 12.00 1.50 18.00 Holding CAP
285 26+913.00 Kanan 10.00 2.40 24.00 Holding LPA
286 26+944.00 Kanan 9.00 3.00 27.00 Holding LPA
287 26+969.00 Kanan 5.00 2.00 10.00 Holding CAP
288 27+067.00 Kiri 4.00 1.50 6.00 Holding CAP
289 27+073.00 Kiri 2.00 1.50 3.00 Holding CAP
290 27+095.00 Kiri 15.00 4.00 60.00 Holding LPA
291 27+563.00 Tengah 6.00 2.50 15.00 Holding CAP
292 27+570.00 Kanan 8.00 3.00 24.00 Holding CAP
27+588.00 Full 32.00 6.00 192.00 Holding LPA
293
27+620.00 Kanan 13.00 3.00 39.00 Holding LPA
294 27+644.00 Full 13.00 6.00 78.00 Holding LPA
295 27+721.00 Kanan 3.00 4.00 12.00 Holding LPA
296 28+340.00 Kanan 10.00 3.00 30.00 Holding CAP
297 28+351.00 Kiri 5.00 2.40 12.00 Holding LPA
298 28+360.00 Kanan 25.00 3.00 75.00 Holding CAP
299 28+438.00 Full 10.00 6.00 60.00 Holding CAP
300 28+457.00 Full 9.00 6.00 54.00 Holding LPA
301 28+476.00 Full 86.00 6.00 516.00 Holding LPA
302 28+570.00 Kanan 25.00 3.00 75.00 Holding CAP
303 28+600.00 Full 22.00 6.00 132.00 Holding CAP
304 28+644.00 Kanan 12.00 2.00 24.00 Holding CAP
305 28+683.00 Full 9.00 6.00 54.00 Holding CAP
306 28+700.00 Kanan 8.00 4.00 32.00 Holding CAP
307 28+724.00 Full 18.00 6.00 108.00 Holding CAP
308 28+743.00 Kanan 48.00 3.00 144.00 Holding CAP
309 28+799.00 Tengah 5.00 1.50 7.50 Holding CAP
28+829.00 Full 16.00 6.00 96.00 Holding CAP
310
28+845.00 Kiri 27.00 3.00 81.00 Holding CAP

311 28+898.00 Kanan 16.00 1.50 24.00 Holding CAP


312 28+932.00 Tengah 1.50 1.50 2.25 Holding CAP
313 28+957.00 Kanan 16.00 4.00 64.00 Holding CAP
314 28+985.00 Kanan 7.00 3.00 21.00 Holding CAP
315 29+015.00 Kanan 6.00 1.50 9.00 Holding CAP
316 29+081.00 Full 9.00 6.00 54.00 Holding LPA
317 29+980.00 Kanan 7.00 2.40 16.80 Holding LPA
318 29+994.00 Kiri 13.00 1.50 19.50 Holding CAP
319 30+023.00 Kiri 15.00 1.50 22.50 Holding CAP
320 30+083.00 Tengah 5.00 1.50 7.50 Holding CAP
321 30+093.00 Tengah 7.00 2.00 14.00 Holding CAP
322 30+105.00 Tengah 5.00 2.00 10.00 Holding CAP
323 30+350.00 Full 27.00 6.00 162.00 Holding LPA
30+373.00 Kiri 7.00 3.00 21.00 Holding CAP
324
30+380.00 Full 20.00 6.00 120.00 Holding CAP
325 30+425.00 Kanan 7.00 3.00 21.00 Holding LPA
326 30+515.00 Kanan 5.00 3.00 15.00 Holding LPA
327 30+595.00 Kanan 2.00 3.00 6.00 Holding CAP
328 30+840.00 Kanan 13.00 2.50 32.50 Holding CAP
329 30+858.00 Full 17.00 6.00 102.00 Holding LPA
330 30+890.00 Kanan 10.00 3.00 30.00 Holding CAP
331 30+956.00 Kanan 9.00 2.50 22.50 Holding CAP
332 31+075.00 Full 13.00 6.00 78.00 Holding LPA
333 31+200.00 Kanan 6.00 3.00 18.00 Holding CAP
334 31+210.00 Full 16.00 6.00 96.00 Holding LPA
335 31+285.00 Full 8.00 6.00 48.00 Holding LPA
336 31+303.00 Kanan 7.00 4.00 28.00 Holding CAP
337 31+338.00 Tengah 3.00 1.50 4.50 Holding CAP
338 31+346.00 Kanan 6.00 2.50 15.00 Holding LPA
339 31+374.00 Kanan 3.00 2.00 6.00 Holding CAP
340 31+391.00 Kanan 8.00 2.40 19.20 Holding LPA
341 31+408.00 Kanan 3.00 2.50 7.50 Holding LPA
342 31+453.00 Kiri 2.00 1.50 3.00 Holding CAP
343 31+455.00 Kanan 5.00 2.50 12.50 Holding CAP
344 31+474.00 Kanan 3.00 2.50 7.50 Holding CAP
345 31+481.00 Kanan 9.00 2.50 22.50 Holding CAP
31+504.00 Kiri 6.00 3.00 18.00 Holding LPA
346
31+510.00 Full 17.00 6.00 102.00 Holding LPA
347 31+668.00 Kanan 6.00 2.00 12.00 Holding CAP
348 31+682.00 Kanan 5.00 2.50 12.50 Holding LPA
31+754.00 Full 13.00 6.00 78.00 Holding LPA
349
31+767.00 Kanan 11.00 3.00 33.00 Holding LPA
350 31+898.00 Full 3.00 6.00 18.00 Holding CAP
351 31+925.00 Kanan 9.00 2.50 22.50 Holding LPA
352 32+033.00 Tengah 5.00 3.00 15.00 Holding CAP
353 33+081.00 Kanan 3.00 3.00 9.00 Holding CAP
354 33+108.00 Kanan 7.00 2.50 17.50 Holding LPA
355 33+116.00 Kiri 6.00 3.00 18.00 Holding CAP
356 33+250.00 Kanan 7.00 3.00 21.00 Holding LPA
357 33+655.00 Kanan 8.00 2.40 19.20 Holding LPA
358 33+750.00 Kanan 10.00 2.40 24.00 Holding LPA
359 33+766.00 Kanan 12.00 2.40 28.80 Holding LPA
33+810.00 Kanan 13.00 2.50 32.50 Holding LPA
360
360
33+823.00 Full 7.00 6.00 42.00 Holding LPA
361 33+900.00 Kanan 5.00 2.50 12.50 Holding CAP
326 33+915.00 Kanan 13.00 2.00 26.00 Holding CAP
327 33+932.00 Kanan 11.00 2.40 26.40 Holding LPA
328 33+947.00 Kanan 20.00 2.40 48.00 Holding LPA
33+950.00
329 33+973.00 Kanan 9.00 2.40 21.60 Rutin Jalan LPA
33+987.00 Kanan 4.00 2.00 8.00 Rutin Jalan CAP
330
33+991.00 Full 8.00 6.00 48.00 Rutin Jalan CAP
331 34+059.00 Kanan 14.00 3.00 42.00 Rutin Jalan CAP
332 34+090.00 Kanan 10.00 3.00 30.00 Rutin Jalan CAP
333 34+103.00 Kanan 7.00 3.00 21.00 Rutin Jalan LPA
334 34+141.00 Kiri 5.00 2.00 10.00 Rutin Jalan CAP
335 34+181.00 Full 14.00 6.00 84.00 Rutin Jalan CAP
336 34+230.00 Kanan 7.00 2.50 17.50 Rutin Jalan LPA
337 34+313.00 Kanan 26.00 2.50 65.00 Rutin Jalan LPA

338 34+345.00 Full 41.00 6.00 246.00 Rutin Jalan LPA


339 34+433.00 Full 12.00 6.00 72.00 Rutin Jalan LPA
340 34+494.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
341 34+575.00 Kiri 7.00 2.40 16.80 Rutin Jalan LPA
342 34+594.00 Kanan 4.00 2.40 9.60 Rutin Jalan CAP
343 34+622.00 Full 30.00 6.00 180.00 Rutin Jalan LPA
344 34+661.00 Kanan 9.00 2.50 22.50 Rutin Jalan CAP
345 34+666.00 Kiri 3.00 1.50 4.50 Rutin Jalan CAP
346 34+686.00 Kanan 15.00 1.50 22.50 Rutin Jalan CAP
347 34+699.00 Kiri 10.00 1.50 15.00 Rutin Jalan CAP
348 34+730.00 Kanan 4.00 2.00 8.00 Rutin Jalan CAP
349 34+743.00 Kanan 16.00 2.40 38.40 Rutin Jalan LPA
350 34+765.00 Kiri 5.00 3.00 15.00 Rutin Jalan CAP
351 34+774.00 Kanan 12.00 4.00 48.00 Rutin Jalan LPA
352 34+820.00 Tengah 4.00 1.50 6.00 Rutin Jalan CAP
353 34+829.00 Kanan 9.00 3.00 27.00 Rutin Jalan LPA
354 34+849.00 Full 16.00 6.00 96.00 Rutin Jalan LPA
355 34+874.00 Kanan 6.00 2.50 15.00 Rutin Jalan LPA
356 34+893.00 Kanan 7.00 2.00 14.00 Rutin Jalan CAP
357 34+935.00 Kanan 5.00 2.40 12.00 Rutin Jalan LPA
358 34+940.00 Tengah 8.00 1.50 12.00 Rutin Jalan CAP
34+962.00 Kanan 5.00 4.00 20.00 Rutin Jalan LPA
359
34+967.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
360 34+977.00 Kiri 6.00 2.50 15.00 Rutin Jalan LPA
361 34+987.00 Kiri 10.00 2.40 24.00 Rutin Jalan LPA
362 35+000.00 Full 16.00 6.00 96.00 Rutin Jalan LPA
363 35+182.00 Kanan 6.00 1.50 9.00 Rutin Jalan CAP
364 35+196.00 Tengah 6.00 1.50 9.00 Rutin Jalan CAP
365 35+228.00 Kanan 6.00 2.50 15.00 Rutin Jalan LPA
366 35+295.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
367 35+307.00 Kanan 4.00 2.40 9.60 Rutin Jalan LPA
368 35+394.00 Kanan 6.00 2.50 15.00 Rutin Jalan CAP
369 35+437.00 Kanan 11.00 2.00 22.00 Rutin Jalan CAP
370 35+496.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
371 35+535.00 Kiri 5.00 2.40 12.00 Rutin Jalan CAP
372 35+542.00 Kanan 9.00 4.00 36.00 Rutin Jalan CAP
373 35+616.00 Kanan 12.00 2.40 28.80 Rutin Jalan LPA
374 35+634.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
35+646.00 Full 12.00 6.00 72.00 Rutin Jalan CAP
375
35+658.00 Kanan 5.00 3.00 15.00 Rutin Jalan CAP
376 35+676.00 Kanan 15.00 3.00 45.00 Rutin Jalan LPA
377 35+748.00 Kanan 10.00 2.40 24.00 Rutin Jalan LPA
378 35+776.00 Kanan 6.00 2.50 15.00 Rutin Jalan LPA
379 35+790.00 Kanan 3.00 2.50 7.50 Rutin Jalan LPA
380 35+790.00 Kiri 2.00 1.50 3.00 Rutin Jalan CAP
381 35+823.00 Kanan 12.00 3.00 36.00 Rutin Jalan LPA
382 35+840.00 Kanan 8.00 2.40 19.20 Rutin Jalan LPA
383 35+853.00 Kanan 9.00 2.00 18.00 Rutin Jalan CAP
384 35+891.00 Kanan 15.00 3.00 45.00 Rutin Jalan CAP
385 38+098.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
386 38+123.00 Tengah 2.00 2.40 4.80 Rutin Jalan CAP
38+128.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
387
38+134.00 Kanan 5.00 4.00 20.00 Rutin Jalan CAP
388 38+183.00 Kanan 8.00 2.50 20.00 Rutin Jalan CAP
389 38+195.00 Kanan 7.00 3.00 21.00 Rutin Jalan CAP
390 38+218.00 Kanan 22.00 3.50 77.00 Rutin Jalan CAP
391 38+245.00 Kanan 7.00 2.50 17.50 Rutin Jalan CAP
392 38+259.00 Kanan 11.00 2.50 27.50 Rutin Jalan CAP
393 38+353.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
394 38+391.00 Kiri 2.00 2.00 4.00 Rutin Jalan CAP
395 38+398.00 Kiri 9.00 2.00 18.00 Rutin Jalan CAP
396 38+399.00 Kanan 8.00 2.00 16.00 Rutin Jalan CAP
397 38+408.00 Kiri 3.00 2.00 6.00 Rutin Jalan LPA
398 38+413.00 Kiri 4.00 2.00 8.00 Rutin Jalan CAP
399 38+460.00 Kanan 2.00 1.50 3.00 Rutin Jalan CAP
400 38+842.00 Kanan 11.00 2.00 22.00 Rutin Jalan LPA
401 38+940.00 Kanan 6.00 2.50 15.00 Rutin Jalan LPA
402 38+985.00 Kanan 9.00 2.50 22.50 Rutin Jalan LPA
403 39+033.00 Kiri 6.00 3.50 21.00 Rutin Jalan LPA

404 39+050.00 Kanan 6.00 3.00 18.00 Rutin Jalan LPA


405 39+056.00 Kiri 5.00 1.50 7.50 Rutin Jalan LPA
406 39+060.00 Kanan 2.00 2.00 4.00 Rutin Jalan CAP
407 39+094.00 Kanan 4.00 2.50 10.00 Rutin Jalan LPA
408 39+101.00 Full 35.00 6.00 210.00 Rutin Jalan LPA
409 39+325.00 Full 33.00 6.00 198.00 Rutin Jalan LPA
410 39+390.00 Kanan 12.00 2.50 30.00 Rutin Jalan LPA
411 39+535.00 Kiri 4.00 2.00 8.00 Rutin Jalan LPA
412 39+910.00 Kanan 5.00 3.00 15.00 Rutin Jalan LPA
413 40+006.00 Kanan 10.00 3.00 30.00 Rutin Jalan LPA
414 40+049.00 Kanan 5.00 3.00 15.00 Rutin Jalan LPA
415 40+085.00 Kanan 24.00 3.00 72.00 Rutin Jalan LPA
416 40+118.00 Kanan 14.00 3.00 42.00 Rutin Jalan LPA
417 40+144.00 Kanan 2.00 1.00 2.00 Rutin Jalan CAP
418 40+152.00 Kanan 3.00 2.00 6.00 Rutin Jalan LPA
419 40+166.00 Kanan 8.00 2.50 20.00 Rutin Jalan LPA
40+203.00 Kanan 12.00 3.00 36.00 Rutin Jalan LPA
420
40+215.00 Full 6.00 6.00 36.00 Rutin Jalan LPA
421 40+226.00 Kanan 4.00 2.50 10.00 Rutin Jalan CAP
422 40+711.00 Kanan 9.00 3.00 27.00 Rutin Jalan LPA
423 40+722.00 Kiri 6.00 3.50 21.00 Rutin Jalan LPA
424 40+825.00 Full 10.00 6.00 60.00 Rutin Jalan LPA
425 40+865.00 Kanan 9.00 3.00 27.00 Rutin Jalan LPA
426 40+953.00 Kanan 8.00 3.00 24.00 Rutin Jalan LPA
427 41+043.00 Kanan 10.00 2.00 20.00 Rutin Jalan LPA
428 41+127.00 Kanan 10.00 3.00 30.00 Rutin Jalan LPA
429 41+143.00 Full 20.00 6.00 120.00 Rutin Jalan LPA
430 41+325.00 Kanan 6.00 3.00 18.00 Rutin Jalan LPA
431 41+352.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
432 42+075.00 Full 14.00 6.00 84.00 Rutin Jalan CAP
433 42+302.00 Kanan 7.00 2.00 14.00 Rutin Jalan LPA
434 42+334.00 Kiri 6.00 3.00 18.00 Rutin Jalan CAP

Total Yang Tidak Tertangani 7,969.90


Total Rutin Jalan -
Total Rutin Kondisi 1,637.00
Total Holding 11,503.70
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 195,653,559.61 195,653,559.61 1.00 195,653,559.61
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 96,847,636.36 96,847,636.36 1.00 96,847,636.36
1.17.(1a) Pengujian pH Buah 3.00 198,000.00 594,000.00 3.00 594,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 3.00 225,000.00 675,000.00 3.00 675,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 3.00 216,000.00 648,000.00 3.00 648,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 3.00 216,000.00 648,000.00 3.00 648,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 3.00 225,000.00 675,000.00 3.00 675,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 3.00 288,000.00 864,000.00 3.00 864,000.00
1.17.(1g) Pengujian Coliform Buah 3.00 378,000.00 1,134,000.00 3.00 1,134,000.00
1.17.(1h) Pengujian E. Coli Buah 3.00 306,000.00 918,000.00 3.00 918,000.00
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 3.00 441,000.00 1,323,000.00 3.00 1,323,000.00
1.17.(1j) Pengujian Temperatur (Suhu) Buah 3.00 198,000.00 594,000.00 3.00 594,000.00
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 3.00 684,000.00 2,052,000.00 3.00 2,052,000.00
1.17.(2b) Pengujian Tingkat Getaran Kendaraan Bermotor Buah 3.00 855,000.00 2,565,000.00 3.00 2,565,000.00
1.17.(3a) Pengujian NoX Buah 3.00 387,000.00 1,161,000.00 3.00 1,161,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 3.00 468,000.00 1,404,000.00 3.00 1,404,000.00
1.17.(3c) Pengujian Karbondioksida (CO2) Buah 3.00 504,000.00 1,512,000.00 3.00 1,512,000.00
1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 3.00 486,000.00 1,458,000.00 3.00 1,458,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 3.00 468,000.00 1,404,000.00 3.00 1,404,000.00
1.17.(3g) Pengujian Timah Hitam (Pb) Buah 3.00 450,000.00 1,350,000.00 3.00 1,350,000.00
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 122,170,000.00 122,170,000.00 1.00 122,170,000.00
1.21 Manajemen Mutu LS 1.00 92,000,000.00 92,000,000.00 1.00 92,000,000.00

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 1,857.66 43,728.00 81,231,756.48 1,113.75 48,702,060.00
2.2.(1) Pasangan Batu dengan Mortar M3 488.68 1,099,338.00 537,224,493.84 137.06 150,675,266.28

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa M3 1,348.13 36,960.00 49,826,884.80 1,187.28 43,881,868.80
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 330.40 185,940.00 61,434,576.00 33.07 6,149,232.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 2,702.70 215,300.00 581,891,310.00 2,950.92 635,333,076.00

DIVISI 5. PERKERASAN BERBUTIR


5.1.(1) Lapis Pondasi Agregat Kelas A M3 6,774.34 813,194.00 5,508,852,641.96 5,410.02 4,399,395,803.88
5.1.(3) Lapis Pondasi Agregat Kelas S M3 2,980.58 703,705.00 2,097,449,048.90 2,740.14 1,928,250,218.70

DIVISI 6. PERKERASAN ASPAL


6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 21,399.00 18,000.00 385,182,000.00 19,672.80 354,110,400.00
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 6,529.95 19,410.00 126,746,329.50 9,976.05 193,635,130.50
6.3(5a) Laston Lapis Aus (AC-WC) Ton 1,982.71 1,476,571.00 2,927,612,087.41 2,258.26 3,334,481,226.46
6.3(6a) Laston Lapis Antara (AC-BC) Ton 2,953.06 1,426,721.00 4,213,192,716.26 3,373.80 4,813,471,309.80
6.3(7a) Laston Lapis Pondasi (AC-Base) Ton 4,675.68 1,357,864.00 6,348,937,547.52 5,360.60 7,278,965,758.40
6.3.(8) Bahan Anti Pengelupasan Kg 1,588.75 104,407.00 165,876,621.25 1,833.18 191,396,824.26

DIVISI 7. STRUKTUR
7.1 (5a) Beton Struktur, fc’30 Mpa M3 3.56 2,510,434.00 8,937,145.04 1.30 3,258,740.33
7.1 (7a) Beton Strukur, fc’20 MPa M3 16.00 2,227,712.00 35,643,392.00 16.00 35,643,392.00
7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 52.05 25,030.00 1,302,811.50 52.05 1,302,811.50
7.6 (1) Pondasi Cerucuk, Penyediaan dan Pemancangan M1 5,224.00 14,739.00 76,996,536.00 5,224.00 76,996,536.00
7.9.(1) Pasangan Batu M3 130.22 1,057,685.00 137,731,740.70 130.22 137,731,740.70
7.10.(3a) Bronjong dengan Kawat yang dilapisi Galvanis M3 325.02 956,164.00 310,772,423.28 325.02 310,772,423.28
7.14.(1) Papan Nama Jembatan Buah 8.00 756,208.00 6,049,664.00 8.00 6,049,664.00

DIVISI 8. REHABILITASI JEMBATAN


8.2.(1) Penambahan (Patching) M3 1.00 4,372,791.00 4,372,791.00 1.05 4,591,430.55
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe M1 133.55 2,393,752.00 319,685,579.60 133.55 319,685,579.60
Asphaltic Plug

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.2.(1) Marka Jalan Termoplastik M2 1,100.52 218,800.00 240,793,776.00 1,057.46 231,372,248.00
9.2.(5) Patok Pengarah Buah 16.00 153,464.00 2,455,424.00 29.00 4,450,456.00
9.2.(7) Rel Pengaman M1 700.00 823,835.00 576,684,500.00 360.00 296,580,600.00

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 2,404.80 56,100.00 134,909,280.00 1,047.21 58,748,427.36
10.1.(4) Perbaikan Lapis Pondasi Agregat Kelas A M3 1,510.32 927,140.00 1,400,278,084.80 1,938.83 1,797,569,729.60
10.1.(6) Perbaikan Lapis Pondasi Agregat Kelas S M3 625.84 806,496.00 504,737,456.64 224.88 181,364,820.48
10.1.(9) Perbaikan Campuran Aspal Panas M3 993.90 3,726,390.00 3,703,659,021.00 957.50 3,568,018,425.00
10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin M3 10.00 3,745,675.00 37,456,750.00 10.00 37,456,750.00
10.1.(21) Pembersihan Drainase M1 8,962.00 40,380.00 361,885,560.00 1,600.00 64,608,000.00
10.1.(22) Pengendalian Tanaman M2 291,200.00 1,012.00 294,694,400.00 721,200.00 729,854,400.00
10.2.(1) Pemeliharaan Rutin Jembatan Sei Arut LS 1.00 75,500,000.00 75,500,000.00 1.00 75,500,000.00
10.2.(2) Pemeliharaan Rutin Jembatan Sei Kunup LS 1.00 40,000,000.00 40,000,000.00 1.00 40,000,000.00
10.2.(3) Pemeliharaan Rutin Jembatan Sei Bukit Sintang LS 1.00 126,500,000.00 126,500,000.00 1.00 126,500,000.00
10.2.(4) Pemeliharaan Rutin Jembatan Box Runtu 12 LS 1.00 10,000,000.00 10,000,000.00 1.00 10,000,000.00
10.2.(5) Pemeliharaan Rutin Jembatan Box Runtu 13 LS 1.00 10,000,000.00 10,000,000.00 1.00 10,000,000.00
10.2.(6) Pemeliharaan Rutin Jembatan Sei Rimba LS 1.00 35,000,000.00 35,000,000.00 1.00 35,000,000.00
10.2.(7) Pemeliharaan Rutin Jembatan Sei Sababilah LS 1.00 150,000,000.00 150,000,000.00 1.00 150,000,000.00
10.2.(8) Pemeliharaan Rutin Jembatan Sei Selat I LS 1.00 9,300,000.00 9,300,000.00 1.00 9,300,000.00
10.2.(9) Pemeliharaan Rutin Jembatan Box Runtu 18 LS 1.00 10,000,000.00 10,000,000.00 1.00 10,000,000.00
10.2.(10) Pemeliharaan Rutin Jembatan Selat II LS 1.00 80,000,000.00 80,000,000.00 1.00 80,000,000.00
10.2.(11) Pemeliharaan Rutin Jembatan Sei Selat III LS 1.00 31,500,000.00 31,500,000.00 1.00 31,500,000.00
10.2.(12) Pemeliharaan Rutin Jembatan Sei Sulung I LS 1.00 135,000,000.00 135,000,000.00 1.00 135,000,000.00
10.2.(13) Pemeliharaan Rutin Jembatan Sei Sulat LS 1.00 75,500,000.00 75,500,000.00 1.00 75,500,000.00
10.2.(14) Pemeliharaan Rutin Jembatan Box Runtu 22.3 LS 1.00 10,000,000.00 10,000,000.00 1.00 10,000,000.00
10.2.(15) Pemeliharaan Rutin Jembatan Box Bandang LS 1.00 10,000,000.00 10,000,000.00 1.00 10,000,000.00
10.2.(16) Pemeliharaan Rutin Jembatan Sei Kujang LS 1.00 15,000,000.00 15,000,000.00 1.00 15,000,000.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 32,595,454,545.45 32,595,454,545.45
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 3,259,545,454.55 3,259,545,454.55
C Jumlah Total Harga Pekerjaan = (A) + (B) 35,855,000,000.00 35,855,000,000.00
D Jumlah Total Harga Pekerjaan (Dibulatkan) 35,855,000,000.00 35,855,000,000.00
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : REKONSTRUKSI JALAN KUJAN - RUNTU


NILAI PEKERJAAN : Rp. 26.841.751.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01


No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 195,653,559.61 195,653,559.61 1.00 195,653,559.61
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 96,847,636.36 96,847,636.36 1.00 96,847,636.36
1.17.(1a) Pengujian pH Buah 3.00 198,000.00 594,000.00 3.00 594,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 3.00 225,000.00 675,000.00 3.00 675,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 3.00 216,000.00 648,000.00 3.00 648,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 3.00 216,000.00 648,000.00 3.00 648,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 3.00 225,000.00 675,000.00 3.00 675,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 3.00 288,000.00 864,000.00 3.00 864,000.00
1.17.(1g) Pengujian Coliform Buah 3.00 378,000.00 1,134,000.00 3.00 1,134,000.00
1.17.(1h) Pengujian E. Coli Buah 3.00 306,000.00 918,000.00 3.00 918,000.00
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 3.00 441,000.00 1,323,000.00 3.00 1,323,000.00
1.17.(1j) Pengujian Temperatur (Suhu) Buah 3.00 198,000.00 594,000.00 3.00 594,000.00
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan Buah 3.00 684,000.00 2,052,000.00 3.00 2,052,000.00
dan Kesehatan
1.17.(2b) Pengujian Tingkat Getaran Kendaraan Bermotor Buah 3.00 855,000.00 2,565,000.00 3.00 2,565,000.00
1.17.(3a) Pengujian NoX Buah 3.00 387,000.00 1,161,000.00 3.00 1,161,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 3.00 468,000.00 1,404,000.00 3.00 1,404,000.00
1.17.(3c) Pengujian Karbondioksida (CO2) Buah 3.00 504,000.00 1,512,000.00 3.00 1,512,000.00
1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 3.00 486,000.00 1,458,000.00 3.00 1,458,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 3.00 468,000.00 1,404,000.00 3.00 1,404,000.00
1.17.(3g) Pengujian Timah Hitam (Pb) Buah 3.00 450,000.00 1,350,000.00 3.00 1,350,000.00
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 122,170,000.00 122,170,000.00 1.00 122,170,000.00
1.21 Manajemen Mutu LS 1.00 92,000,000.00 92,000,000.00 1.00 92,000,000.00

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 1,100.00 x ( 1,25 + 1,00 ) / 2 x 0.90 1,857.66 43,728.00 81,231,756.48 1,113.75 48,702,060.00

2.2.(1) Pasangan Batu dengan Mortar M3 150.00 x (((1,75+1,60)/2x1,15))-(((1,25+1,00)/2x0,90)) 488.68 1,099,338.00 537,224,493.84 137.06 150,675,266.28

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa M3 170.00 x 2 x 3 1,180.85 36,960.00 43,644,216.00 1,020.00 37,699,200.00

3.2.(1a) Timbunan Biasa dari Sumber Galian M3 50.00 x 2 x 0.33 330.40 185,940.00 61,434,576.00 33.07 6,149,232.00

3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 3,513.00 x 2 x 0.21 x 2 2,702.70 215,300.00 581,891,310.00 2,950.92 635,333,076.00
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 3,513.00 x 7 x 0.22 6,774.34 813,194.00 5,508,852,641.96 5,410.02 4,399,395,803.88

5.1.(3) Lapis Pondasi Agregat Kelas S M3 3,513.00 x 2 x 0.195 x 2 2,980.58 703,705.00 2,097,449,048.90 2,740.14 1,928,250,218.70

DIVISI 6. PERKERASAN ASPAL


6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 3,513.00 x 7 x 0.80 21,399.00 18,000.00 385,182,000.00 19,672.80 354,110,400.00

6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 3,513.00 x 7 x 0.20 x 2 6,419.70 19,410.00 124,606,377.00 9,836.40 190,924,524.00

6.3(5a) Laston Lapis Aus (AC-WC) Ton 3,513.00 x 7 x 0.04 x 2.280 x 6.00% x 0.30% 2242.7 403.69 1,968.71 1,476,571.00 2,906,940,093.41 2,242.30 3,310,915,153.30

6.3(6a) Laston Lapis Antara (AC-BC) Ton 3,513.00 x 7 x 0.06 x 2.287 x 5.70% x 0.30% 3374.4 577.02 2,953.06 1,426,721.00 4,213,192,716.26 3,373.80 4,813,471,309.80

6.3(7a) Laston Lapis Pondasi (AC-Base) Ton 3,513.00 x 7 x 0.095 x 2.295 x 5.30% x 0.30% 5361.5 852.47 4,675.68 1,357,864.00 6,348,937,547.52 5,360.60 7,278,965,758.40

6.3.(8) Bahan Anti Pengelupasan Kg 1,588.75 104,407.00 165,876,621.25 1,833.18 191,396,824.26


- Laston Lapis Aus (AC-WC) 403.69
- Laston Lapis Antara (AC-BC) 577.02
- Laston Lapis Pondasi (AC-Base) 852.47

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.2.(1) Marka Jalan Termoplastik M2 1,100.52 218,800.00 240,793,776.00 1,057.46 231,372,248.00
3,513.00 x 0.12 x 2 Tepi (Solid) 843.12
2,763.00 x 0.12 x 0.375 Tengah (Putus-Putus) 124.34
750.00 x 0.12 Tengah (Solid) 90.00

9.2.(7) Rel Pengaman M1 700.00 823,835.00 576,684,500.00 360.00 296,580,600.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 24,401,591,870.59 24,401,591,870.59
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 2,440,159,187.06 2,440,159,187.06
C Jumlah Total Harga Pekerjaan = (A) + (B) 26,841,751,057.65 26,841,751,057.65
D Jumlah Total Harga Pekerjaan (Dibulatkan) 26,841,751,000.00 26,841,751,000.00
DATA SURVEY
REKONSTRUKSI JALAN KUJAN - RUNTU

Galian untuk Selokan Drainase dan Saluran Air


Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 07+050.00 - 07+250.00 Kiri 200.00 1.25 250.00 Segmen 1


2 07+775.00 - 07+925.00 Kiri 150.00 1.25 187.50 Segmen 1
3 24+850.00 - 25+350.00 Kanan 500.00 1.25 625.00 Segmen 4
4 25+100.00 - 25+350.00 Kiri 250.00 1.25 312.50 Segmen 4

Total 1,100.00 1,375.00

Pasangan Batu dengan Mortar


Panjang Luas
No. STA. Posisi Ket.
(M) (M3)

1 07+050.00 - 07+200.00 Kanan 150.00 137.06 Segmen 1

Total 150.00 137.06

Galian Biasa
Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 17+050.00 - 17+220.00 Kanan 170.00 2.00 340.00 Segmen 3

Total 170.00 340.00

Timbunan Biasa dari Sumber Galian


Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 09+200.00 - 09+250.00 Kiri 50.00 2.00 100.00 Segmen 2

Total 50.00 100.00

Timbunan Pilihan dari Sumber Galian (T = Variasi)


Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 06+980.00 - 07+900.00 Kiri/Kanan 920.00 2.00 3,680.00 Segmen 1


2 08+900.00 - 10+475.00 Kiri/Kanan 1,575.00 2.00 6,300.00 Segmen 2
3 16+940.00 - 17+360.00 Kiri/Kanan 420.00 2.00 1,680.00 Segmen 3
4 24+880.00 - 25+478.00 Kiri/Kanan 598.00 2.00 2,392.00 Segmen 4

Total 3,513.00 14,052.00


Lapis Pondasi Agregat Kelas A (T = 22 Cm)
Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 06+980.00 - 07+900.00 Full 920.00 7.00 6,440.00 Segmen 1


2 08+900.00 - 10+475.00 Full 1,575.00 7.00 11,025.00 Segmen 2
3 16+940.00 - 17+360.00 Full 420.00 7.00 2,940.00 Segmen 3
4 24+880.00 - 25+478.00 Full 598.00 7.00 4,186.00 Segmen 4

Total 3,513.00 24,591.00

Lapis Pondasi Agregat Kelas S (T = 19,5 Cm)


Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 06+980.00 - 07+900.00 Kiri/Kanan 920.00 2.00 3,680.00 Segmen 1


2 08+900.00 - 10+475.00 Kiri/Kanan 1,575.00 2.00 6,300.00 Segmen 2
3 16+940.00 - 17+360.00 Kiri/Kanan 420.00 2.00 1,680.00 Segmen 3
4 24+880.00 - 25+478.00 Kiri/Kanan 598.00 2.00 2,392.00 Segmen 4

Total 3,513.00 14,052.00

Laston Lapis Aus (AC-WC) (T = 4 Cm)


Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 06+980.00 - 07+900.00 Full 920.00 7.00 6,440.00 Segmen 1


2 08+900.00 - 10+475.00 Full 1,575.00 7.00 11,025.00 Segmen 2
3 16+940.00 - 17+360.00 Full 420.00 7.00 2,940.00 Segmen 3
4 24+880.00 - 25+478.00 Full 598.00 7.00 4,186.00 Segmen 4

Total 3,513.00 24,591.00

Laston Lapis Antara (AC-BC) (T = 6 Cm)


Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 06+980.00 - 07+900.00 Full 920.00 7.00 6,440.00 Segmen 1


2 08+900.00 - 10+475.00 Full 1,575.00 7.00 11,025.00 Segmen 2
3 16+940.00 - 17+360.00 Full 420.00 7.00 2,940.00 Segmen 3
4 24+880.00 - 25+478.00 Full 598.00 7.00 4,186.00 Segmen 4
Total 3,513.00 24,591.00

Laston Lapis Pondasi (AC-Base) (T = 9,5 Cm)


Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 06+980.00 - 07+900.00 Full 920.00 7.00 6,440.00 Segmen 1


2 08+900.00 - 10+475.00 Full 1,575.00 7.00 11,025.00 Segmen 2
3 16+940.00 - 17+360.00 Full 420.00 7.00 2,940.00 Segmen 3
4 24+880.00 - 25+478.00 Full 598.00 7.00 4,186.00 Segmen 4

Total 3,513.00 24,591.00

Rel Pengaman
Panjang Luas
No. STA. Posisi Ket.
(M) (M1)

1 12+700.00 - 12+850.00 Kanan 150.00 150.00


2 26+250.00 - 26+400.00 Kiri 150.00 150.00
3 37+500.00 - 37+560.00 Kiri 60.00 60.00

Total 360.00 360.00


PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN RUTIN JALAN KUJAN - RUNTU


NILAI PEKERJAAN : Rp. 795.735.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 1,650.00 x 1 x 1 x 50% 1,468.80 56,100.00 82,399,680.00 823.62 46,205,272.96

10.1.(6) Perbaikan Lapis Pondasi Agregat Kelas S M3 1,557.00 x 1 x 0.12 326.10 806,496.00 262,998,345.60 186.84 150,685,712.64

10.1.(21) Pembersihan Drainase M1 1,400.00 x 1 5,712.00 40,380.00 230,650,560.00 1,400.00 56,532,000.00

10.1.(22) Pengendalian Tanaman M2 38,700.00 x 2 x 2 x 75% x 4 145,600.00 1,012.00 147,347,200.00 464,400.00 469,972,800.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 723,395,785.60 723,395,785.60
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 72,339,578.56 72,339,578.56
C Jumlah Total Harga Pekerjaan = (A) + (B) 795,735,364.16 795,735,364.16
D Jumlah Total Harga Pekerjaan (Dibulatkan) 795,735,000.00 795,735,000.00
DATA SURVEY
PEMEL. RUTIN JALAN KUJAN - RUNTU

Galian pada Saluran Air atau Lereng untuk Pemeliharaan


Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 15+000.00 - 15+200.00 Kiri 200.00 1.00 200.00


2 15+000.00 - 15+750.00 Kanan 750.00 1.00 750.00
3 15+600.00 - 16+300.00 Kiri 700.00 1.00 700.00

Total 1,650.00 1,650.00

Perbaikan Lapis Pondasi Agregat Kelas S


Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 14+050.00 - 14+500.00 Kiri 450.00 1.00 450.00


2 14+050.00 - 14+357.00 Kanan 307.00 1.00 307.00
3 35+000.00 - 35+400.00 Kiri 400.00 1.00 400.00
4 35+000.00 - 35+400.00 Kanan 400.00 1.00 400.00

Total 1,557.00 1,557.00

Pembersihan Drainase
Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M1)

1 36+400.00 - 37+100.00 Kiri 700.00 700.00


2 36+400.00 - 37+100.00 Kanan 700.00 700.00

Total 1,400.00 1,400.00

Pengendalian Tanaman
Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 00+000.00 - 06+950.00 Kiri/Kanan 6,950.00 2.00 27,800.00


2 07+900.00 - 08+900.00 Kiri/Kanan 1,000.00 2.00 4,000.00
3 10+500.00 - 16+900.00 Kiri/Kanan 6,400.00 2.00 25,600.00
4 17+400.00 - 24+850.00 Kiri/Kanan 7,450.00 2.00 29,800.00
5 25+500.00 - 42+400.00 Kiri/Kanan 16,900.00 2.00 67,600.00

Total 38,700.00 154,800.00


PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN RUTIN JALAN RUNTU - SIMPANG RUNTU


NILAI PEKERJAAN : Rp. 630.114.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitugan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 450.00 x 1 x 1 x 50% 936.00 56,100.00 52,509,600.00 223.59 12,543,154.40

10.1.(4) Perbaikan Lapis Pondasi Agregat Kelas A M3 866.40 x 0.1248 927,140.00 108.10 100,223,834.00

10.1.(6) Perbaikan Lapis Pondasi Agregat Kelas S M3 317.00 x 1 x 0.12 299.74 806,496.00 241,739,111.04 38.04 30,679,107.84

10.1.(9) Perbaikan Campuran Aspal Panas M3 866.40 x 0.05 3,726,390.00 43.32 161,427,214.80

10.1.(21) Pembersihan Drainase M1 200.00 x 1 3,250.00 40,380.00 131,235,000.00 200.00 8,076,000.00

10.1.(22) Pengendalian Tanaman M2 21,400.00 x 2 x 2 x 75% x 4 145,600.00 1,012.00 147,347,200.00 256,800.00 259,881,600.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 572,830,911.04 572,830,911.04
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 57,283,091.10 57,283,091.10
C Jumlah Total Harga Pekerjaan = (A) + (B) 630,114,002.14 630,114,002.14
D Jumlah Total Harga Pekerjaan (Dibulatkan) 630,114,000.00 630,114,000.00
DATA SURVEY
PEMEL. RUTIN JALAN RUNTU - SIMPANG RUNTU

Galian pada Saluran Air atau Lereng untuk Pemeliharaan


Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 12+200.00 - 12+650.00 Kiri 450.00 1.00 450.00

Total 450.00 450.00

Perbaikan Lapis Pondasi Agregat Kelas A


No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

16 01+300.00 Kanan 6.00 3.00 18.00


17 01+315.00 Full 12.00 6.00 72.00
24 02+980.00 Kanan 11.00 3.00 33.00
25 03+036.00 Full 10.00 6.00 60.00
34 04+869.00 Full 20.00 6.00 120.00
126 12+035.00 Kanan 6.00 2.40 14.40
132 12+271.00 Kanan 8.00 3.00 24.00
171 17+250.00 Kanan 14.00 3.00 42.00
172 17+273.00 Full 8.00 6.00 48.00
180 17+508.00 Kanan 9.00 3.00 27.00
181 17+524.00 Full 12.00 6.00 72.00
186 17+716.00 Kiri 10.00 2.40 24.00
187 17+734.00 Full 30.00 6.00 180.00
211 20+763.00 Full 14.00 6.00 84.00
212 20+841.00 Full 8.00 6.00 48.00

Total 866.40

Perbaikan Lapis Pondasi Agregat Kelas S


Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 14+150.00 - 14+467.00 Kiri 317.00 1.00 317.00

Total 317.00 317.00


Perbaikan Campuran Aspal Panas
No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

16 01+300.00 Kanan 6.00 3.00 18.00


17 01+315.00 Full 12.00 6.00 72.00
24 02+980.00 Kanan 11.00 3.00 33.00
25 03+036.00 Full 10.00 6.00 60.00
34 04+869.00 Full 20.00 6.00 120.00
126 12+035.00 Kanan 6.00 2.40 14.40
132 12+271.00 Kanan 8.00 3.00 24.00
171 17+250.00 Kanan 14.00 3.00 42.00
172 17+273.00 Full 8.00 6.00 48.00
180 17+508.00 Kanan 9.00 3.00 27.00
181 17+524.00 Full 12.00 6.00 72.00
186 17+716.00 Kiri 10.00 2.40 24.00
187 17+734.00 Full 30.00 6.00 180.00
211 20+763.00 Full 14.00 6.00 84.00
212 20+841.00 Full 8.00 6.00 48.00

Total 866.40

Pembersihan Drainase
Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M1)

1 12+700.00 - 12+900.00 Kiri 200.00 200.00

Total 200.00 200.00

Pengendalian Tanaman
Panjang Lebar Luas
No. STA. Posisi Ket.
(M) (M) (M2)

1 00+000.00 - 21+400.00 Kiri/Kanan 21,400.00 2.00 85,600.00

Total 21,400.00 85,600.00


PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN RUTIN KONDISI KUJAN - RUNTU


NILAI PEKERJAAN : Rp. 527.879.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.1.(4) Perbaikan Lapis Pondasi Agregat Kelas A M3 1,445.00 x 0.1249 131.25 927,140.00 121,687,125.00 180.49 167,335,402.50

10.1.(9) Perbaikan Campuran Aspal Panas M3 1,577.00 x 0.05 91.10 3,726,390.00 339,474,129.00 78.85 293,825,851.50

10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin M3 100.00 x 0.05 5.00 3,745,675.00 18,728,375.00 5.00 18,728,375.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 479,889,629.00 479,889,629.00
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 47,988,962.90 47,988,962.90
C Jumlah Total Harga Pekerjaan = (A) + (B) 527,878,591.90 527,878,591.90
D Jumlah Total Harga Pekerjaan (Dibulatkan) 527,879,000.00 527,879,000.00
DATA SURVEY
PEMEL. RUTIN KONDISI KUJAN - RUNTU

Perbaikan Lapis Pondasi Agregat Kelas A


No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

9 02+548.00 Full 10.00 6.00 60.00


10 02+680.00 Kanan 11.00 3.00 33.00
11 02+816.00 Kanan 17.00 3.50 59.50
14 02+987.00 Kanan 11.00 3.50 38.50
17 03+725.00 Kanan 5.00 2.40 12.00
18 03+790.00 Full 13.00 6.00 78.00
19 03+934.00 Kanan 7.00 2.50 17.50
20 03+984.00 Kanan 5.00 2.50 12.50
25 04+165.00 Kanan 54.00 3.00 162.00
27 04+531.00 Kiri 9.00 2.50 22.50
04+604.00 Kanan 33.00 3.00 99.00
28
04+637.00 Full 34.00 6.00 204.00
30 05+430.00 Kanan 12.00 2.50 30.00
31 06+090.00 Kanan 5.00 2.00 10.00
08+434.00 Kanan 6.00 2.40 14.40
43
08+440.00 Kanan 10.00 4.00 40.00
47 08+544.00 Kanan 13.00 3.50 45.50
48 08+583.00 Full 25.00 6.00 150.00
50 08+668.00 Kanan 5.00 2.50 12.50
51 08+685.00 Kanan 5.00 2.50 12.50
52 08+728.00 Kanan 30.00 3.50 105.00
53 08+774.00 Tengah 3.00 2.50 7.50
54 08+788.00 Kanan 5.00 2.40 12.00
55 08+804.00 Kanan 5.00 2.50 12.50
56 08+831.00 Kiri 22.00 3.50 77.00
10+739.00 Kiri 19.00 2.40 45.60
58
10+758.00 Full 12.00 6.00 72.00

Total 1,445.00

Perbaikan Campuran Aspal Panas


No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

1 02+338.00 Full 22.00 6.00 132.00


9 02+548.00 Full 10.00 6.00 60.00
10 02+680.00 Kanan 11.00 3.00 33.00
11 02+816.00 Kanan 17.00 3.50 59.50
14 02+987.00 Kanan 11.00 3.50 38.50
17 03+725.00 Kanan 5.00 2.40 12.00
18 03+790.00 Full 13.00 6.00 78.00
19 03+934.00 Kanan 7.00 2.50 17.50
20 03+984.00 Kanan 5.00 2.50 12.50
25 04+165.00 Kanan 54.00 3.00 162.00
27 04+531.00 Kiri 9.00 2.50 22.50
04+604.00 Kanan 33.00 3.00 99.00
28
04+637.00 Full 34.00 6.00 204.00
30 05+430.00 Kanan 12.00 2.50 30.00
31 06+090.00 Kanan 5.00 2.00 10.00
08+434.00 Kanan 6.00 2.40 14.40
43
08+440.00 Kanan 10.00 4.00 40.00
47 08+544.00 Kanan 13.00 3.50 45.50
48 08+583.00 Full 25.00 6.00 150.00
50 08+668.00 Kanan 5.00 2.50 12.50
51 08+685.00 Kanan 5.00 2.50 12.50
52 08+728.00 Kanan 30.00 3.50 105.00
53 08+774.00 Tengah 3.00 2.50 7.50
54 08+788.00 Kanan 5.00 2.40 12.00
55 08+804.00 Kanan 5.00 2.50 12.50
56 08+831.00 Kiri 22.00 3.50 77.00
10+739.00 Kiri 19.00 2.40 45.60
58
10+758.00 Full 12.00 6.00 72.00

Total 1,577.00

Perbaikan Asbuton Campuran Panas Hampar Dingin


No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

02+460.00 Full 7.00 6.00 42.00


7
02+467.00 Kiri 6.00 3.00 18.00
30 05+430.00 Kanan 12.00 2.50 30.00
31 06+090.00 Kanan 5.00 2.00 10.00

Total 100.00
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN RUTIN KONDISI RUNTU - SIMPANG RUNTU


NILAI PEKERJAAN : Rp. 97.969.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.1.(4) Perbaikan Lapis Pondasi Agregat Kelas A M3 281.70 x 0.1248 23.25 927,140.00 21,556,005.00 35.15 32,586,119.40

10.1.(9) Perbaikan Campuran Aspal Panas M3 202.50 x 0.05 13.09 3,726,390.00 48,778,445.10 10.13 37,748,330.70

10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin M3 100.00 x 0.05 5.00 3,745,675.00 18,728,375.00 5.00 18,728,375.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 89,062,825.10 89,062,825.10
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 8,906,282.51 8,906,282.51
C Jumlah Total Harga Pekerjaan = (A) + (B) 97,969,107.61 97,969,107.61
D Jumlah Total Harga Pekerjaan (Dibulatkan) 97,969,000.00 97,969,000.00
DATA SURVEY
PEMEL. RUTIN KONDISI RUNTU - SIMPANG RUNTU

Perbaikan Lapis Pondasi Agregat Kelas A


No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

135 13+060.00 Kanan 5.00 3.00 15.00


137 13+266.00 Full 33.75 6.00 202.50
138 13+607.00 Kanan 13.00 2.40 31.20
140 13+743.00 Kanan 7.00 3.00 21.00
141 13+858.00 Kanan 5.00 2.40 12.00

Total 281.70

Perbaikan Campuran Aspal Panas


No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

137 13+266.00 Full 33.75 6.00 202.50

Total 202.50

Perbaikan Asbuton Campuran Panas Hampar Dingin


No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

135 13+060.00 Kanan 5.00 3.00 15.00


138 13+607.00 Kanan 13.00 2.40 31.20
139 13+620.00 Kiri 7.00 2.97 20.80
140 13+743.00 Kanan 7.00 3.00 21.00
141 13+858.00 Kanan 5.00 2.40 12.00

Total 100.00
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PENUNJANG/HOLDING KUJAN - RUNTU


NILAI PEKERJAAN : Rp. 3.426.011.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.1.(4) Perbaikan Lapis Pondasi Agregat Kelas A M3 8,101.70 x 0.125 1,053.00 927,140.00 976,278,420.00 1,012.53 938,753,672.70

10.1.(9) Perbaikan Campuran Aspal Panas M3 11,677.70 x 0.05 573.82 3,726,390.00 2,138,277,109.80 583.89 2,175,801,857.10

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 3,114,555,529.80 3,114,555,529.80
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 311,455,552.98 311,455,552.98
C Jumlah Total Harga Pekerjaan = (A) + (B) 3,426,011,082.78 3,426,011,082.78
D Jumlah Total Harga Pekerjaan (Dibulatkan) 3,426,011,000.00 3,426,011,000.00
DATA SURVEY
PENUNJANG/HOLDING KUJAN - RUNTU

Perbaikan Lapis Pondasi Agregat Kelas A


No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

59 10+786.00 Full 53.00 6.00 318.00


60 10+850.00 Kanan 25.00 2.40 60.00
61 10+887.00 Kanan 11.00 2.40 26.40
62 10+912.00 Kanan 6.00 2.40 14.40
63 10+924.00 Kanan 7.00 2.40 16.80
64 10+955.00 Full 25.00 6.00 150.00
66 11+070.00 Kanan 19.00 3.00 57.00
67 11+083.00 Kiri 4.00 2.40 9.60
69 11+153.00 Kanan 5.00 2.40 12.00
70 11+172.00 Kanan 29.00 2.40 69.60
71 11+220.00 Kiri 7.00 2.40 16.80
74 11+323.00 Kanan 5.00 2.40 12.00
75 11+460.00 Kanan 7.00 2.40 16.80
76 11+522.00 Kanan 9.00 2.40 21.60
78 11+559.00 Kanan 3.00 2.40 7.20
79 11+700.00 Kanan 7.00 2.40 16.80
81 11+742.00 Kanan 17.00 2.40 40.80
82 11+759.00 Full 9.00 6.00 54.00
84 11+800.00 Full 60.00 6.00 360.00
85 12+000.00 Kiri 4.00 3.00 12.00
88 12+227.00 Full 9.00 6.00 54.00
112 15+169.00 Kanan 12.00 2.00 24.00
113 15+378.00 Kanan 7.00 2.50 17.50
114 15+530.00 Kanan 7.00 3.00 21.00
115 15+800.00 Kanan 7.00 2.50 17.50
116 15+830.00 Kanan 4.00 2.50 10.00
118 15+931.00 Kanan 8.00 6.00 48.00
120 16+092.00 Kanan 21.00 6.00 126.00
121 16+135.00 Kiri 6.00 2.00 12.00
125 16+429.00 Kanan 9.00 3.00 27.00
126 16+515.00 Kanan 9.00 1.50 13.50
129 16+705.00 Kanan 5.00 2.50 12.50
130 16+720.00 Kanan 14.00 2.50 35.00
17+400.00 Full 7.00 6.00 42.00
150
17+407.00 Kanan 19.00 3.00 57.00
158 17+822.00 Full 6.00 6.00 36.00
161 18+220.00 Kiri 4.00 2.50 10.00
168 18+893.00 Kanan 14.00 3.00 42.00
169 18+934.00 Kanan 5.00 2.50 12.50
189 20+806.00 Kanan 10.00 3.00 30.00
190 21+225.00 Kanan 14.00 3.00 42.00
191 21+228.00 Kiri 3.00 2.00 6.00
194 21+347.00 Kanan 10.00 2.50 25.00
200 21+908.00 Kanan 11.00 3.00 33.00
202 22+617.00 Kanan 8.00 3.00 24.00
203 22+657.00 Kanan 7.00 2.50 17.50
204 22+718.00 Kanan 11.00 2.50 27.50
205 22+758.00 Kanan 4.00 2.50 10.00
206 22+783.00 Kanan 4.00 2.50 10.00
207 22+828.00 Kanan 7.00 2.50 17.50
22+914.00 Full 59.00 6.00 354.00
208
22+973.00 Kanan 11.00 3.00 33.00
210 23+019.00 Kanan 4.00 2.50 10.00
213 23+131.00 Kanan 16.00 2.50 40.00
214 23+159.00 Kanan 8.00 2.50 20.00
23+185.00 Kanan 12.00 3.00 36.00
215
23+197.00 Full 9.00 6.00 54.00
217 23+228.00 Kanan 13.00 2.00 26.00
218 23+310.00 Kiri 4.00 3.00 12.00
219 23+313.00 Kanan 9.00 2.50 22.50
23+379.00 Kanan 12.00 3.00 36.00
220
23+391.00 Full 6.00 6.00 36.00
228 23+789.00 Full 20.00 6.00 120.00
229 23+827.00 Full 13.00 6.00 78.00
231 24+125.00 Kanan 5.00 2.00 10.00
233 24+330.00 Kanan 17.00 3.00 51.00
239 24+657.00 Kanan 6.00 2.50 15.00
257 25+605.00 Full 15.00 6.00 90.00
258 25+639.00 Kanan 13.00 3.00 39.00
259 25+658.00 Kiri 5.00 1.50 7.50
260 25+671.00 Kanan 3.00 2.00 6.00
26+340.00 Kanan 7.00 2.00 14.00
271
26+347.00 Kiri 8.00 4.00 32.00
276 26+452.00 Full 15.00 6.00 90.00
277 26+494.00 Kanan 6.00 3.00 18.00
280 26+707.00 Kanan 15.00 4.00 60.00
285 26+913.00 Kanan 10.00 2.40 24.00
286 26+944.00 Kanan 9.00 3.00 27.00
290 27+095.00 Kiri 15.00 4.00 60.00
27+588.00 Full 32.00 6.00 192.00
293
27+620.00 Kanan 13.00 3.00 39.00
294 27+644.00 Full 13.00 6.00 78.00
295 27+721.00 Kanan 3.00 4.00 12.00
297 28+351.00 Kiri 5.00 2.40 12.00
300 28+457.00 Full 9.00 6.00 54.00
301 28+476.00 Full 86.00 6.00 516.00
316 29+081.00 Full 9.00 6.00 54.00
317 29+980.00 Kanan 7.00 2.40 16.80
323 30+350.00 Full 27.00 6.00 162.00
325 30+425.00 Kanan 7.00 3.00 21.00
326 30+515.00 Kanan 5.00 3.00 15.00
329 30+858.00 Full 17.00 6.00 102.00
332 31+075.00 Full 13.00 6.00 78.00
334 31+210.00 Full 16.00 6.00 96.00
335 31+285.00 Full 8.00 6.00 48.00
338 31+346.00 Kanan 6.00 2.50 15.00
340 31+391.00 Kanan 8.00 2.40 19.20
341 31+408.00 Kanan 3.00 2.50 7.50
31+504.00 Kiri 6.00 3.00 18.00
346
31+510.00 Full 17.00 6.00 102.00
348 31+682.00 Kanan 5.00 2.50 12.50
31+754.00 Full 13.00 6.00 78.00
349
31+767.00 Kanan 11.00 3.00 33.00
351 31+925.00 Kanan 9.00 2.50 22.50
354 33+108.00 Kanan 7.00 2.50 17.50
356 33+250.00 Kanan 7.00 3.00 21.00
357 33+655.00 Kanan 8.00 2.40 19.20
358 33+750.00 Kanan 10.00 2.40 24.00
359 33+766.00 Kanan 12.00 2.40 28.80
33+810.00 Kanan 13.00 2.50 32.50
360
33+823.00 Full 7.00 6.00 42.00
327 33+932.00 Kanan 11.00 2.40 26.40
328 33+947.00 Kanan 20.00 2.40 48.00
329 33+973.00 Kanan 9.00 2.40 21.60
333 34+103.00 Kanan 7.00 3.00 21.00
336 34+230.00 Kanan 7.00 2.50 17.50
337 34+313.00 Kanan 26.00 2.50 65.00
338 34+345.00 Full 41.00 6.00 246.00
339 34+433.00 Full 12.00 6.00 72.00
341 34+575.00 Kiri 7.00 2.40 16.80
343 34+622.00 Full 30.00 6.00 180.00
349 34+743.00 Kanan 16.00 2.40 38.40
351 34+774.00 Kanan 12.00 4.00 48.00
353 34+829.00 Kanan 9.00 3.00 27.00
354 34+849.00 Full 16.00 6.00 96.00
355 34+874.00 Kanan 6.00 2.50 15.00
357 34+935.00 Kanan 5.00 2.40 12.00
34+962.00 Kanan 5.00 4.00 20.00
359
34+967.00 Kanan 7.00 2.40 16.80
360 34+977.00 Kiri 6.00 2.50 15.00
361 34+987.00 Kiri 10.00 2.40 24.00
362 35+000.00 Full 16.00 6.00 96.00
365 35+228.00 Kanan 6.00 2.50 15.00
367 35+307.00 Kanan 4.00 2.40 9.60
373 35+616.00 Kanan 12.00 2.40 28.80
376 35+676.00 Kanan 15.00 3.00 45.00
377 35+748.00 Kanan 10.00 2.40 24.00
378 35+776.00 Kanan 6.00 2.50 15.00
379 35+790.00 Kanan 3.00 2.50 7.50
381 35+823.00 Kanan 12.00 3.00 36.00
382 35+840.00 Kanan 8.00 2.40 19.20
385 38+098.00 Kanan 7.00 2.40 16.80

397 38+408.00 Kiri 3.00 2.00 6.00


400 38+842.00 Kanan 11.00 2.00 22.00
401 38+940.00 Kanan 6.00 2.50 15.00
402 38+985.00 Kanan 9.00 2.50 22.50
403 39+033.00 Kiri 6.00 3.50 21.00
404 39+050.00 Kanan 6.00 3.00 18.00
405 39+056.00 Kiri 5.00 1.50 7.50
407 39+094.00 Kanan 4.00 2.50 10.00
408 39+101.00 Full 35.00 6.00 210.00
409 39+325.00 Full 33.00 6.00 198.00
410 39+390.00 Kanan 12.00 2.50 30.00
411 39+535.00 Kiri 4.00 2.00 8.00
412 39+910.00 Kanan 5.00 3.00 15.00
413 40+006.00 Kanan 10.00 3.00 30.00
414 40+049.00 Kanan 5.00 3.00 15.00
415 40+085.00 Kanan 24.00 3.00 72.00
416 40+118.00 Kanan 14.00 3.00 42.00
418 40+152.00 Kanan 3.00 2.00 6.00
419 40+166.00 Kanan 8.00 2.50 20.00
40+203.00 Kanan 12.00 3.00 36.00
420
40+215.00 Full 6.00 6.00 36.00
422 40+711.00 Kanan 9.00 3.00 27.00
423 40+722.00 Kiri 6.00 3.50 21.00
424 40+825.00 Full 10.00 6.00 60.00
425 40+865.00 Kanan 9.00 3.00 27.00
426 40+953.00 Kanan 8.00 3.00 24.00
427 41+043.00 Kanan 10.00 2.00 20.00
428 41+127.00 Kanan 10.00 3.00 30.00
429 41+143.00 Full 20.00 6.00 120.00
430 41+325.00 Kanan 6.00 3.00 18.00
433 42+302.00 Kanan 7.00 2.00 14.00

Total 8,101.70
Perbaikan Campuran Aspal Panas
No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

59 10+786.00 Full 53.00 6.00 318.00


60 10+850.00 Kanan 25.00 2.40 60.00
61 10+887.00 Kanan 11.00 2.40 26.40
62 10+912.00 Kanan 6.00 2.40 14.40
63 10+924.00 Kanan 7.00 2.40 16.80
64 10+955.00 Full 25.00 6.00 150.00
66 11+070.00 Kanan 19.00 3.00 57.00
67 11+083.00 Kiri 4.00 2.40 9.60
69 11+153.00 Kanan 5.00 2.40 12.00
70 11+172.00 Kanan 29.00 2.40 69.60
71 11+220.00 Kiri 7.00 2.40 16.80
74 11+323.00 Kanan 5.00 2.40 12.00
75 11+460.00 Kanan 7.00 2.40 16.80
76 11+522.00 Kanan 9.00 2.40 21.60
78 11+559.00 Kanan 3.00 2.40 7.20
79 11+700.00 Kanan 7.00 2.40 16.80
81 11+742.00 Kanan 17.00 2.40 40.80
82 11+759.00 Full 9.00 6.00 54.00
84 11+800.00 Full 60.00 6.00 360.00
85 12+000.00 Kiri 4.00 3.00 12.00
87 12+123.00 Full 29.00 6.00 174.00
88 12+227.00 Full 9.00 6.00 54.00
13+185.00 Kanan 31.00 3.00 93.00
89
13+216.00 Full 42.00 6.00 252.00
13+353.00 Kanan 29.00 3.00 87.00
91
13+382.00 Full 17.00 6.00 102.00
14+210.00 Kanan 97.00 3.00 291.00
104
14+307.00 Full 15.00 6.00 90.00
105 14+326.00 Full 58.00 6.00 348.00
106 14+394.00 Full 42.00 6.00 252.00
14+441.00 Full 61.00 6.00 366.00
107
14+502.00 Kanan 16.00 3.00 48.00
110 14+563.00 Full 30.00 6.00 180.00
111 14+735.00 Full 38.00 6.00 228.00
112 15+169.00 Kanan 12.00 2.00 24.00
113 15+378.00 Kanan 7.00 2.50 17.50
114 15+530.00 Kanan 7.00 3.00 21.00
115 15+800.00 Kanan 7.00 2.50 17.50
116 15+830.00 Kanan 4.00 2.50 10.00
118 15+931.00 Kanan 8.00 6.00 48.00
120 16+092.00 Kanan 21.00 6.00 126.00
121 16+135.00 Kiri 6.00 2.00 12.00
125 16+429.00 Kanan 9.00 3.00 27.00
126 16+515.00 Kanan 9.00 1.50 13.50
129 16+705.00 Kanan 5.00 2.50 12.50
130 16+720.00 Kanan 14.00 2.50 35.00

132 16+766.00 Full 11.00 6.00 66.00


133 16+793.00 Full 12.00 6.00 72.00
17+400.00 Full 7.00 6.00 42.00
150
17+407.00 Kanan 19.00 3.00 57.00
151 17+451.00 Full 21.00 6.00 126.00
153 17+516.00 Full 33.00 6.00 198.00
158 17+822.00 Full 6.00 6.00 36.00
161 18+220.00 Kiri 4.00 2.50 10.00
18+447.00 Kanan 22.00 3.00 66.00
165
18+469.00 Full 31.00 6.00 186.00
168 18+893.00 Kanan 14.00 3.00 42.00
169 18+934.00 Kanan 5.00 2.50 12.50
19+031.00 Kanan 11.00 3.00 33.00
172
19+042.00 Full 18.00 6.00 108.00
177 19+439.00 Full 35.00 6.00 210.00
189 20+806.00 Kanan 10.00 3.00 30.00
190 21+225.00 Kanan 14.00 3.00 42.00
191 21+228.00 Kiri 3.00 2.00 6.00
194 21+347.00 Kanan 10.00 2.50 25.00
200 21+908.00 Kanan 11.00 3.00 33.00
202 22+617.00 Kanan 8.00 3.00 24.00
203 22+657.00 Kanan 7.00 2.50 17.50
204 22+718.00 Kanan 11.00 2.50 27.50
205 22+758.00 Kanan 4.00 2.50 10.00
206 22+783.00 Kanan 4.00 2.50 10.00
207 22+828.00 Kanan 7.00 2.50 17.50
22+914.00 Full 59.00 6.00 354.00
208
22+973.00 Kanan 11.00 3.00 33.00
210 23+019.00 Kanan 4.00 2.50 10.00
213 23+131.00 Kanan 16.00 2.50 40.00
214 23+159.00 Kanan 8.00 2.50 20.00
23+185.00 Kanan 12.00 3.00 36.00
215
23+197.00 Full 9.00 6.00 54.00
217 23+228.00 Kanan 13.00 2.00 26.00
218 23+310.00 Kiri 4.00 3.00 12.00
219 23+313.00 Kanan 9.00 2.50 22.50
23+379.00 Kanan 12.00 3.00 36.00
220
23+391.00 Full 6.00 6.00 36.00
228 23+789.00 Full 20.00 6.00 120.00
229 23+827.00 Full 13.00 6.00 78.00
231 24+125.00 Kanan 5.00 2.00 10.00
233 24+330.00 Kanan 17.00 3.00 51.00
239 24+657.00 Kanan 6.00 2.50 15.00
257 25+605.00 Full 15.00 6.00 90.00
258 25+639.00 Kanan 13.00 3.00 39.00
259 25+658.00 Kiri 5.00 1.50 7.50
260 25+671.00 Kanan 3.00 2.00 6.00
26+340.00 Kanan 7.00 2.00 14.00
271
26+347.00 Kiri 8.00 4.00 32.00

276 26+452.00 Full 15.00 6.00 90.00


277 26+494.00 Kanan 6.00 3.00 18.00
280 26+707.00 Kanan 15.00 4.00 60.00
285 26+913.00 Kanan 10.00 2.40 24.00
286 26+944.00 Kanan 9.00 3.00 27.00
290 27+095.00 Kiri 15.00 4.00 60.00
27+588.00 Full 32.00 6.00 192.00
293
27+620.00 Kanan 13.00 3.00 39.00
294 27+644.00 Full 13.00 6.00 78.00
295 27+721.00 Kanan 3.00 4.00 12.00
297 28+351.00 Kiri 5.00 2.40 12.00
300 28+457.00 Full 9.00 6.00 54.00
301 28+476.00 Full 86.00 6.00 516.00
316 29+081.00 Full 9.00 6.00 54.00
317 29+980.00 Kanan 7.00 2.40 16.80
323 30+350.00 Full 27.00 6.00 162.00
325 30+425.00 Kanan 7.00 3.00 21.00
326 30+515.00 Kanan 5.00 3.00 15.00
329 30+858.00 Full 17.00 6.00 102.00
332 31+075.00 Full 13.00 6.00 78.00
334 31+210.00 Full 16.00 6.00 96.00
335 31+285.00 Full 8.00 6.00 48.00
338 31+346.00 Kanan 6.00 2.50 15.00
340 31+391.00 Kanan 8.00 2.40 19.20
341 31+408.00 Kanan 3.00 2.50 7.50
31+504.00 Kiri 6.00 3.00 18.00
346
31+510.00 Full 17.00 6.00 102.00
348 31+682.00 Kanan 5.00 2.50 12.50
31+754.00 Full 13.00 6.00 78.00
349
31+767.00 Kanan 11.00 3.00 33.00
351 31+925.00 Kanan 9.00 2.50 22.50
354 33+108.00 Kanan 7.00 2.50 17.50
356 33+250.00 Kanan 7.00 3.00 21.00
357 33+655.00 Kanan 8.00 2.40 19.20
358 33+750.00 Kanan 10.00 2.40 24.00
359 33+766.00 Kanan 12.00 2.40 28.80
33+810.00 Kanan 13.00 2.50 32.50
360
33+823.00 Full 7.00 6.00 42.00
327 33+932.00 Kanan 11.00 2.40 26.40
328 33+947.00 Kanan 20.00 2.40 48.00
329 33+973.00 Kanan 9.00 2.40 21.60
333 34+103.00 Kanan 7.00 3.00 21.00
336 34+230.00 Kanan 7.00 2.50 17.50
337 34+313.00 Kanan 26.00 2.50 65.00
338 34+345.00 Full 41.00 6.00 246.00
339 34+433.00 Full 12.00 6.00 72.00
341 34+575.00 Kiri 7.00 2.40 16.80
343 34+622.00 Full 30.00 6.00 180.00
349 34+743.00 Kanan 16.00 2.40 38.40

351 34+774.00 Kanan 12.00 4.00 48.00


353 34+829.00 Kanan 9.00 3.00 27.00
354 34+849.00 Full 16.00 6.00 96.00
355 34+874.00 Kanan 6.00 2.50 15.00
357 34+935.00 Kanan 5.00 2.40 12.00
34+962.00 Kanan 5.00 4.00 20.00
359
34+967.00 Kanan 7.00 2.40 16.80
360 34+977.00 Kiri 6.00 2.50 15.00
361 34+987.00 Kiri 10.00 2.40 24.00
362 35+000.00 Full 16.00 6.00 96.00
365 35+228.00 Kanan 6.00 2.50 15.00
367 35+307.00 Kanan 4.00 2.40 9.60
373 35+616.00 Kanan 12.00 2.40 28.80
376 35+676.00 Kanan 15.00 3.00 45.00
377 35+748.00 Kanan 10.00 2.40 24.00
378 35+776.00 Kanan 6.00 2.50 15.00
379 35+790.00 Kanan 3.00 2.50 7.50
381 35+823.00 Kanan 12.00 3.00 36.00
382 35+840.00 Kanan 8.00 2.40 19.20
385 38+098.00 Kanan 7.00 2.40 16.80
397 38+408.00 Kiri 3.00 2.00 6.00
400 38+842.00 Kanan 11.00 2.00 22.00
401 38+940.00 Kanan 6.00 2.50 15.00
402 38+985.00 Kanan 9.00 2.50 22.50
403 39+033.00 Kiri 6.00 3.50 21.00
404 39+050.00 Kanan 6.00 3.00 18.00
405 39+056.00 Kiri 5.00 1.50 7.50
407 39+094.00 Kanan 4.00 2.50 10.00
408 39+101.00 Full 35.00 6.00 210.00
409 39+325.00 Full 33.00 6.00 198.00
410 39+390.00 Kanan 12.00 2.50 30.00
411 39+535.00 Kiri 4.00 2.00 8.00
412 39+910.00 Kanan 5.00 3.00 15.00
413 40+006.00 Kanan 10.00 3.00 30.00
414 40+049.00 Kanan 5.00 3.00 15.00
415 40+085.00 Kanan 24.00 3.00 72.00
416 40+118.00 Kanan 14.00 3.00 42.00
418 40+152.00 Kanan 3.00 2.00 6.00
419 40+166.00 Kanan 8.00 2.50 20.00
40+203.00 Kanan 12.00 3.00 36.00
420
40+215.00 Full 6.00 6.00 36.00
422 40+711.00 Kanan 9.00 3.00 27.00
423 40+722.00 Kiri 6.00 3.50 21.00
424 40+825.00 Full 10.00 6.00 60.00
425 40+865.00 Kanan 9.00 3.00 27.00
426 40+953.00 Kanan 8.00 3.00 24.00
427 41+043.00 Kanan 10.00 2.00 20.00
428 41+127.00 Kanan 10.00 3.00 30.00
429 41+143.00 Full 20.00 6.00 120.00
430 41+325.00 Kanan 6.00 3.00 18.00
433 42+302.00 Kanan 7.00 2.00 14.00

Total 11,677.70
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PENUNJANG/HOLDING RUNTU - SIMPANG RUNTU


NILAI PEKERJAAN : Rp. 1.603.675.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.1.(4) Perbaikan Lapis Pondasi Agregat Kelas A M3 4,826.20 x 0.1249 302.82 927,140.00 280,756,534.80 602.57 558,670,701.00

10.1.(9) Perbaikan Campuran Aspal Panas M3 4,826.20 x 0.05 315.89 3,726,390.00 1,177,129,337.10 241.31 899,215,170.90

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 1,457,885,871.90 1,457,885,871.90
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 145,788,587.19 145,788,587.19
C Jumlah Total Harga Pekerjaan = (A) + (B) 1,603,674,459.09 1,603,674,459.09
D Jumlah Total Harga Pekerjaan (Dibulatkan) 1,603,675,000.00 1,603,675,000.00
DATA SURVEY
PENUNJANG/HOLDING RUNTU - SIMPANG RUNTU

Perbaikan Lapis Pondasi Agregat Kelas A


No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

1 00+352.00 Kanan 9.00 2.40 21.60


8 00+855.00 Kanan 7.00 2.40 16.80
9 00+895.00 Kanan 6.00 2.40 14.40
39 05+183.00 Kanan 17.00 2.50 42.50
05+279.00 Full 14.00 6.00 84.00
41
05+293.00 Kanan 11.00 3.00 33.00
49 05+562.00 Full 20.00 6.00 120.00
05+984.00 Full 5.00 6.00 30.00
52
05+989.00 Kanan 16.00 3.00 48.00
55 06+102.00 Kanan 48.00 3.00 144.00
06+161.00 Full 32.00 6.00 192.00
56
06+193.00 Kiri 10.00 2.40 24.00
58 06+415.00 Kanan 5.00 2.40 12.00
06+484.00 Kanan 3.00 3.00 9.00
61
06+487.00 Full 4.00 6.00 24.00
63 06+539.00 Full 25.00 6.00 150.00
06+616.00 Full 20.00 6.00 120.00
64 06+636.00 Kanan 26.00 3.00 78.00
06+662.00 Full 20.00 6.00 120.00
66 06+732.00 Full 20.00 6.00 120.00
06+852.00 Kanan 18.00 3.00 54.00
67
06+870.00 Kanan 6.00 2.40 14.40
71 06+959.00 Kanan 9.00 3.20 28.80
73 07+043.00 Full 14.00 6.00 84.00
07+066.00 Full 30.00 6.00 180.00
74
07+096.00 Kanan 16.00 2.40 38.40
78 07+433.00 Kanan 9.00 3.00 27.00
80 07+641.00 Kanan 6.00 2.40 14.40
81 07+750.00 Full 10.00 6.00 60.00
83 07+874.00 Full 18.00 6.00 108.00
85 07+942.00 Tengah 3.00 2.40 7.20
87 08+373.00 Kanan 16.00 2.50 40.00
08+402.00 Kanan 17.00 3.00 51.00
88
08+419.00 Full 16.00 6.00 96.00
08+525.00 Kanan 6.00 2.40 14.40
90
08+531.00 Kanan 12.00 3.00 36.00
92 08+564.00 Full 10.00 6.00 60.00
93 08+585.00 Kanan 5.00 3.00 15.00
95 08+643.00 Kanan 5.00 3.00 15.00
97 08+733.00 Kanan 14.00 4.00 56.00
98 08+778.00 Kanan 14.00 2.50 35.00
101 08+876.00 Kanan 20.00 2.40 48.00
103 09+010.00 Kanan 8.00 2.40 19.20
104 09+427.00 Kanan 4.00 3.00 12.00
105 09+760.00 Kanan 7.00 2.40 16.80
106 09+798.00 Kanan 5.00 2.40 12.00
108 10+066.00 Kanan 9.00 3.00 27.00
109 10+267.00 Kanan 7.00 2.40 16.80
110 10+375.00 Kanan 5.00 2.40 12.00
112 10+630.00 Kanan 6.00 3.00 18.00
113 10+840.00 Kanan 8.00 3.50 28.00
114 10+914.00 Kanan 6.00 2.50 15.00
115 11+077.00 Kanan 4.00 2.50 10.00
116 11+095.00 Kanan 7.00 3.20 22.40
117 11+105.00 Kanan 5.00 3.00 15.00
118 11+290.00 Kanan 6.00 2.40 14.40
119 11+430.00 Kanan 6.00 2.40 14.40
120 11+449.00 Kiri 7.00 3.50 24.50
121 11+730.00 Kanan 13.00 2.40 31.20
122 11+808.00 Full 15.00 6.00 90.00
124 11+954.00 Kanan 17.00 3.00 51.00
13+917.00 Full 30.00 6.00 180.00
142
13+947.00 Kanan 13.00 3.00 39.00
143 14+193.00 Full 12.00 6.00 72.00
146 14+811.00 Kanan 8.00 2.40 19.20
147 14+850.00 Kanan 8.00 2.40 19.20
148 14+928.00 Kanan 7.00 2.40 16.80
149 15+400.00 Kanan 6.00 2.40 14.40
150 15+487.00 Kanan 5.00 2.40 12.00
152 15+570.00 Kanan 12.00 3.00 36.00
15+608.00 Full 11.00 6.00 66.00
153
15+619.00 Kiri 14.00 3.00 42.00
155 16+499.00 Full 75.00 6.00 450.00
16+640.00 Full 20.00 6.00 120.00
158
16+660.00 Kanan 16.00 3.00 48.00
16+698.00 Full 80.00 6.00 480.00
159
16+778.00 Kanan 12.00 3.00 36.00
160 16+717.00 Kanan 10.00 3.00 30.00
161 16+737.00 Kanan 15.00 3.00 45.00
16+757.00 Kanan 12.00 3.00 36.00
162
16+769.00 Full 13.00 6.00 78.00
163 16+786.00 Kanan 17.00 3.00 51.00

Total 4,826.20
Perbaikan Campuran Aspal Panas
No. Panjang Lebar Luas
STA. Posisi Ket.
Titik (M) (M) (M2)

1 00+352.00 Kanan 9.00 2.40 21.60


8 00+855.00 Kanan 7.00 2.40 16.80
9 00+895.00 Kanan 6.00 2.40 14.40
39 05+183.00 Kanan 17.00 2.50 42.50
05+279.00 Full 14.00 6.00 84.00
41
05+293.00 Kanan 11.00 3.00 33.00
49 05+562.00 Full 20.00 6.00 120.00
05+984.00 Full 5.00 6.00 30.00
52
05+989.00 Kanan 16.00 3.00 48.00
55 06+102.00 Kanan 48.00 3.00 144.00
06+161.00 Full 32.00 6.00 192.00
56
06+193.00 Kiri 10.00 2.40 24.00
58 06+415.00 Kanan 5.00 2.40 12.00
06+484.00 Kanan 3.00 3.00 9.00
61
06+487.00 Full 4.00 6.00 24.00
63 06+539.00 Full 25.00 6.00 150.00
06+616.00 Full 20.00 6.00 120.00
64 06+636.00 Kanan 26.00 3.00 78.00
06+662.00 Full 20.00 6.00 120.00
66 06+732.00 Full 20.00 6.00 120.00
06+852.00 Kanan 18.00 3.00 54.00
67
06+870.00 Kanan 6.00 2.40 14.40
71 06+959.00 Kanan 9.00 3.20 28.80
73 07+043.00 Full 14.00 6.00 84.00
07+066.00 Full 30.00 6.00 180.00
74
07+096.00 Kanan 16.00 2.40 38.40
78 07+433.00 Kanan 9.00 3.00 27.00
80 07+641.00 Kanan 6.00 2.40 14.40
81 07+750.00 Full 10.00 6.00 60.00
83 07+874.00 Full 18.00 6.00 108.00
85 07+942.00 Tengah 3.00 2.40 7.20
87 08+373.00 Kanan 16.00 2.50 40.00
08+402.00 Kanan 17.00 3.00 51.00
88
08+419.00 Full 16.00 6.00 96.00
08+525.00 Kanan 6.00 2.40 14.40
90
08+531.00 Kanan 12.00 3.00 36.00
92 08+564.00 Full 10.00 6.00 60.00
93 08+585.00 Kanan 5.00 3.00 15.00
95 08+643.00 Kanan 5.00 3.00 15.00
97 08+733.00 Kanan 14.00 4.00 56.00
98 08+778.00 Kanan 14.00 2.50 35.00
101 08+876.00 Kanan 20.00 2.40 48.00
103 09+010.00 Kanan 8.00 2.40 19.20
104 09+427.00 Kanan 4.00 3.00 12.00
105 09+760.00 Kanan 7.00 2.40 16.80
106 09+798.00 Kanan 5.00 2.40 12.00
108 10+066.00 Kanan 9.00 3.00 27.00

109 10+267.00 Kanan 7.00 2.40 16.80


110 10+375.00 Kanan 5.00 2.40 12.00
112 10+630.00 Kanan 6.00 3.00 18.00
113 10+840.00 Kanan 8.00 3.50 28.00
114 10+914.00 Kanan 6.00 2.50 15.00
115 11+077.00 Kanan 4.00 2.50 10.00
116 11+095.00 Kanan 7.00 3.20 22.40
117 11+105.00 Kanan 5.00 3.00 15.00
118 11+290.00 Kanan 6.00 2.40 14.40
119 11+430.00 Kanan 6.00 2.40 14.40
120 11+449.00 Kiri 7.00 3.50 24.50
121 11+730.00 Kanan 13.00 2.40 31.20
122 11+808.00 Full 15.00 6.00 90.00
124 11+954.00 Kanan 17.00 3.00 51.00
13+917.00 Full 30.00 6.00 180.00
142
13+947.00 Kanan 13.00 3.00 39.00
143 14+193.00 Full 12.00 6.00 72.00
146 14+811.00 Kanan 8.00 2.40 19.20
147 14+850.00 Kanan 8.00 2.40 19.20
148 14+928.00 Kanan 7.00 2.40 16.80
149 15+400.00 Kanan 6.00 2.40 14.40
150 15+487.00 Kanan 5.00 2.40 12.00
152 15+570.00 Kanan 12.00 3.00 36.00
15+608.00 Full 11.00 6.00 66.00
153
15+619.00 Kiri 14.00 3.00 42.00
155 16+499.00 Full 75.00 6.00 450.00
16+640.00 Full 20.00 6.00 120.00
158
16+660.00 Kanan 16.00 3.00 48.00
16+698.00 Full 80.00 6.00 480.00
159
16+778.00 Kanan 12.00 3.00 36.00
160 16+717.00 Kanan 10.00 3.00 30.00
161 16+737.00 Kanan 15.00 3.00 45.00
16+757.00 Kanan 12.00 3.00 36.00
162
16+769.00 Full 13.00 6.00 78.00
163 16+786.00 Kanan 17.00 3.00 51.00

Total 4,826.20
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN BERKALA JEMBATAN SEI ARUT


NILAI PEKERJAAN : Rp. 240.651.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01


No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 7. STRUKTUR
7.6 (1) Pondasi Cerucuk, Penyediaan dan Pemancangan M1 600.00 14,739.00 8,843,400.00 600.00 8,843,400.00
7.10.(3a) Bronjong dengan Kawat yang dilapisi Galvanis M3 88.02 956,164.00 84,161,555.28 88.02 84,161,555.28

DIVISI 8. REHABILITASI JEMBATAN


8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe M1 7 x 3 21.00 2,393,752.00 50,268,792.00 21.00 50,268,792.00
Asphaltic Plug

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.2.(1) Pemeliharaan Rutin Jembatan Sei Arut LS 1.00 75,500,000.00 75,500,000.00

- Pembersihan M1 92 x 7 40,380.00 644.00 26,004,720.00


- Beton Strukur, fc’20 Mpa M3 14 x 2 x 0.20 x 4 2,227,712.00 22.22 49,495,280.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 218,773,747.28 218,773,747.28
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 21,877,374.73 21,877,374.73
C Jumlah Total Harga Pekerjaan = (A) + (B) 240,651,122.01 240,651,122.01
D Jumlah Total Harga Pekerjaan (Dibulatkan) 240,651,000.00 240,651,000.00
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN BERKALA JEMBATAN SEI KUNUP


NILAI PEKERJAAN : Rp. 216.743.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 7. STRUKTUR
7.6 (1) Pondasi Cerucuk, Penyediaan dan Pemancangan M1 1,272.00 14,739.00 18,748,008.00 1,272.00 18,748,008.00
7.10.(3a) Bronjong dengan Kawat yang dilapisi Galvanis M3 108.00 956,164.00 103,265,712.00 108.00 103,265,712.00
7.14.(1) Papan Nama Jembatan Buah 2.00 756,208.00 1,512,416.00 2.00 1,512,416.00

DIVISI 8. REHABILITASI JEMBATAN


8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe M1 7 x 2 14.00 2,393,752.00 33,512,528.00 14.00 33,512,528.00
Asphaltic Plug

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.2.(2) Pemeliharaan Rutin Jembatan Sei Kunup LS 1.00 40,000,000.00 40,000,000.00

- Pembersihan M1 20 x 7 40,380.00 140.00 5,653,200.00


- Beton Strukur, fc’20 Mpa M3 13 x 1.5 x 0.20 x 4 2,227,712.00 15.42 34,346,800.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 197,038,664.00 197,038,664.00
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 19,703,866.40 19,703,866.40
C Jumlah Total Harga Pekerjaan = (A) + (B) 216,742,530.40 216,742,530.40
D Jumlah Total Harga Pekerjaan (Dibulatkan) 216,743,000.00 216,743,000.00
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN BERKALA JEMBATAN SEI BUKIT SINTANG


NILAI PEKERJAAN : Rp. 288.053.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 8. REHABILITASI JEMBATAN


8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe M1 7.07 x 8 ( Dilapangan 6 ) 56.55 2,393,752.00 135,366,675.60 56.55 135,366,675.60
Asphaltic Plug

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.2.(3) Pemeliharaan Rutin Jembatan Sei Bukit Sintang LS 1.00 126,500,000.00 126,500,000.00

- Pembersihan M1 94 x 7 40,380.00 658.00 26,570,040.00


- Beton Strukur, fc’20 Mpa M3 17 x 2 x 0.20 x 4 2,227,712.00 26.79 59,684,948.00
- Perbaikan Campuran Aspal Panas M3 45 x 6 x 0.04 (Awal 23 & Akhir 22) 3,726,390.00 10.80 40,245,012.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 261,866,675.60 261,866,675.60
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 26,186,667.56 26,186,667.56
C Jumlah Total Harga Pekerjaan = (A) + (B) 288,053,343.16 288,053,343.16
D Jumlah Total Harga Pekerjaan (Dibulatkan) 288,053,000.00 288,053,000.00
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN BERKALA JEMBATAN SEI RIMBA


NILAI PEKERJAAN : Rp. 200.319.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 7. STRUKTUR
7.1 (5a) Beton Struktur, fc’30 Mpa M3 1.02 2,510,434.00 2,560,642.68 1.02 2,560,642.68
7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 52.05 25,030.00 1,302,811.50 52.05 1,302,811.50
7.6 (1) Pondasi Cerucuk, Penyediaan dan Pemancangan M1 920.00 14,739.00 13,559,880.00 920.00 13,559,880.00
7.10.(3a) Bronjong dengan Kawat yang dilapisi Galvanis M3 99.00 956,164.00 94,660,236.00 99.00 94,660,236.00
7.14.(1) Papan Nama Jembatan Buah 2.00 756,208.00 1,512,416.00 2.00 1,512,416.00

DIVISI 8. REHABILITASI JEMBATAN


8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe M1 7 x 2 14.00 2,393,752.00 33,512,528.00 14.00 33,512,528.00
Asphaltic Plug

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.2.(6) Pemeliharaan Rutin Jembatan Sei Rimba LS 1.00 35,000,000.00 35,000,000.00

- Pembersihan M1 15 x 7 40,380.00 105.00 4,239,900.00


- Beton Strukur, fc’20 Mpa M 3
11 x 1.6 x 0.20 x 4 2,227,712.00 13.81 30,760,100.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 182,108,514.18 182,108,514.18
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 18,210,851.42 18,210,851.42
C Jumlah Total Harga Pekerjaan = (A) + (B) 200,319,365.60 200,319,365.60
D Jumlah Total Harga Pekerjaan (Dibulatkan) 200,319,000.00 200,319,000.00
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN BERKALA JEMBATAN SEI SELAT I


NILAI PEKERJAAN : Rp. 260.852.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa M3 20.91 x 2 x 4 167.28 36,960.00 6,182,668.80 167.28 6,182,668.80

DIVISI 6. PERKERASAN ASPAL


6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 25 x 7 x 0.35 61.25 19,410.00 1,188,862.50 61.25 1,188,862.50
6.3(5a) Laston Lapis Aus (AC-WC) Ton 25 x 7 x 0.04 7.00 1,476,571.00 10,335,997.00 7.00 10,335,997.00

DIVISI 7. STRUKTUR
7.1 (5a) Beton Struktur, fc’30 Mpa M3 0.90 x 0.40 x 0.33 0.12 2,510,434.00 301,252.08 0.12 301,252.08
7.6 (1) Pondasi Cerucuk, Penyediaan dan Pemancangan M1 2,432.00 14,739.00 35,845,248.00 2,432.00 35,845,248.00
7.9.(1) Pasangan Batu M3 130.22 1,057,685.00 137,731,740.70 130.22 137,731,740.70
7.14.(1) Papan Nama Jembatan Buah 2.00 756,208.00 1,512,416.00 2.00 1,512,416.00

DIVISI 8. REHABILITASI JEMBATAN


8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe M1 7 x 2 14.00 2,393,752.00 33,512,528.00 14.00 33,512,528.00
Asphaltic Plug

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.2.(5) Patok Pengarah Buah 8.00 153,464.00 1,227,712.00 8.00 1,227,712.00

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.2.(8) Pemeliharaan Rutin Jembatan Sei Selat I LS 1.00 9,300,000.00 9,300,000.00

- Beton Strukur, fc’20 Mpa M3 3.5 x 1.5 x 0.20 x 4 2,227,712.00 4.17 9,300,000.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 237,138,425.08 237,138,425.08
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 23,713,842.51 23,713,842.51
C Jumlah Total Harga Pekerjaan = (A) + (B) 260,852,267.59 260,852,267.59
D Jumlah Total Harga Pekerjaan (Dibulatkan) 260,852,000.00 260,852,000.00
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN BERKALA JEMBATAN SEI SELAT III


NILAI PEKERJAAN : Rp. 98.437.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 6. PERKERASAN ASPAL


6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 32 x 7 x 0.35 49.00 19,410.00 951,090.00 78.40 1,521,744.00
6.3(5a) Laston Lapis Aus (AC-WC) Ton 32 x 7 x 0.04 7.00 1,476,571.00 10,335,997.00 8.96 13,230,076.16

DIVISI 7. STRUKTUR
7.1 (5a) Beton Struktur, fc’30 Mpa M3 1.00 x 0.45 x 0.35 2.42 2,510,434.00 6,075,250.28 0.16 396,845.57
7.14.(1) Papan Nama Jembatan Buah 2.00 756,208.00 1,512,416.00 2.00 1,512,416.00

DIVISI 8. REHABILITASI JEMBATAN


8.2.(1) Penambahan (Patching) M3 3.50 x 1.50 x 0.20 1.00 4,372,791.00 4,372,791.00 1.05 4,591,430.55
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe M1 7 x 2 14.00 2,393,752.00 33,512,528.00 14.00 33,512,528.00
Asphaltic Plug

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.2.(5) Patok Pengarah Buah 8.00 153,464.00 1,227,712.00 21.00 3,222,744.00

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.2.(11) Pemeliharaan Rutin Jembatan Sei Selat III LS 1.00 31,500,000.00 31,500,000.00

- Pembersihan M1 20 x 7 40,380.00 140.00 5,653,200.00


- Beton Strukur, fc’20 Mpa M3 8.6 x 1.7 x 0.20 x 4 2,227,712.00 11.60 25,846,800.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 89,487,784.28 89,487,784.28
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 8,948,778.43 8,948,778.43
C Jumlah Total Harga Pekerjaan = (A) + (B) 98,436,562.71 98,436,562.71
D Jumlah Total Harga Pekerjaan (Dibulatkan) 98,437,000.00 98,437,000.00
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN BERKALA JEMBATAN BOX RUNTU 22.3


NILAI PEKERJAAN : Rp. 81.761.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 7. STRUKTUR
7.1 (7a) Beton Strukur, fc’20 MPa M3 11.429 x 7 x 0.20 16.00 2,227,712.00 35,643,392.00 16.00 35,643,392.00
7.10.(3a) Bronjong dengan Kawat yang dilapisi Galvanis M3 30.00 956,164.00 28,684,920.00 30.00 28,684,920.00

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.2.(14) Pemeliharaan Rutin Jembatan Box Runtu 22.3 LS 1.00 10,000,000.00 10,000,000.00

- Pembersihan M1 7 x 7 40,380.00 49.00 1,978,620.00


- Beton Strukur, fc’20 Mpa M3 2.6 x 7 x 0.20 2,227,712.00 3.60 8,021,380.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 74,328,312.00 74,328,312.00
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 7,432,831.20 7,432,831.20
C Jumlah Total Harga Pekerjaan = (A) + (B) 81,761,143.20 81,761,143.20
D Jumlah Total Harga Pekerjaan (Dibulatkan) 81,761,000.00 81,761,000.00
PAKET PEKERJAAN : PRESERVASI JALAN KUJAN - RUNTU - SIMPANG RUNTU
NOMOR KONTRAK : HK 0201-Bb29.5.1/KTRK/03, TANGGAL 05 JANUARI 2022
NILAI KONTRAK : Rp. 35.855.000.000,00

LINGKUP PEKERJAAN : PEMELIHARAAN RUTIN JEMBATAN KUJAN - RUNTU - SIMPANG RUNTU


NILAI PEKERJAAN : Rp. 545.050.000,00
TAHUN ANGGARAN : 2022

KONTRAK AWAL ADD - 01

No. Mata
Uraian Satuan Perhitungan Harga Satuan Jumlah Harga Jumlah Harga
Pembayaran Kuantitas Kuantitas
(Rupiah) (Rupiah) (Rupiah)

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.2.(4) Pemeliharaan Rutin Jembatan Box Runtu 12 LS 1.00 10,000,000.00 10,000,000.00
- Pembersihan M1 6 x 7 40,380.00 42.00 1,695,960.00
- Beton Strukur, fc’20 Mpa M3 2.69 x 7 x 0.20 2,227,712.00 3.73 8,304,040.00

10.2.(5) Pemeliharaan Rutin Jembatan Box Runtu 13 LS 1.00 10,000,000.00 10,000,000.00


- Pembersihan M1 6 x 7 40,380.00 42.00 1,695,960.00
- Beton Strukur, fc’20 Mpa M3 2.69 x 7 x 0.20 2,227,712.00 3.73 8,304,040.00

10.2.(7) Pemeliharaan Rutin Jembatan Sei Sababilah LS 1.00 150,000,000.00 150,000,000.00


- Pembersihan M1 16 x 7 40,380.00 112.00 4,522,560.00
- Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 7 x 2 2,393,752.00 14.00 33,512,528.00
- Papan Nama Jembatan Buah 756,208.00 2.00 1,512,416.00
- Beton Strukur, fc’20 Mpa M3 16.5 x 6.80 x 0.20 (0,018 M3 Parapet) 2,227,712.00 22.23 49,531,689.05
- Pondasi Cerucuk, Penyediaan dan Pemancangan M1 (15/0,3)x(0,80/0,3)x3x2sisi 14,739.00 794.00 11,702,766.00
- Pasangan Batu M3 15 x 1.03 x 2 Sisi 1,057,685.00 30.75 32,523,813.75
- Perbaikan Campuran Aspal Panas M3 16 x 7.00 x 0.04 3,726,390.00 4.48 16,694,227.20

10.2.(9) Pemeliharaan Rutin Jembatan Box Runtu 18 LS 1.00 10,000,000.00 10,000,000.00


- Pembersihan M1 20 x 12.382 40,380.00 247.65 10,000,000.00

10.2.(10) Pemeliharaan Rutin Jembatan Selat II LS 1.00 80,000,000.00 80,000,000.00


- Pembersihan M1 25 x 7 40,380.00 175.00 7,066,500.00
- Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 7 x 2 2,393,752.00 14.00 33,512,528.00
- Papan Nama Jembatan Buah 756,208.00 2.00 1,512,416.00
- Patok Pengarah Buah 153,464.00 9.00 1,381,176.00
- Beton Strukur, fc’20 Mpa M3 10.36 x 2 x 0.20 x 4 2,227,712.00 16.40 36,527,380.00

10.2.(12) Pemeliharaan Rutin Jembatan Sei Sulung I LS 1.00 135,000,000.00 135,000,000.00


- Pembersihan M1 20 x 7 40,380.00 140.00 5,653,200.00
- Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 7 x 2 2,393,752.00 14.00 33,512,528.00
- Papan Nama Jembatan Buah 756,208.00 2.00 1,512,416.00
- Patok Pengarah Buah 153,464.00 6.00 920,784.00
- Pondasi Cerucuk, Penyediaan dan Pemancangan M1 (18/0,3)x(2/0,3)x3 14,739.00 1,197.00 17,642,583.00
- Bronjong dengan Kawat yang dilapisi Galvanis M3 18 x 2.00 x 1 956,164.00 36.00 34,421,904.00
- Beton Strukur, fc’20 Mpa M3 13.03 x 1.8 x 0.20 x 4 2,227,712.00 18.56 41,336,585.00
10.2.(13) Pemeliharaan Rutin Jembatan Sei Sulat LS 1.00 75,500,000.00 75,500,000.00
- Pembersihan M1 20 x 7 40,380.00 140.00 5,653,200.00
- Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 7 x 2 2,393,752.00 14.00 33,512,528.00
- Papan Nama Jembatan Buah 756,208.00 2.00 1,512,416.00
- Patok Pengarah Buah 153,464.00 3.00 460,392.00
- Beton Strukur, fc’20 Mpa M3 10.83 x 1.8 x 0.20 x 4 2,227,712.00 15.42 34,361,464.00

10.2.(15) Pemeliharaan Rutin Jembatan Box Bandang LS 1.00 10,000,000.00 10,000,000.00


- Pembersihan M1 6 x 4.4 40,380.00 26.17 1,056,664.00
- Perbaikan Campuran Aspal Panas 10 x 6 x 0.04 3,726,390.00 2.40 8,943,336.00

10.2.(16) Pemeliharaan Rutin Jembatan Sei Kujang LS 1.00 15,000,000.00 15,000,000.00


- Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 6.27 x 1 2,393,752.00 6.27 15,000,000.00

A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 495,500,000.00 495,500,000.00
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 49,550,000.00 49,550,000.00
C Jumlah Total Harga Pekerjaan = (A) + (B) 545,050,000.00 545,050,000.00
D Jumlah Total Harga Pekerjaan (Dibulatkan) 545,050,000.00 545,050,000.00
DATA SURVEY
RUAS JALAN RUNTU - SP. RUNTU
RENCANA REALISASI
Panjang Lebar Luas Panjang Lebar Luas
No. STA. Posisi Lingkup Ket.
(M) (M) (M2) (M) (M) (M2)

1 00+352.00 Kanan 9.00 2.40 21.60 Rutin Jalan LPA


2 00+395.00 Kanan 60.00 2.40 144.00 Rutin Jalan CAP
3 00+460.00 Kanan 23.00 1.50 34.50 Rutin Jalan CAP
4 00+530.00 Kanan 27.00 2.40 64.80 Rutin Jalan
00+574.00 Kanan 16.00 3.20 51.20 Rutin Jalan CAP
5
00+590.00 Kanan 20.00 2.40 48.00 Rutin Jalan CAP
6 00+674.00 Kanan 7.00 2.40 16.80 Rutin Jalan CAP
7 00+711.00 Kanan 12.00 2.40 28.80 Rutin Jalan
8 00+855.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
9 00+895.00 Kanan 6.00 2.40 14.40 Rutin Jalan LPA
10 00+917.00 Kanan 5.00 2.40 12.00 Rutin Jalan CAP
11 00+957.00 Kanan 6.00 2.40 14.40 Rutin Jalan CAP
12 00+976.00 Kiri 6.00 4.00 24.00 Rutin Jalan CAP
13 01+023.00 Kanan 8.00 2.40 19.20 Rutin Jalan
14 01+095.00 Kanan 3.00 3.00 9.00 Rutin Jalan CAP
15 01+112.00 Kanan 11.00 2.50 27.50 Rutin Jalan
16 01+300.00 Kanan 6.00 3.00 18.00 Rutin Jalan LPA
17 01+315.00 Full 12.00 6.00 72.00 Rutin Jalan LPA
18 02+770.00 Kanan 21.00 3.00 63.00 Rutin Jalan CAP
19 02+800.00 Full 11.00 6.00 66.00 Rutin Jalan CAP
20 02+816.00 Tengah 2.00 2.00 4.00 Rutin Jalan CAP
21 02+836.00 Kanan 4.00 3.00 12.00 Rutin Jalan
22 02+894.00 Kiri 3.00 2.40 7.20 Rutin Jalan CAP
23 02+915.00 Kiri 17.00 1.20 20.40 Rutin Jalan CAP
24 02+980.00 Kanan 11.00 3.00 33.00 Rutin Jalan LPA
25 03+036.00 Full 10.00 6.00 60.00 Rutin Jalan LPA
26 03+054.00 Kanan 6.00 3.00 18.00 Rutin Jalan CAP
27 03+075.00 Kanan 4.00 3.00 12.00 Rutin Jalan
28 04+470.00 Kanan 12.00 3.00 36.00 Rutin Jalan CAP
04+490.00 Kanan 20.00 2.40 48.00 Rutin Jalan CAP
29
04+510.00 Full 26.00 6.00 156.00 Rutin Jalan
04+553.00 Full 13.00 6.00 78.00 Rutin Jalan CAP
30
04+566.00 Kanan 19.00 3.00 57.00 Rutin Jalan CAP
04+650.00 Full 14.00 6.00 84.00 Rutin Jalan CAP
31 04+664.00 Kanan 27.00 3.00 81.00 Rutin Jalan CAP
04+691.00 Tengah 36.00 2.50 90.00 Rutin Jalan CAP
32 04+738.00 Kanan 23.00 3.00 69.00 Rutin Jalan
33 04+789.00 Kanan 10.00 3.00 30.00 Rutin Jalan CAP
34 04+869.00 Full 20.00 6.00 120.00 Rutin Jalan LPA
35 04+932.00 Kanan 13.00 2.40 31.20 Rutin Jalan CAP
36 04+960.00 Kiri 13.00 2.40 31.20 Rutin Jalan CAP
05+000.00
37 05+109.00 Kanan 7.00 2.50 17.50 Holding CAP
38 05+131.00 Kanan 12.00 2.40 28.80 Holding CAP
39 05+183.00 Kanan 17.00 2.50 42.50 Holding LPA
40 05+230.00 Kanan 4.00 2.50 10.00 Holding
05+279.00 Full 14.00 6.00 84.00 Holding LPA
41
05+293.00 Kanan 11.00 3.00 33.00 Holding LPA
42 05+326.00 Kanan 16.00 3.00 48.00 Holding
43 05+353.00 Kanan 4.00 3.00 12.00 Holding
44 05+378.00 Kanan 22.00 3.00 66.00 Holding CAP
45 05+420.00 Kanan 3.00 2.50 7.50 Holding CAP
46 05+479.00 Full 50.00 6.00 300.00 Holding CAP
47 05+532.00 Kanan 3.00 2.40 7.20 Holding
05+537.00 Kiri 4.00 3.00 12.00 Holding CAP
48
05+541.00 Full 4.00 6.00 24.00 Holding CAP
49 05+562.00 Full 20.00 6.00 120.00 Holding LPA
50 05+725.00 Kanan 8.00 2.40 19.20 Holding
51 05+905.00 Kanan 51.00 2.40 122.40 Holding
05+984.00 Full 5.00 6.00 30.00 Holding LPA
52
05+989.00 Kanan 16.00 3.00 48.00 Holding LPA
53 06+054.00 Kiri 9.00 2.40 21.60 Holding CAP
54 06+056.00 Kanan 4.00 2.40 9.60 Holding
06+102.00 Kiri 48.00 3.00 144.00 Holding CAP
55
06+102.00 Kanan 48.00 3.00 144.00 Holding LPA
06+161.00 Full 32.00 6.00 192.00 Holding LPA
56
06+193.00 Kiri 10.00 2.40 24.00 Holding LPA
57 06+236.00 Kanan 28.00 3.20 89.60 Holding CAP
58 06+415.00 Kanan 5.00 2.40 12.00 Holding LPA
59 06+432.00 Kiri 6.00 2.40 14.40 Holding CAP
60 06+432.00 Kanan 6.00 2.40 14.40 Holding CAP
06+484.00 Kanan 3.00 3.00 9.00 Holding LPA
61
06+487.00 Full 4.00 6.00 24.00 Holding LPA
62 06+505.00 Kanan 11.00 3.00 33.00 Holding CAP
06+519.00 Kanan 20.00 2.40 48.00 Holding CAP
63
06+539.00 Full 25.00 6.00 150.00 Holding LPA
06+590.00 Kanan 26.00 3.00 78.00 Holding CAP
06+616.00 Full 20.00 6.00 120.00 Holding LPA
64
06+636.00 Kanan 26.00 3.00 78.00 Holding LPA
06+662.00 Full 20.00 6.00 120.00 Holding LPA
06+712.00 Kanan 5.00 3.00 15.00 Holding CAP
65
06+717.00 Full 7.00 6.00 42.00 Holding CAP
66 06+732.00 Full 20.00 6.00 120.00 Holding LPA
06+852.00 Kanan 18.00 3.00 54.00 Holding LPA
67
06+870.00 Kanan 6.00 2.40 14.40 Holding LPA
06+880.00 Kanan 7.00 2.80 19.60 Holding
68
06+887.00 Kanan 4.00 2.40 9.60 Holding
69 06+895.00 Kanan 3.00 2.40 7.20 Holding CAP
70 06+925.00 Kanan 10.00 2.40 24.00 Holding
71 06+959.00 Kanan 9.00 3.20 28.80 Holding LPA
72 06+998.00 Kanan 5.00 2.40 12.00 Holding CAP
73 07+043.00 Full 14.00 6.00 84.00 Holding LPA
07+066.00 Full 30.00 6.00 180.00 Holding LPA
74
07+096.00 Kanan 16.00 2.40 38.40 Holding LPA
76 07+381.00 Kanan 6.00 2.40 14.40 Holding CAP
77 07+425.00 Kiri 4.00 2.50 10.00 Holding CAP
78 07+433.00 Kanan 9.00 3.00 27.00 Holding LPA
79 07+451.00 Kanan 7.00 2.40 16.80 Holding CAP
80 07+641.00 Kanan 6.00 2.40 14.40 Holding LPA
81 07+750.00 Full 10.00 6.00 60.00 Holding LPA
82 07+800.00 Kanan 10.00 3.00 30.00 Holding CAP
83 07+874.00 Full 18.00 6.00 108.00 Holding LPA
84 07+925.00 Kanan 13.00 2.50 32.50 Holding
85 07+942.00 Tengah 3.00 2.40 7.20 Holding LPA
86 08+044.00 Full 19.00 6.00 114.00 Holding CAP
87 08+373.00 Kanan 16.00 2.50 40.00 Holding LPA
08+402.00 Kanan 17.00 3.00 51.00 Holding LPA
88
08+419.00 Full 16.00 6.00 96.00 Holding LPA
89 08+498.00 Kanan 19.00 3.00 57.00 Holding CAP
08+525.00 Kanan 6.00 2.40 14.40 Holding LPA
90
08+531.00 Kanan 12.00 3.00 36.00 Holding LPA
91 08+549.00 Kiri 8.00 2.40 19.20 Holding CAP
92 08+564.00 Full 10.00 6.00 60.00 Holding LPA
93 08+585.00 Kanan 5.00 3.00 15.00 Holding LPA
94 08+599.00 Tengah 4.00 2.40 9.60 Holding CAP
95 08+643.00 Kanan 5.00 3.00 15.00 Holding LPA
96 08+690.00 Kanan 10.00 2.40 24.00 Holding CAP
97 08+733.00 Kanan 14.00 4.00 56.00 Holding LPA
98 08+778.00 Kanan 14.00 2.50 35.00 Holding LPA
99 08+813.00 Kanan 8.00 2.40 19.20 Holding
100 08+823.00 Kiri 3.00 2.40 7.20 Holding CAP
101 08+876.00 Kanan 20.00 2.40 48.00 Holding LPA
102 08+960.00 Kanan 17.00 1.50 25.50 Holding CAP
103 09+010.00 Kanan 8.00 2.40 19.20 Holding LPA
104 09+427.00 Kanan 4.00 3.00 12.00 Holding LPA
105 09+760.00 Kanan 7.00 2.40 16.80 Holding LPA
106 09+798.00 Kanan 5.00 2.40 12.00 Holding LPA
107 09+813.00 Kanan 6.00 2.40 14.40 Holding CAP
108 10+066.00 Kanan 9.00 3.00 27.00 Holding LPA
109 10+267.00 Kanan 7.00 2.40 16.80 Holding LPA
110 10+375.00 Kanan 5.00 2.40 12.00 Holding LPA
111 10+514.00 Kanan 5.00 1.50 7.50 Holding CAP
112 10+630.00 Kanan 6.00 3.00 18.00 Holding LPA
113 10+840.00 Kanan 8.00 3.50 28.00 Holding LPA

114 10+914.00 Kanan 6.00 2.50 15.00 Holding LPA


115 11+077.00 Kanan 4.00 2.50 10.00 Holding LPA
116 11+095.00 Kanan 7.00 3.20 22.40 Holding LPA
117 11+105.00 Kanan 5.00 3.00 15.00 Holding LPA
118 11+290.00 Kanan 6.00 2.40 14.40 Holding LPA
119 11+430.00 Kanan 6.00 2.40 14.40 Holding LPA
11+437.00 Kiri 12.00 2.40 28.80 Holding CAP
120
11+449.00 Kiri 7.00 3.50 24.50 Holding LPA
121 11+730.00 Kanan 13.00 2.40 31.20 Holding LPA
122 11+808.00 Full 15.00 6.00 90.00 Holding LPA
123 11+921.00 Kanan 18.00 2.50 45.00 Holding CAP
124 11+954.00 Kanan 17.00 3.00 51.00 Holding LPA
12+000.00
125 12+012.00 Kanan 9.00 2.50 22.50 Rutin Jalan
126 12+035.00 Kanan 6.00 2.40 14.40 Rutin Jalan LPA
127 12+089.00 Kanan 11.00 2.40 26.40 Rutin Jalan CAP
128 12+130.00 Kanan 14.00 3.00 42.00 Rutin Jalan
129 12+169.00 Kanan 16.00 3.00 48.00 Rutin Jalan
130 12+213.00 Kanan 14.00 3.00 42.00 Rutin Jalan
131 12+235.00 Kanan 13.00 2.00 26.00 Rutin Jalan CAP
132 12+271.00 Kanan 8.00 3.00 24.00 Rutin Jalan LPA
133 12+287.00 Kiri 5.00 3.00 15.00 Rutin Jalan CAP
134 12+688.00 Kanan 14.00 3.00 42.00 Rutin Jalan CAP
12+900.00
135 13+060.00 Kanan 5.00 3.00 15.00 Rutin Kondisi LPA
136 13+240.00 Full 26.00 6.00 156.00 Rutin Kondisi CAP
137 13+266.00 Full 33.75 6.00 202.50 Rutin Kondisi LPA
138 13+607.00 Kanan 13.00 2.40 31.20 Rutin Kondisi LPA
139 13+620.00 Kiri 7.00 2.97 20.80 Rutin Kondisi CAP
140 13+743.00 Kanan 7.00 3.00 21.00 Rutin Kondisi LPA
141 13+858.00 Kanan 5.00 2.40 12.00 Rutin Kondisi LPA
13+917.00 Full 30.00 6.00 180.00 Rutin Kondisi LPA
142
13+947.00 Kanan 13.00 3.00 39.00 Rutin Kondisi LPA
14+140.00
143 14+193.00 Full 12.00 6.00 72.00 Rutin Jalan LPA
144 14+210.00 Kanan 3.00 2.40 7.20 Rutin Jalan CAP
145 14+245.00 Kanan 7.00 3.00 21.00 Rutin Jalan CAP
146 14+811.00 Kanan 8.00 2.40 19.20 Rutin Jalan LPA
147 14+850.00 Kanan 8.00 2.40 19.20 Rutin Jalan LPA
148 14+928.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
149 15+400.00 Kanan 6.00 2.40 14.40 Rutin Jalan LPA
150 15+487.00 Kanan 5.00 2.40 12.00 Rutin Jalan LPA
151 15+513.00 Tengah 3.00 1.50 4.50 Rutin Jalan CAP
152 15+570.00 Kanan 12.00 3.00 36.00 Rutin Jalan LPA
15+608.00 Full 11.00 6.00 66.00 Rutin Jalan LPA
153
15+619.00 Kiri 14.00 3.00 42.00 Rutin Jalan LPA
154 15+638.00 Tengah 19.00 2.00 38.00 Rutin Jalan CAP
155 16+499.00 Full 75.00 6.00 450.00 Rutin Jalan LPA
156 16+599.00 Kiri 10.00 2.40 24.00 Rutin Jalan CAP
157 16+609.00 Full 11.00 6.00 66.00 Rutin Jalan CAP
16+640.00 Full 20.00 6.00 120.00 Rutin Jalan LPA
158
16+660.00 Kanan 16.00 3.00 48.00 Rutin Jalan LPA
16+698.00 Full 80.00 6.00 480.00 Rutin Jalan LPA
159
16+778.00 Kanan 12.00 3.00 36.00 Rutin Jalan LPA
160 16+717.00 Kanan 10.00 3.00 30.00 Rutin Jalan LPA
161 16+737.00 Kanan 15.00 3.00 45.00 Rutin Jalan LPA
16+757.00 Kanan 12.00 3.00 36.00 Rutin Jalan LPA
162
16+769.00 Full 13.00 6.00 78.00 Rutin Jalan LPA
163 16+786.00 Kanan 17.00 3.00 51.00 Rutin Jalan LPA
164 16+980.00 Kanan 42.00 4.00 168.00 Rutin Jalan CAP
165 17+036.00 Kanan 20.00 3.50 70.00 Rutin Jalan
166 17+092.00 Kanan 3.00 2.40 7.20 Rutin Jalan CAP
167 17+143.00 Full 28.00 6.00 168.00 Rutin Jalan
168 17+184.00 Tengah 10.00 2.50 25.00 Rutin Jalan CAP
169 17+195.00 Kiri 9.00 3.00 27.00 Rutin Jalan
17+207.00 Kiri 25.00 3.00 75.00 Rutin Jalan CAP
170
17+207.00 Kanan 20.00 3.00 60.00 Rutin Jalan
17+250.00 Kiri 14.00 3.00 42.00 Rutin Jalan CAP
171
17+250.00 Kanan 14.00 3.00 42.00 Rutin Jalan LPA

17+273.00 Full 8.00 6.00 48.00 Rutin Jalan LPA


172
17+281.00 Kanan 5.00 3.00 15.00 Rutin Jalan
173 17+294.00 Kiri 5.00 2.00 10.00 Rutin Jalan CAP
174 17+303.00 Tengah 17.00 2.00 34.00 Rutin Jalan CAP
175 17+323.00 Kanan 36.00 3.00 108.00 Rutin Jalan CAP
17+362.00 Full 20.00 6.00 120.00 Rutin Jalan
176
17+382.00 Kanan 15.00 3.00 45.00 Rutin Jalan
177 17+404.00 Kiri 13.00 2.00 26.00 Rutin Jalan CAP
178 17+428.00 Kanan 29.00 2.40 69.60 Rutin Jalan
179 17+500.00 Kiri 4.00 3.00 12.00 Rutin Jalan CAP
180 17+508.00 Kanan 9.00 3.00 27.00 Rutin Jalan LPA
17+524.00 Full 12.00 6.00 72.00 Rutin Jalan LPA
181
17+536.00 Tengah 9.00 2.40 21.60 Rutin Jalan
182 17+611.00 Kanan 5.00 2.40 12.00 Rutin Jalan CAP
183 17+622.00 Kanan 11.00 2.40 26.40 Rutin Jalan
184 17+640.00 Kanan 18.00 2.40 43.20 Rutin Jalan
185 17+700.00 Tengah 12.00 3.00 36.00 Rutin Jalan CAP
186 17+716.00 Kiri 10.00 2.40 24.00 Rutin Jalan LPA
187 17+734.00 Full 30.00 6.00 180.00 Rutin Jalan LPA
188 17+823.00 Kanan 5.00 2.40 12.00 Rutin Jalan
189 18+650.00 Kanan 8.00 2.00 16.00 Rutin Jalan CAP
190 19+602.00 Kanan 3.00 2.50 7.50 Rutin Jalan CAP
191 19+750.00 Tengah 5.00 2.00 10.00 Rutin Jalan CAP
192 19+770.00 Kanan 9.00 1.50 13.50 Rutin Jalan CAP
193 19+803.00 Kanan 10.00 1.50 15.00 Rutin Jalan CAP
194 19+879.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
195 19+902.00 Kanan 15.00 3.00 45.00 Rutin Jalan
196 19+965.00 Tengah 33.00 2.40 79.20 Rutin Jalan CAP
197 20+010.00 Kanan 6.00 3.20 19.20 Rutin Jalan CAP
198 20+036.00 Kanan 8.00 1.50 12.00 Rutin Jalan CAP
199 20+056.00 Kiri 5.00 1.50 7.50 Rutin Jalan CAP
200 20+125.00 Kanan 17.00 2.00 34.00 Rutin Jalan CAP
201 20+223.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
202 20+318.00 Kanan 12.00 3.00 36.00 Rutin Jalan CAP
203 20+370.00 Kiri 15.00 2.00 30.00 Rutin Jalan
204 20+413.00 Kiri 7.00 1.50 10.50 Rutin Jalan CAP
205 20+510.00 Kanan 10.00 2.00 20.00 Rutin Jalan CAP
206 20+565.00 Kanan 8.00 3.00 24.00 Rutin Jalan
207 20+577.00 Tengah 6.00 1.50 9.00 Rutin Jalan CAP
208 20+588.00 Kanan 9.00 2.40 21.60 Rutin Jalan
209 20+613.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
210 20+717.00 Kanan 12.00 1.50 18.00 Rutin Jalan CAP
211 20+763.00 Full 14.00 6.00 84.00 Rutin Jalan LPA
212 20+841.00 Full 8.00 6.00 48.00 Rutin Jalan LPA
213 21+013.00 Kanan 5.00 3.00 15.00 Rutin Jalan CAP
214 21+044.00 Kanan 8.00 3.00 24.00 Rutin Jalan CAP
215 21+323.00 Kanan 6.00 1.50 9.00 Rutin Jalan CAP
21+414.00

Total Yang Tidak Tertangani 11,530.10


Total Rutin Jalan -
Total Rutin Kondisi -
Total Holding -
DATA SURVEY
RUAS JALAN KUJAN - RUNTU

Panjang Lebar Luas Rutin Rutin


No. STA. Posisi Holding Lingkup Ket.
(M) (M) (M2) Jalan Kondisi

1 02+338.00 Full 22.00 6.00 132.00 Rutin Kondisi CAP


2 02+388.00 Kiri 10.00 2.50 25.00 Rutin Kondisi CAP
3 02+407.00 Kiri 3.00 1.00 3.00 Rutin Kondisi CAP
4 02+412.00 Kiri 5.00 3.00 15.00 Rutin Kondisi CAP
5 01+417.00 Kanan 6.00 3.00 18.00 Rutin Kondisi CAP
6 02+438.00 Kanan 12.00 3.00 36.00 Rutin Kondisi CAP
02+460.00 Full 7.00 6.00 42.00 Rutin Kondisi CAP
7
02+467.00 Kiri 6.00 3.00 18.00 Rutin Kondisi CAP
8 02+491.00 Kanan 5.00 2.00 10.00 Rutin Kondisi CAP
9 02+548.00 Full 10.00 6.00 60.00 Rutin Kondisi LPA
10 02+680.00 Kanan 11.00 3.00 33.00 Rutin Kondisi LPA
11 02+816.00 Kanan 17.00 3.50 59.50 Rutin Kondisi LPA
12 02+921.00 Full 5.00 6.00 30.00 Rutin Kondisi CAP
13 02+931.00 Full 6.00 6.00 36.00 Rutin Kondisi CAP
14 02+987.00 Kanan 11.00 3.50 38.50 Rutin Kondisi LPA
15 03+531.00 Full 37.00 6.00 222.00 Rutin Kondisi CAP
16 03+630.00 Kiri 8.00 2.00 16.00 Rutin Kondisi CAP
17 03+725.00 Kanan 5.00 2.40 12.00 Rutin Kondisi LPA
18 03+790.00 Full 13.00 6.00 78.00 Rutin Kondisi LPA
19 03+934.00 Kanan 7.00 2.50 17.50 Rutin Kondisi LPA
20 03+984.00 Kanan 5.00 2.50 12.50 Rutin Kondisi LPA
21 04+002.00 Kiri 6.00 3.00 18.00 Rutin Kondisi CAP
22 04+022.00 Full 14.00 6.00 84.00 Rutin Kondisi CAP
23 04+108.00 Kiri 3.00 1.50 4.50 Rutin Kondisi CAP
24 04+113.00 Tengah 3.00 1.00 3.00 Rutin Kondisi CAP
04+165.00 Kiri 54.00 3.00 162.00 Rutin Kondisi CAP
25
04+165.00 Kanan 54.00 3.00 162.00 Rutin Kondisi LPA
26 04+245.00 Kiri 8.00 1.50 12.00 Rutin Kondisi CAP
27 04+531.00 Kiri 9.00 2.50 22.50 Rutin Kondisi LPA
04+604.00 Kanan 33.00 3.00 99.00 Rutin Kondisi LPA
28
04+637.00 Full 34.00 6.00 204.00 Rutin Kondisi LPA
29 04+689.00 Kiri 8.00 1.50 12.00 Rutin Kondisi CAP
30 05+430.00 Kanan 12.00 2.50 30.00 Rutin Kondisi LPA
31 06+090.00 Kanan 5.00 2.00 10.00 Rutin Kondisi LPA
32 06+359.00 Kanan 19.00 1.50 28.50 Rutin Kondisi CAP
33 06+537.00 Full 20.00 6.00 120.00 Rutin Kondisi CAP
34 06+702.00 Kanan 4.00 2.50 10.00 Rutin Kondisi CAP
35 06+744.00 Kanan 3.00 1.50 4.50 Rutin Kondisi CAP
36 06+898.00 Tengah 9.00 1.50 13.50 Rutin Kondisi CAP
37 06+925.00 Kanan 3.00 1.00 3.00 Rutin Kondisi CAP
06+980.00
38 06+990.00 Full 10.00 6.00 Rekonstruksi
39 07+008.00 Kanan 10.00 3.00 Rekonstruksi
40 07+089.00 Tengah 6.00 2.00 Rekonstruksi
07+900.00
41 08+380.00 Tengah 21.00 2.00 42.00 Rutin Jalan CAP
42 08+424.00 Tengah 10.00 2.00 20.00 Rutin Jalan CAP
08+434.00 Kanan 6.00 2.40 14.40 Rutin Jalan LPA
43
08+440.00 Kanan 10.00 4.00 40.00 Rutin Jalan LPA
44 08+475.00 Kanan 53.00 3.00 159.00 Rutin Jalan CAP
45 08+483.00 Kiri 3.00 1.50 4.50 Rutin Jalan CAP
46 08+540.00 Tengah 4.00 1.50 6.00 Rutin Jalan CAP
08+544.00 Kanan 13.00 3.50 45.50 Rutin Jalan LPA
47
08+557.00 Full 26.00 6.00 156.00 Rutin Jalan CAP
48 08+583.00 Full 25.00 6.00 150.00 Rutin Jalan LPA
49 08+630.00 Full 17.00 6.00 102.00 Rutin Jalan CAP
50 08+668.00 Kanan 5.00 2.50 12.50 Rutin Jalan LPA
51 08+685.00 Kanan 5.00 2.50 12.50 Rutin Jalan LPA
08+728.00 Kanan 30.00 3.50 105.00 Rutin Jalan LPA
52
08+758.00 Kanan 15.00 3.00 45.00 Rutin Jalan CAP
53 08+774.00 Tengah 3.00 2.50 7.50 Rutin Jalan LPA
54 08+788.00 Kanan 5.00 2.40 12.00 Rutin Jalan LPA
55 08+804.00 Kanan 5.00 2.50 12.50 Rutin Jalan LPA
56 08+831.00 Kiri 22.00 3.50 77.00 Rutin Jalan LPA
08+900.00
Rekonstruksi
10+475.00

57 10+718.00 Kanan 20.00 3.00 60.00 Rutin Jalan CAP


10+739.00 Kiri 19.00 2.40 45.60 Rutin Jalan LPA
58
10+758.00 Full 12.00 6.00 72.00 Rutin Jalan LPA
59 10+786.00 Full 53.00 6.00 318.00 Rutin Jalan LPA
60 10+850.00 Kanan 25.00 2.40 60.00 Rutin Jalan LPA
61 10+887.00 Kanan 11.00 2.40 26.40 Rutin Jalan LPA
62 10+912.00 Kanan 6.00 2.40 14.40 Rutin Jalan LPA
63 10+924.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
64 10+955.00 Full 25.00 6.00 150.00 Rutin Jalan LPA
65 10+990.00 Tengah 7.00 2.00 14.00 Rutin Jalan CAP
66 11+070.00 Kanan 19.00 3.00 57.00 Rutin Jalan LPA
67 11+083.00 Kiri 4.00 2.40 9.60 Rutin Jalan LPA
68 11+100.00 Kiri 19.00 3.00 57.00 Rutin Jalan CAP
69 11+153.00 Kanan 5.00 2.40 12.00 Rutin Jalan LPA
70 11+172.00 Kanan 29.00 2.40 69.60 Rutin Jalan LPA
71 11+220.00 Kiri 7.00 2.40 16.80 Rutin Jalan LPA
72 11+227.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
73 11+252.00 Kiri 19.00 1.50 28.50 Rutin Jalan CAP
74 11+323.00 Kanan 5.00 2.40 12.00 Rutin Jalan LPA
75 11+460.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
76 11+522.00 Kanan 9.00 2.40 21.60 Rutin Jalan LPA
77 11+536.00 Kanan 10.00 1.50 15.00 Rutin Jalan CAP
78 11+559.00 Kanan 3.00 2.40 7.20 Rutin Jalan LPA
79 11+700.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
80 11+713.00 Kanan 21.00 2.00 42.00 Rutin Jalan CAP
81 11+742.00 Kanan 17.00 2.40 40.80 Rutin Jalan LPA
82 11+759.00 Full 9.00 6.00 54.00 Rutin Jalan LPA
83 11+770.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
84 11+800.00 Full 60.00 6.00 360.00 Rutin Jalan LPA
85 12+000.00 Kiri 4.00 3.00 12.00 Rutin Jalan LPA
86 12+035.00 Kiri 28.00 3.00 84.00 Rutin Jalan CAP
87 12+123.00 Full 29.00 6.00 Rutin Jalan CAP
88 12+227.00 Full 9.00 6.00 54.00 Rutin Jalan LPA
13+185.00 Kanan 31.00 3.00 93.00 Rutin Jalan CAP
89
13+216.00 Full 42.00 6.00 252.00 Rutin Jalan CAP
90 13+262.00 Kanan 10.00 2.00 20.00 Rutin Jalan CAP
13+353.00 Kanan 29.00 3.00 87.00 Rutin Jalan CAP
91
13+382.00 Full 17.00 6.00 102.00 Rutin Jalan CAP
92 13+426.00 Kanan 16.00 3.00 48.00 Rutin Jalan CAP
93 13+473.00 Kanan 42.00 3.00 126.00 Rutin Jalan CAP
94 13+526.00 Kanan 9.00 2.00 18.00 Rutin Jalan CAP
95 13+607.00 Kanan 1.50 1.50 2.25 Rutin Jalan CAP
96 13+812.00 Kanan 12.00 3.00 36.00 Rutin Jalan CAP
97 13+853.00 Kanan 4.00 2.00 8.00 Rutin Jalan CAP
98 13+892.00 Kanan 29.00 2.50 72.50 Rutin Jalan CAP
99 13+932.00 Kanan 4.00 1.50 6.00 Rutin Jalan CAP
100 13+964.00 Kanan 21.00 2.00 42.00 Rutin Jalan CAP
101 14+010.00 Kanan 17.00 2.50 42.50 Rutin Jalan CAP
102 14+028.00 Kiri 22.00 3.00 66.00 Rutin Jalan CAP
103 14+195.00 Kanan 6.00 1.50 9.00 Rutin Jalan CAP
14+210.00 Kanan 97.00 3.00 291.00 Rutin Jalan CAP
104
14+307.00 Full 15.00 6.00 90.00 Rutin Jalan CAP
105 14+326.00 Full 58.00 6.00 348.00 Rutin Jalan CAP
106 14+394.00 Full 42.00 6.00 252.00 Rutin Jalan CAP
14+441.00 Full 61.00 6.00 366.00 Rutin Jalan CAP
107
14+502.00 Kanan 16.00 3.00 48.00 Rutin Jalan CAP
108 14+526.00 Kanan 15.00 3.00 45.00 Rutin Jalan CAP
109 14+553.00 Kanan 7.00 3.00 21.00 Rutin Jalan CAP
110 14+563.00 Full 30.00 6.00 180.00 Rutin Jalan CAP
111 14+735.00 Full 38.00 6.00 228.00 Rutin Jalan CAP
112 15+169.00 Kanan 12.00 2.00 24.00 Rutin Jalan LPA
113 15+378.00 Kanan 7.00 2.50 17.50 Rutin Jalan LPA
114 15+530.00 Kanan 7.00 3.00 21.00 Rutin Jalan LPA
115 15+800.00 Kanan 7.00 2.50 17.50 Rutin Jalan LPA
116 15+830.00 Kanan 4.00 2.50 10.00 Rutin Jalan LPA
117 15+890.00 Full 2.00 3.00 6.00 Rutin Jalan CAP
118 15+931.00 Kanan 8.00 6.00 48.00 Rutin Jalan LPA
119 16+030.00 Full 14.00 3.00 42.00 Rutin Jalan CAP
120 16+092.00 Kanan 21.00 6.00 126.00 Rutin Jalan LPA

121 16+135.00 Kiri 6.00 2.00 12.00 Rutin Jalan LPA


122 16+158.00 Kanan 4.00 1.50 6.00 Rutin Jalan CAP
123 16+189.00 Kanan 9.00 3.00 27.00 Rutin Jalan CAP
122.B 16+206.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
122.C 16+220.00 Kanan 9.00 2.50 22.50 Rutin Jalan CAP
122.D 16+234.00 Kanan 22.00 2.50 55.00 Rutin Jalan CAP
124 16+415.00 Kanan 5.00 2.00 10.00 Rutin Jalan CAP
125 16+429.00 Kanan 9.00 3.00 27.00 Rutin Jalan LPA
126 16+515.00 Kanan 9.00 1.50 13.50 Rutin Jalan LPA
127 16+530.00 Kanan 3.00 1.50 4.50 Rutin Jalan CAP
128 16+616.00 Kanan 5.00 1.50 7.50 Rutin Jalan CAP
129 16+705.00 Kanan 5.00 2.50 12.50 Rutin Jalan LPA
130 16+720.00 Kanan 14.00 2.50 35.00 Rutin Jalan LPA
131 16+750.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
132 16+766.00 Full 11.00 6.00 66.00 Rutin Jalan CAP
133 16+793.00 Full 12.00 6.00 72.00 Rutin Jalan CAP
134 16+815.00 Kanan 6.00 3.00 18.00 Rutin Jalan CAP
135 16+863.00 Tengah 21.00 2.00 42.00 Rutin Jalan CAP
16+940.00
16+946.00 Kiri 14.00 3.00 Rekonstruksi
136
16+960.00 Full 22.00 6.00 Rekonstruksi
137 16+991.00 Full 42.00 6.00 Rekonstruksi
138 17+080.00 Kanan 8.00 2.00 Rekonstruksi
139 17+098.00 Kiri 14.00 2.50 Rekonstruksi
140 17+109.00 Kanan 4.00 1.50 Rekonstruksi
141 17+123.00 Kanan 7.00 1.50 Rekonstruksi
142 17+154.00 Kanan 5.00 2.50 Rekonstruksi
143 17+167.00 Kanan 3.00 2.00 Rekonstruksi
144 17+178.00 Full 22.00 6.00 Rekonstruksi
145 17+254.00 Kanan 19.00 3.00 Rekonstruksi
146 17+281.00 Kanan 8.00 3.00 Rekonstruksi
147 17+306.00 Kanan 6.00 2.50 Rekonstruksi
148 17+330.00 Kanan 2.00 2.50 Rekonstruksi
149 17+351.00 Kanan 9.00 2.00 Rekonstruksi
17+360.00
17+400.00 Full 7.00 6.00 42.00 Rutin Jalan LPA
150
17+407.00 Kanan 19.00 3.00 57.00 Rutin Jalan LPA
151 17+451.00 Full 21.00 6.00 126.00 Rutin Jalan CAP
152 17+484.00 Kanan 4.00 1.50 6.00 Rutin Jalan CAP
153 17+516.00 Full 33.00 6.00 198.00 Rutin Jalan CAP
154 17+562.00 Kanan 6.00 2.50 15.00 Rutin Jalan CAP
155 17+578.00 Kanan 22.00 2.00 44.00 Rutin Jalan CAP
156 17+618.00 Kanan 8.00 1.00 8.00 Rutin Jalan CAP
157 17+685.00 Kanan 5.00 2.00 10.00 Rutin Jalan CAP
158 17+822.00 Full 6.00 6.00 36.00 Rutin Jalan LPA
159 17+860.00 Kanan 5.00 2.00 10.00 Rutin Jalan CAP
160 17+877.00 Kiri 3.00 1.00 3.00 Rutin Jalan CAP
161 18+220.00 Kiri 4.00 2.50 10.00 Rutin Jalan LPA
162 18+256.00 Kanan 29.00 3.00 87.00 Rutin Jalan CAP
18+350.00
163 18+382.00 Kanan 7.00 3.00 21.00 Holding CAP
164 18+415.00 Kanan 8.00 3.00 24.00 Holding CAP
18+447.00 Kanan 22.00 3.00 66.00 Holding CAP
165
18+469.00 Full 31.00 6.00 186.00 Holding CAP
166 18+656.00 Kanan 6.00 2.00 12.00 Holding CAP
167 18+698.00 Kanan 8.00 2.50 20.00 Holding CAP
168 18+893.00 Kanan 14.00 3.00 42.00 Holding LPA
169 18+934.00 Kanan 5.00 2.50 12.50 Holding LPA
170 18+936.00 Kiri 17.00 2.00 34.00 Holding CAP
171 19+017.00 Kanan 4.00 2.00 8.00 Holding CAP
19+031.00 Kanan 11.00 3.00 33.00 Holding CAP
172
19+042.00 Full 18.00 6.00 108.00 Holding CAP
173 19+100.00 Kanan 11.00 2.00 22.00 Holding CAP
174 19+120.00 Kanan 8.00 1.50 12.00 Holding CAP
175 19+240.00 Kanan 11.00 3.00 33.00 Holding CAP
176 19+292.00 Kanan 7.00 2.00 14.00 Holding CAP
177 19+439.00 Full 35.00 6.00 210.00 Holding CAP
178 19+544.00 Kanan 3.00 1.50 4.50 Holding CAP
179 19+554.00 Kanan 3.00 3.00 9.00 Holding CAP

180 19+595.00 Kanan 11.00 3.00 33.00 Holding CAP


181 19+649.00 Kanan 7.00 2.00 14.00 Holding CAP
182 19+668.00 Kanan 12.00 2.00 24.00 Holding CAP
183 19+692.00 Kiri 8.00 2.00 16.00 Holding CAP
184 19+752.00 Kiri 4.00 2.50 10.00 Holding CAP
185 19+760.00 Kanan 2.00 3.00 6.00 Holding CAP
186 19+779.00 Kanan 30.00 2.00 60.00 Holding CAP
187 20+607.00 Full 69.00 6.00 414.00 Holding CAP
188 20+700.00 Full 38.00 6.00 228.00 Holding CAP
189 20+806.00 Kanan 10.00 3.00 30.00 Holding LPA
190 21+225.00 Kanan 14.00 3.00 42.00 Holding LPA
191 21+228.00 Kiri 3.00 2.00 6.00 Holding LPA
192 21+264.00 Kanan 3.00 2.00 6.00 Holding CAP
193 21+324.00 Kanan 5.00 2.00 10.00 Holding CAP
194 21+347.00 Kanan 10.00 2.50 25.00 Holding LPA
195 21+375.00 Kiri 7.00 3.00 21.00 Holding CAP
196 21+385.00 Kanan 10.00 2.50 25.00 Holding CAP
197 21+425.00 Kanan 4.00 1.50 6.00 Holding CAP
198 21+433.00 Kanan 20.00 1.50 30.00 Holding CAP
199 21+489.00 Kanan 27.00 3.00 81.00 Holding CAP
200 21+908.00 Kanan 11.00 3.00 33.00 Holding LPA
201 21+911.00 Kiri 3.00 2.00 6.00 Holding CAP
202 22+617.00 Kanan 8.00 3.00 24.00 Holding LPA
203 22+657.00 Kanan 7.00 2.50 17.50 Holding LPA
204 22+718.00 Kanan 11.00 2.50 27.50 Holding LPA
205 22+758.00 Kanan 4.00 2.50 10.00 Holding LPA
206 22+783.00 Kanan 4.00 2.50 10.00 Holding LPA
207 22+828.00 Kanan 7.00 2.50 17.50 Holding LPA
22+914.00 Full 59.00 6.00 354.00 Holding LPA
208
22+973.00 Kanan 11.00 3.00 33.00 Holding LPA
209 22+998.00 Kanan 11.00 2.50 27.50 Holding CAP
210 23+019.00 Kanan 4.00 2.50 10.00 Holding LPA
211 23+043.00 Kanan 7.00 1.50 10.50 Holding CAP
212 23+088.00 Kiri 14.00 1.50 21.00 Holding CAP
213 23+131.00 Kanan 16.00 2.50 40.00 Holding LPA
214 23+159.00 Kanan 8.00 2.50 20.00 Holding LPA
23+185.00 Kanan 12.00 3.00 36.00 Holding LPA
215
23+197.00 Full 9.00 6.00 54.00 Holding LPA
216 23+212.00 Tengah 5.00 2.00 10.00 Holding CAP
217 23+228.00 Kanan 13.00 2.00 26.00 Holding LPA
218 23+310.00 Kiri 4.00 3.00 12.00 Holding LPA
219 23+313.00 Kanan 9.00 2.50 22.50 Holding LPA
23+379.00 Kanan 12.00 3.00 36.00 Holding LPA
220
23+391.00 Full 6.00 6.00 36.00 Holding LPA
221 23+446.00 Kanan 5.00 1.50 7.50 Holding CAP
222 23+460.00 Kanan 20.00 3.00 60.00 Holding CAP
223 23+517.00 Kanan 11.00 3.00 33.00 Holding CAP
224 23+635.00 Kanan 5.00 1.50 7.50 Holding CAP
225 23+647.00 Kanan 41.00 3.00 123.00 Holding CAP
226 23+728.00 Full 11.00 6.00 66.00 Holding CAP
227 23+762.00 Kiri 20.00 3.00 60.00 Holding CAP
228 23+789.00 Full 20.00 6.00 120.00 Holding LPA
229 23+827.00 Full 13.00 6.00 78.00 Holding LPA
230 23+861.00 Kanan 5.00 1.00 5.00 Holding CAP
231 24+125.00 Kanan 5.00 2.00 10.00 Holding LPA
232 24+126.00 Kiri 6.00 3.00 18.00 Holding CAP
233 24+330.00 Kanan 17.00 3.00 51.00 Holding LPA
234 24+376.00 Tengah 6.00 2.00 12.00 Holding CAP
235 24+421.00 Kanan 4.00 1.50 6.00 Holding CAP
236 24+545.00 Kanan 5.00 3.00 15.00 Holding CAP
237 24+582.00 Tengah 4.00 3.00 12.00 Holding CAP
238 24+615.00 Kanan 9.00 3.00 27.00 Holding CAP
239 24+657.00 Kanan 6.00 2.50 15.00 Holding LPA
240 24+818.00 Kanan 4.00 2.00 8.00 Holding CAP
24+880.00
241 24+875.00 Kanan 11.00 3.00 Rekonstruksi
242 24+887.00 Tengah 11.00 2.50 Rekonstruksi
243 24+915.00 Full 20.00 6.00 Rekonstruksi
244 24+955.00 Kanan 8.00 2.50 Rekonstruksi

245 25+008.00 Full 8.00 6.00 Rekonstruksi


246 25+065.00 Kanan 6.00 1.50 Rekonstruksi
247 25+095.00 Kanan 29.00 3.00 Rekonstruksi
248 25+147.00 Kanan 16.00 3.00 Rekonstruksi
249 25+190.00 Kanan 3.00 1.50 Rekonstruksi
250 25+230.00 Kanan 5.00 2.50 Rekonstruksi
251 25+279.00 Kiri 3.00 1.50 Rekonstruksi
252 25+306.00 Kanan 3.00 2.50 Rekonstruksi
253 25+317.00 Kanan 12.00 3.50 Rekonstruksi
254 25+340.00 Kanan 9.00 2.50 Rekonstruksi
255 25+366.00 Kanan 7.00 2.50 Rekonstruksi
256 25+392.00 Full 93.00 6.00 Rekonstruksi
25+478.00
257 25+605.00 Full 15.00 6.00 90.00 Holding LPA
258 25+639.00 Kanan 13.00 3.00 39.00 Holding LPA
259 25+658.00 Kiri 5.00 1.50 7.50 Holding LPA
260 25+671.00 Kanan 3.00 2.00 6.00 Holding LPA
261 25+751.00 Kanan 14.00 3.00 42.00 Holding CAP
262 25+775.00 Kanan 7.00 1.50 10.50 Holding CAP
263 25+793.00 Full 9.00 6.00 54.00 Holding CAP
264 25+860.00 Full 11.00 6.00 66.00 Holding CAP
265 25+926.00 Kiri 13.00 3.50 45.50 Holding CAP
266 25+947.00 Full 35.00 6.00 210.00 Holding CAP
267 25+988.00 Kiri 18.00 3.00 54.00 Holding CAP
268 26+011.00 Full 17.00 6.00 102.00 Holding CAP
269 26+066.00 Kanan 12.00 2.50 30.00 Holding CAP
270 26+137.00 Kanan 4.00 1.50 6.00 Holding CAP
26+340.00 Kanan 7.00 2.00 14.00 Holding LPA
271
26+347.00 Kiri 8.00 4.00 32.00 Holding LPA
272 26+358.00 Kanan 6.00 3.00 18.00 Holding CAP
273 26+389.00 Kanan 4.00 2.50 10.00 Holding CAP
274 26+397.00 Kiri 3.00 1.50 4.50 Holding CAP
275 26+405.00 Kanan 3.00 1.50 4.50 Holding CAP
276 26+452.00 Full 15.00 6.00 90.00 Holding LPA
277 26+494.00 Kanan 6.00 3.00 18.00 Holding LPA
278 26+650.00 Tengah 34.00 1.50 51.00 Holding CAP
279 26+694.00 Tengah 17.00 1.50 25.50 Holding CAP
280 26+707.00 Kanan 15.00 4.00 60.00 Holding LPA
281 26+734.00 Kanan 16.00 4.00 64.00 Holding CAP
282 26+795.00 Tengah 5.00 1.00 5.00 Holding CAP
283 26+883.00 Tengah 7.00 1.50 10.50 Holding CAP
284 26+894.00 Tengah 12.00 1.50 18.00 Holding CAP
285 26+913.00 Kanan 10.00 2.40 24.00 Holding LPA
286 26+944.00 Kanan 9.00 3.00 27.00 Holding LPA
287 26+969.00 Kanan 5.00 2.00 10.00 Holding CAP
288 27+067.00 Kiri 4.00 1.50 6.00 Holding CAP
289 27+073.00 Kiri 2.00 1.50 3.00 Holding CAP
290 27+095.00 Kiri 15.00 4.00 60.00 Holding LPA
291 27+563.00 Tengah 6.00 2.50 15.00 Holding CAP
292 27+570.00 Kanan 8.00 3.00 24.00 Holding CAP
27+588.00 Full 32.00 6.00 192.00 Holding LPA
293
27+620.00 Kanan 13.00 3.00 39.00 Holding LPA
294 27+644.00 Full 13.00 6.00 78.00 Holding LPA
295 27+721.00 Kanan 3.00 4.00 12.00 Holding LPA
296 28+340.00 Kanan 10.00 3.00 30.00 Holding CAP
297 28+351.00 Kiri 5.00 2.40 12.00 Holding LPA
298 28+360.00 Kanan 25.00 3.00 75.00 Holding CAP
299 28+438.00 Full 10.00 6.00 60.00 Holding CAP
300 28+457.00 Full 9.00 6.00 54.00 Holding LPA
301 28+476.00 Full 86.00 6.00 516.00 Holding LPA
302 28+570.00 Kanan 25.00 3.00 75.00 Holding CAP
303 28+600.00 Full 22.00 6.00 132.00 Holding CAP
304 28+644.00 Kanan 12.00 2.00 24.00 Holding CAP
305 28+683.00 Full 9.00 6.00 54.00 Holding CAP
306 28+700.00 Kanan 8.00 4.00 32.00 Holding CAP
307 28+724.00 Full 18.00 6.00 108.00 Holding CAP
308 28+743.00 Kanan 48.00 3.00 144.00 Holding CAP
309 28+799.00 Tengah 5.00 1.50 7.50 Holding CAP
28+829.00 Full 16.00 6.00 96.00 Holding CAP
310
28+845.00 Kiri 27.00 3.00 81.00 Holding CAP

311 28+898.00 Kanan 16.00 1.50 24.00 Holding CAP


312 28+932.00 Tengah 1.50 1.50 2.25 Holding CAP
313 28+957.00 Kanan 16.00 4.00 64.00 Holding CAP
314 28+985.00 Kanan 7.00 3.00 21.00 Holding CAP
315 29+015.00 Kanan 6.00 1.50 9.00 Holding CAP
316 29+081.00 Full 9.00 6.00 54.00 Holding LPA
317 29+980.00 Kanan 7.00 2.40 16.80 Holding LPA
318 29+994.00 Kiri 13.00 1.50 19.50 Holding CAP
319 30+023.00 Kiri 15.00 1.50 22.50 Holding CAP
320 30+083.00 Tengah 5.00 1.50 7.50 Holding CAP
321 30+093.00 Tengah 7.00 2.00 14.00 Holding CAP
322 30+105.00 Tengah 5.00 2.00 10.00 Holding CAP
323 30+350.00 Full 27.00 6.00 162.00 Holding LPA
30+373.00 Kiri 7.00 3.00 21.00 Holding CAP
324
30+380.00 Full 20.00 6.00 120.00 Holding CAP
325 30+425.00 Kanan 7.00 3.00 21.00 Holding LPA
326 30+515.00 Kanan 5.00 3.00 15.00 Holding LPA
327 30+595.00 Kanan 2.00 3.00 6.00 Holding CAP
328 30+840.00 Kanan 13.00 2.50 32.50 Holding CAP
329 30+858.00 Full 17.00 6.00 102.00 Holding LPA
330 30+890.00 Kanan 10.00 3.00 30.00 Holding CAP
331 30+956.00 Kanan 9.00 2.50 22.50 Holding CAP
332 31+075.00 Full 13.00 6.00 78.00 Holding LPA
333 31+200.00 Kanan 6.00 3.00 18.00 Holding CAP
334 31+210.00 Full 16.00 6.00 96.00 Holding LPA
335 31+285.00 Full 8.00 6.00 48.00 Holding LPA
336 31+303.00 Kanan 7.00 4.00 28.00 Holding CAP
337 31+338.00 Tengah 3.00 1.50 4.50 Holding CAP
338 31+346.00 Kanan 6.00 2.50 15.00 Holding LPA
339 31+374.00 Kanan 3.00 2.00 6.00 Holding CAP
340 31+391.00 Kanan 8.00 2.40 19.20 Holding LPA
341 31+408.00 Kanan 3.00 2.50 7.50 Holding LPA
342 31+453.00 Kiri 2.00 1.50 3.00 Holding CAP
343 31+455.00 Kanan 5.00 2.50 12.50 Holding CAP
344 31+474.00 Kanan 3.00 2.50 7.50 Holding CAP
345 31+481.00 Kanan 9.00 2.50 22.50 Holding CAP
31+504.00 Kiri 6.00 3.00 18.00 Holding LPA
346
31+510.00 Full 17.00 6.00 102.00 Holding LPA
347 31+668.00 Kanan 6.00 2.00 12.00 Holding CAP
348 31+682.00 Kanan 5.00 2.50 12.50 Holding LPA
31+754.00 Full 13.00 6.00 78.00 Holding LPA
349
31+767.00 Kanan 11.00 3.00 33.00 Holding LPA
350 31+898.00 Full 3.00 6.00 18.00 Holding CAP
351 31+925.00 Kanan 9.00 2.50 22.50 Holding LPA
352 32+033.00 Tengah 5.00 3.00 15.00 Holding CAP
353 33+081.00 Kanan 3.00 3.00 9.00 Holding CAP
354 33+108.00 Kanan 7.00 2.50 17.50 Holding LPA
355 33+116.00 Kiri 6.00 3.00 18.00 Holding CAP
356 33+250.00 Kanan 7.00 3.00 21.00 Holding LPA
357 33+655.00 Kanan 8.00 2.40 19.20 Holding LPA
358 33+750.00 Kanan 10.00 2.40 24.00 Holding LPA
359 33+766.00 Kanan 12.00 2.40 28.80 Holding LPA
33+810.00 Kanan 13.00 2.50 32.50 Holding LPA
360
360
33+823.00 Full 7.00 6.00 42.00 Holding LPA
361 33+900.00 Kanan 5.00 2.50 12.50 Holding CAP
326 33+915.00 Kanan 13.00 2.00 26.00 Holding CAP
327 33+932.00 Kanan 11.00 2.40 26.40 Holding LPA
328 33+947.00 Kanan 20.00 2.40 48.00 Holding LPA
33+950.00
329 33+973.00 Kanan 9.00 2.40 21.60 Rutin Jalan LPA
33+987.00 Kanan 4.00 2.00 8.00 Rutin Jalan CAP
330
33+991.00 Full 8.00 6.00 48.00 Rutin Jalan CAP
331 34+059.00 Kanan 14.00 3.00 42.00 Rutin Jalan CAP
332 34+090.00 Kanan 10.00 3.00 30.00 Rutin Jalan CAP
333 34+103.00 Kanan 7.00 3.00 21.00 Rutin Jalan LPA
334 34+141.00 Kiri 5.00 2.00 10.00 Rutin Jalan CAP
335 34+181.00 Full 14.00 6.00 84.00 Rutin Jalan CAP
336 34+230.00 Kanan 7.00 2.50 17.50 Rutin Jalan LPA
337 34+313.00 Kanan 26.00 2.50 65.00 Rutin Jalan LPA

338 34+345.00 Full 41.00 6.00 246.00 Rutin Jalan LPA


339 34+433.00 Full 12.00 6.00 72.00 Rutin Jalan LPA
340 34+494.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
341 34+575.00 Kiri 7.00 2.40 16.80 Rutin Jalan LPA
342 34+594.00 Kanan 4.00 2.40 9.60 Rutin Jalan CAP
343 34+622.00 Full 30.00 6.00 180.00 Rutin Jalan LPA
344 34+661.00 Kanan 9.00 2.50 22.50 Rutin Jalan CAP
345 34+666.00 Kiri 3.00 1.50 4.50 Rutin Jalan CAP
346 34+686.00 Kanan 15.00 1.50 22.50 Rutin Jalan CAP
347 34+699.00 Kiri 10.00 1.50 15.00 Rutin Jalan CAP
348 34+730.00 Kanan 4.00 2.00 8.00 Rutin Jalan CAP
349 34+743.00 Kanan 16.00 2.40 38.40 Rutin Jalan LPA
350 34+765.00 Kiri 5.00 3.00 15.00 Rutin Jalan CAP
351 34+774.00 Kanan 12.00 4.00 48.00 Rutin Jalan LPA
352 34+820.00 Tengah 4.00 1.50 6.00 Rutin Jalan CAP
353 34+829.00 Kanan 9.00 3.00 27.00 Rutin Jalan LPA
354 34+849.00 Full 16.00 6.00 96.00 Rutin Jalan LPA
355 34+874.00 Kanan 6.00 2.50 15.00 Rutin Jalan LPA
356 34+893.00 Kanan 7.00 2.00 14.00 Rutin Jalan CAP
357 34+935.00 Kanan 5.00 2.40 12.00 Rutin Jalan LPA
358 34+940.00 Tengah 8.00 1.50 12.00 Rutin Jalan CAP
34+962.00 Kanan 5.00 4.00 20.00 Rutin Jalan LPA
359
34+967.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
360 34+977.00 Kiri 6.00 2.50 15.00 Rutin Jalan LPA
361 34+987.00 Kiri 10.00 2.40 24.00 Rutin Jalan LPA
362 35+000.00 Full 16.00 6.00 96.00 Rutin Jalan LPA
363 35+182.00 Kanan 6.00 1.50 9.00 Rutin Jalan CAP
364 35+196.00 Tengah 6.00 1.50 9.00 Rutin Jalan CAP
365 35+228.00 Kanan 6.00 2.50 15.00 Rutin Jalan LPA
366 35+295.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
367 35+307.00 Kanan 4.00 2.40 9.60 Rutin Jalan LPA
368 35+394.00 Kanan 6.00 2.50 15.00 Rutin Jalan CAP
369 35+437.00 Kanan 11.00 2.00 22.00 Rutin Jalan CAP
370 35+496.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
371 35+535.00 Kiri 5.00 2.40 12.00 Rutin Jalan CAP
372 35+542.00 Kanan 9.00 4.00 36.00 Rutin Jalan CAP
373 35+616.00 Kanan 12.00 2.40 28.80 Rutin Jalan LPA
374 35+634.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
35+646.00 Full 12.00 6.00 72.00 Rutin Jalan CAP
375
35+658.00 Kanan 5.00 3.00 15.00 Rutin Jalan CAP
376 35+676.00 Kanan 15.00 3.00 45.00 Rutin Jalan LPA
377 35+748.00 Kanan 10.00 2.40 24.00 Rutin Jalan LPA
378 35+776.00 Kanan 6.00 2.50 15.00 Rutin Jalan LPA
379 35+790.00 Kanan 3.00 2.50 7.50 Rutin Jalan LPA
380 35+790.00 Kiri 2.00 1.50 3.00 Rutin Jalan CAP
381 35+823.00 Kanan 12.00 3.00 36.00 Rutin Jalan LPA
382 35+840.00 Kanan 8.00 2.40 19.20 Rutin Jalan LPA
383 35+853.00 Kanan 9.00 2.00 18.00 Rutin Jalan CAP
384 35+891.00 Kanan 15.00 3.00 45.00 Rutin Jalan CAP
385 38+098.00 Kanan 7.00 2.40 16.80 Rutin Jalan LPA
386 38+123.00 Tengah 2.00 2.40 4.80 Rutin Jalan CAP
38+128.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
387
38+134.00 Kanan 5.00 4.00 20.00 Rutin Jalan CAP
388 38+183.00 Kanan 8.00 2.50 20.00 Rutin Jalan CAP
389 38+195.00 Kanan 7.00 3.00 21.00 Rutin Jalan CAP
390 38+218.00 Kanan 22.00 3.50 77.00 Rutin Jalan CAP
391 38+245.00 Kanan 7.00 2.50 17.50 Rutin Jalan CAP
392 38+259.00 Kanan 11.00 2.50 27.50 Rutin Jalan CAP
393 38+353.00 Kanan 7.00 1.50 10.50 Rutin Jalan CAP
394 38+391.00 Kiri 2.00 2.00 4.00 Rutin Jalan CAP
395 38+398.00 Kiri 9.00 2.00 18.00 Rutin Jalan CAP
396 38+399.00 Kanan 8.00 2.00 16.00 Rutin Jalan CAP
397 38+408.00 Kiri 3.00 2.00 6.00 Rutin Jalan LPA
398 38+413.00 Kiri 4.00 2.00 8.00 Rutin Jalan CAP
399 38+460.00 Kanan 2.00 1.50 3.00 Rutin Jalan CAP
400 38+842.00 Kanan 11.00 2.00 22.00 Rutin Jalan LPA
401 38+940.00 Kanan 6.00 2.50 15.00 Rutin Jalan LPA
402 38+985.00 Kanan 9.00 2.50 22.50 Rutin Jalan LPA
403 39+033.00 Kiri 6.00 3.50 21.00 Rutin Jalan LPA

404 39+050.00 Kanan 6.00 3.00 18.00 Rutin Jalan LPA


405 39+056.00 Kiri 5.00 1.50 7.50 Rutin Jalan LPA
406 39+060.00 Kanan 2.00 2.00 4.00 Rutin Jalan CAP
407 39+094.00 Kanan 4.00 2.50 10.00 Rutin Jalan LPA
408 39+101.00 Full 35.00 6.00 210.00 Rutin Jalan LPA
409 39+325.00 Full 33.00 6.00 198.00 Rutin Jalan LPA
410 39+390.00 Kanan 12.00 2.50 30.00 Rutin Jalan LPA
411 39+535.00 Kiri 4.00 2.00 8.00 Rutin Jalan LPA
412 39+910.00 Kanan 5.00 3.00 15.00 Rutin Jalan LPA
413 40+006.00 Kanan 10.00 3.00 30.00 Rutin Jalan LPA
414 40+049.00 Kanan 5.00 3.00 15.00 Rutin Jalan LPA
415 40+085.00 Kanan 24.00 3.00 72.00 Rutin Jalan LPA
416 40+118.00 Kanan 14.00 3.00 42.00 Rutin Jalan LPA
417 40+144.00 Kanan 2.00 1.00 2.00 Rutin Jalan CAP
418 40+152.00 Kanan 3.00 2.00 6.00 Rutin Jalan LPA
419 40+166.00 Kanan 8.00 2.50 20.00 Rutin Jalan LPA
40+203.00 Kanan 12.00 3.00 36.00 Rutin Jalan LPA
420
40+215.00 Full 6.00 6.00 36.00 Rutin Jalan LPA
421 40+226.00 Kanan 4.00 2.50 10.00 Rutin Jalan CAP
422 40+711.00 Kanan 9.00 3.00 27.00 Rutin Jalan LPA
423 40+722.00 Kiri 6.00 3.50 21.00 Rutin Jalan LPA
424 40+825.00 Full 10.00 6.00 60.00 Rutin Jalan LPA
425 40+865.00 Kanan 9.00 3.00 27.00 Rutin Jalan LPA
426 40+953.00 Kanan 8.00 3.00 24.00 Rutin Jalan LPA
427 41+043.00 Kanan 10.00 2.00 20.00 Rutin Jalan LPA
428 41+127.00 Kanan 10.00 3.00 30.00 Rutin Jalan LPA
429 41+143.00 Full 20.00 6.00 120.00 Rutin Jalan LPA
430 41+325.00 Kanan 6.00 3.00 18.00 Rutin Jalan LPA
431 41+352.00 Kanan 6.00 2.00 12.00 Rutin Jalan CAP
432 42+075.00 Full 14.00 6.00 84.00 Rutin Jalan CAP
433 42+302.00 Kanan 7.00 2.00 14.00 Rutin Jalan LPA
434 42+334.00 Kiri 6.00 3.00 18.00 Rutin Jalan CAP

Total Yang Tidak Tertangani 7,969.90


Total Rutin Jalan -
Total Rutin Kondisi 1,637.00
Total Holding 11,503.70