TRIAL MIX
Project : Trial Mix internal Koboi
Contractor : -
Project Owner : -
Location : PT. Sumbawa Apsara Beton

Trial Date : 22/11/2022


Grade : Fc'40
Slump : 18 +- 2 cm
Material Composition : OPC I ( Conch ) + Sand ( Adigen ) + Coarse Agg ( Havid )

Mix Design Proportion

/ 1 m3 / 0.045 m3 / 0.05 m3 / 0.08 m3


Material Weight (kg) Weight (kg) Weight (kg) Weight (kg)
Cement OPC 1 418 18.81
Coarse Agg 760 34.2
Sand Agg 990 44.55
Water 155 6.98
Polynex NP (0.8%) 3.34 0.150
Polytard S (0.3%) 1.25 0.056
S/A : 56%
W/C : 0.371
Restrain Water use : 2200 ml
Laboratory concrete mixer
Metode trial
Batching plant concrete mixer

Temperature : 31.5° C
Time Result
Start Mixing : 15:08 -
Early Slump : 15:15 18 cm
Slump Retention 1 : 15:30 10 cm
Slump Retention 2 :
Number Of Sample : 6 Sampling
Kode Sample : TM 1 / POLYTARD S

Test
Test Date Age (Day) Number Of Curing Information
Location
Sampling Date Sample Location
22-Nov-22 23-Nov-22 1 1 KK KK
22-Nov-22 22-Nov-22 3 1 KK KK
22-Nov-22 29-Nov-22 7 2 KK KK
22-Nov-22 20-Dec-22 28 2 KK KK

Witnessed by,

Contractor PT. Sumbawa Apsara Beton

(____________________) (____________________)
PT. SUMBAWA APSARA BETON
KONCRETE KOBOI
Jl. Lintas Samota Km.6, Kelapis, Kel. Brang Biji, Kec. Sumbawa
Kabupaten Sumbawa, NTB

TRIAL MIX
Project : Trial Mix internal Koboi
Contractor : -
Project Owner : -
Location : PT. Sumbawa Apsara Beton

Trial Date : 22/11/2022


Grade : Fc'40
Slump : 18 +- 2 cm
Material Composition : OPC I ( Conch ) + Sand ( Adigen ) + Coarse Agg ( Havid )

Mix Design Proportion

/ 1 m3 / 0.045 m3 / 0.05 m3 / 0.08 m3


Material Weight (kg) Weight (kg) Weight (kg) Weight (kg)
Cement OPC 1 418 18.81
Coarse Agg 760 34.2
Sand Agg 990 44.55
Water 155 6.98
Polynex NP (0.65%) 2.72 0.122
Nextard S (0.45%) 1.88 0.085
S/A : 56%
W/C : 0.371
Restrain Water use : 1000 ml
Laboratory concrete mixer
Metode trial
Batching plant concrete mixer

Temperature : 30.3° C
Time Result
Start Mixing : 15:40 -
Early Slump : 15:50 16 cm
Slump Retention 1 : 16:05 11.5 cm
Slump Retention 2 :
Number Of Sample : 6 Sampling
Kode Sample : TM 2 / Nextard S

Test
Test Date Age (Day) Number Of Curing Information
Location
Sampling Date Sample Location
22-Nov-22 23-Nov-22 1 1 KK KK
22-Nov-22 22-Nov-22 3 2 KK KK
22-Nov-22 29-Nov-22 7 2 KK KK
22-Nov-22 20-Dec-22 28 2 KK KK

Witnessed by,

Contractor PT. Sumbawa Apsara Beton

(____________________) (____________________)
PT. SUMBAWA APSARA BETON
KONCRETE KOBOI
Jl. Lintas Samota Km.6, Kelapis, Kel. Brang Biji, Kec. Sumbawa
Kabupaten Sumbawa, NTB

TRIAL MIX
Project : Trial Mix internal Koboi
Contractor : -
Project Owner : -
Location : PT. Sumbawa Apsara Beton

Trial Date : 22/11/2022


Grade : Fc'40
Slump : 18 +- 2 cm
Material Composition : OPC I ( Conch ) + Sand ( Saodah ) + Coarse Agg ( Saodah )

Mix Design Proportion

/ 1 m3 / 0.045 m3 / 0.05 m3 / 0.08 m3


Material Weight (kg) Weight (kg) Weight (kg) Weight (kg)
Cement OPC 1 418 18.81
Coarse Agg 690 31.05
Sand Agg 1040 46.8
Water 155 6.98
Polynex NP (0.65%) 2.72 0.122
Nextard S (0.45%) 1.88 0.085
S/A : 60%
W/C : 0.371
Restrain Water use : 500 ml
Laboratory concrete mixer
Metode trial
Batching plant concrete mixer

Temperature : 30.9° C
Time Result
Start Mixing : 16:47 -
Early Slump : 16:51 15 cm
Slump Retention 1 : 17:06 14 cm
Slump Retention 2 :
Number Of Sample : 6 Sampling
Kode Sample : TM 3 / POLYTARD S

Test
Test Date Age (Day) Number Of Curing Information
Location
Sampling Date Sample Location
22-Nov-22 23-Nov-22 1 1 KK KK
22-Nov-22 22-Nov-22 3 1 KK KK
22-Nov-22 29-Nov-22 7 2 KK KK
22-Nov-22 20-Dec-22 28 2 KK KK

Witnessed by,