QUESTIONS
D) None of these
A) Apprentices
B) FFBL Employees
C) Contractor’s
D) None of These
4) It is important to carefully select and manage contractors to
B) To manage Risks
C) All of These
D) Consequently, achieving successful outcomes
5) To Remove the Hazard physically term is called…?
A) Substitutions
B) Elimination
C) PPEs
D) Engineering Controls
6) To Replace the Hazards the terms is called….?
A) Elimination
B) Administrative Control
C) Substitution
D) Engineering Control
7) To Isolate the people from Hazards called…?
A) Engineering control
B) PPEs
C) Elimination
D) Substitution
8) The term in which to change the way people work is called…?
A) Elimination
B) Administrative controls
C) Engineering control
D) HSE
9) The protect the workers with Personal protective equipment’s is called…?
A) Elimination
B) Engineering control
C) PPEs
D) Substitution
10) A Legally binding agreement usually b/w two parties that they set out the terms
and conditions for their business relationship...?
A) Administrative
C) Contract
D) Contractor
A) Deadlines
B) Scope of Work
D) All of Above
12) Contracts that they set out term and conditions for their….?
A) Personal Benefits
B) Mutual Understanding
C) Business relationship
D) All of Above
13) Man Power of contractors in FFBL is hired through…?
A) HCM
B) S&C
C) L&D
D) Both A and B
B) Work Procedure
D) All of These
15) A contractor who has demonstrated his ability to deliver excepted Results in a
relevant service…?
A) Focal Persons
B) Qualified contractors
C) Bid package
D) Pre-qualified contractors
A) HSE Performance
B) Profile
C) Technical expertise
D) All of above
17) If contractors deviate to compile with agreed/required safety obligation…?
A) Safety performance
B) PPM
C) Safety variance/exception
D) None of these
18) A set of document and information to seek technical and commercial proposal
from a contractor for a specific job…?
A) PSI Packages
B) Bid packages
C) Contract administrator
D) Work Procedures
A) Side Work
B) Safety matters
C) All contracting activities
D) None of these
22) FFBL Management employee nominated by department manager who is
generally the end user of services….?
A) Contract administrator
D) HCM
D) Both A and C
24) A safety unit management employee who will be a single point contact person for
contractor counterpart on safety related matters…?
27) The activities which have or might have a effect on process safety are…?
A) Hiring skilled man power
B) Rental Equipment provision
D) All of above
28) Which jobs are exempted from formal contracting as per ppm…?
A) High value
B) Low value
C) High hazard value
D) Electrical related
29) Contractors having no physical engagement at plant site like ….?
A) IT software support
B) Consulting services
C) Manage Manpower
D) Both A and B
30) Who is responsible for overall implementation at FFBL site &
approval/Rejection of vacancy & exception requests
A) HSEQ
B) GMP
C) HCM
D) Operation UM
31) The Responsibilities of HSEQ are….?
D) All of above
33) The Unit who ensures Incorporation of CSM element in contracting wherever
applicable & conduct SUB HSE CSM also mobilize all required resources…?
A) HSM
B) Project Owner
C) S & C
D) HSEQ
34) HCM Unit is responsible to…?
A) Maintain data of orientation & previous performance of contractor
35) The contractors are responsible to assure that their employees are trained &
communicated through…?
A) HSEQ
B) S & C
C) End User
D) Industrial Clinic
37) Which key step is initial in contracting accordingly management commitment…?
A) Mobilization
B) Pre-qualification
C) Planning and preparation of scop
D) Orientation & Training
38) Management commitment from……… is the basis of a successful safety
programs….?
A) FFBL
B) Contractor
C) Government
D) Both A & B
39) If scope of services for contractor changes, effecting contractor’s capabilities and
risks……. must be conducting…?
A) Evaluation process
B) Pre-qualification process to continue
C) New pre-qualification process
D) Process safety checklist
40) In the pre-qualification process contractor may be previously qualified for….?
A) One year
B) Three months
C) Six months
D) One month
41) In Planning & preparation of scop it is preferable to develop applicable
documents & share with potential bidders at the time of RFQ but as a minimum these
must be approved…?
A) After job execution
B) Bid Packages
C) JSA
D) PPM
D) All of above
D) All of above
45) Demonstrative FFBL Safety system allows Contractor to review…?
A) Safe work practices required while working at FFBL
D) All of above
46) In Commercial terms penalty may be imposed against acts of contractor, causing
….?
D) All of above
A) Advance payment
B) Toolbox
C) Bid Package
D) Government approval
48) For large Scale job contractors proposals are divided into …?
A) Commercial proposal
B) Technical proposal
C) Domestic proposal
D) Both A & B
49) Settlement of technical queries and safety deliverables among contractor and
FFBL End user/safety unit named …?
A) Commercial proposal
B) Domestic proposal
C) Technical Proposal
D) None of these
50) For large scale /complex jobs like Turnaround ,contractors to visit site before
submitting technical proposals this activity called...?
A) Bid Meeting
B) Safety Orientation
C) Pre-Bid Meeting
D) B level Meeting
B) All of these
52) After due review & deliberations most suitable bidder is awarded, job based on...?
A) Cost
B) HSE Qualifications
C) All of these
D) Technical Qualifications
53) In Bidding & job award kick off meeting objectives are….?
A) Contractor to brief on safety plans such as JSAs & Rigging plans
B) HSE & Project Owner will formulate KPIs for the contractor’s performance evaluation
D) All of above
A) Technical document
B) Bridging document
C) JSA document
D) None of these
55)Ensure that all commitments as per mobilization plan are being met.?
C) Contractor Administrator
D) All of above
57) Contractor Safety Officer and FFBL Safety Officer Work together to devise
philosophy for .......... & daily updates.?
A) Bid package
B) Screening Test
C) Safety deliverables
D) Technical plans
C) All Employees
D) Focal Person
B) Contractor
C) Project Owner
D) Safety UM
A) Contractor
C) Project Owner
C) All of these
62) Regular audits and monitoring of contractors during execution & evaluation are
based on… .........approach.?
A) 5P Audit
B) 4P Audit
C) 3P Audit
D) 2P Audit
63) After completion of job .......... make final evaluation of contractor’s performance.?
A) HSE
B) End User
C) Contractor
D) Both A & B
B) Process
C) Performance
D) All of above
65) ……Are the Pillars of CSM Structure...?
A) HCM
B) S & C
C) HSEQ
D) All of above
66) The dedicated Committee continually monitoring the HSE Programs related to
contracting…?
A) PPM
D) Sub HSE ( M )
A) End User
B) Contractor
68) In Variance & Exceptions causes……will assess the contractor request and if
found reasonable will initiate the process for management’s review and approval .?
A) Contractor
B) End User
C) Focal Person
D) Safety Engineer
69) In exception case relevant end user shall apply for the exception process detailing
the action plans to manage the…?
A) Security Risks
B) Safety Plans
C) Potential Risks
D) None of these
Contractor Safety Management
Refreshers
1) Which of the following does not fail under the category of major contracts ...... ?
A) VSM’s
B) FFBL Employees
C) Consultants
D) None of mentioned
B) Pre-qualification checklist
A) End User
B) HCM
C) HSEQ
D) S & C
D) Approved JSA
10) Who is responsible for establishing and maintain contractor safety orientations at
FFBL?
A) Contractor himself
B) HSEQ
C) Project Owner
D) S & C
A) Work permit
B) PPEs
A) S & C unit
B) Project Owner
C) HSEQ
D) HCM