Professional Documents
Culture Documents
Part 1
Part 1
CONDITIONS
GENERAL CONDITIONS
SECTION I- DEFINITIONS AND
DOCUMENTS
contract documents
• agreement
• general conditions
• special provisions
• specifications and supplementary
specifications
• drawings
key players
• owner
• architect
• engineer
• project representative
• contractor
• sub-contractor
CONTRACT DOCUMENTS
GENERAL CONDITIONS
bonds
proposal bond : guarantee to enter into a contract if awarded
performance bond : guarantee to execute the work in accordance with
the terms of the contract (15% of contract amount,
upon contract signing)
payment bond : guarantee to pay all obligations arising from the
contract (15% of contract amount upon contract
signing)
guarantee bond : guarantee workmanship and quality of materials
and equipment for 1 year (30% of contract amount)
CONTRACT DOCUMENTS
GENERAL CONDITIONS
Work of the Contractor
Furnish : purchase/ fabricate and deliver
Install : build in, mount in position, connect, apply for
intended use
Provide : furnish and install
CONTRACT DOCUMENTS
GENERAL CONDITIONS
bidding
• proposal
• tender documents
• invitation to bid
• bid bulletin
• instruction to bidders
CONTRACT DOCUMENTS
GENERAL CONDITIONS
Art. 2: execution, correlation and intent of documents
• signature on documents- by owner and contractor
• intent of contract documents- complementary and binding
• conformity to the contract documents
• contract documents at site of work
• ownership of contract documents and models- by the Architect
CONTRACT DOCUMENTS
GENERAL CONDITIONS
Art. 3: drawings and specifications
• copies of drawings and specifications
• coordination of drawings and specifications
• clarification of meaning- cost arising from discrepancies in
information
• discrepancies in drawings- necessary adjustments to produce first
class work
CONTRACT DOCUMENTS
GENERAL CONDITIONS
Art. 4: detail drawings and inspections
• supplementary drawings and instructions-
to be considered of equal force
• schedule for submission of detail and shop drawings-
setting drawings, templates, patterns at contractor’s
expense
CONTRACT DOCUMENTS
GENERAL CONDITIONS
Art. 5: shop drawings
•conditions in the preparation of shop drawings
•checking drawings of sub-contractors
•identification
•letter of transmittal
•corrections, changes and variations
•responsibility for accuracy
CONTRACT DOCUMENTS
GENERAL CONDITIONS
SECTION II- LAWS, REGULATIONS, SITE
CONDITIONS, PERMITS, TAXES
Art. 6: laws, regulations and site conditions
• laws and regulations- codes, ordinances services/
utility regulations
• site conditions- visit prior to bidding
CONTRACT DOCUMENTS
GENERAL CONDITIONS
Art. 7: permits, taxes and surveys
• permits and licenses
• taxes
• construction stakes and reference mark
• services of licensed surveyor
• final certification
CONTRACT DOCUMENTS
GENERAL CONDITIONS
SECTION III- EQUIPMENT AND MATERIALS
Art. 8: general (equipment and materials)
Art. 9: equipment
•quality of equipment
•equipment approval data- complete catalog data
CONTRACT DOCUMENTS
GENERAL CONDITIONS
Art. 10: materials, fixtures, appliances, fittings
CONTRACT DOCUMENTS
GENERAL CONDITIONS
Art. 11: materials, equipment, fixtures, appliances
and fittings furnished by the owner
Art. 12: royalties and patents
Art. 13: manufacturer’s directions
CONTRACT DOCUMENTS
GENERAL CONDITIONS
SECTION IV- PREMISES AND TEMPORARY
STRUCTURES
Art. 14: use of premises
• limitation of use- legal provisions
• safeguard for structure- safety concerns
CONTRACT DOCUMENTS
GENERAL CONDITIONS
Art. 15: temporary structures and facilities
• office and contractor’s building • stairs, ladders, ramps,
runways
• housing for workers
• elevators and hoists
• sanitary facilities and first aid station
• temporary enclosures
• barricades and guard lights
• trial usage
• water, power and telephone facilities
• removal of temporary
• signs
structures
• roadways
CONTRACT DOCUMENTS
GENERAL CONDITIONS
Art. 16: protection of work and owner’s property
• safeguard measures- theft, fire, damage
• old materials
• trees and other plants- protection, transplanting, removal
• drainage- altering waterways
CONTRACT DOCUMENTS
GENERAL CONDITIONS
Art. 17: protection of adjacent property and
existing utilities
• contractor’s sole responsibility
• existing utilities
CONTRACT DOCUMENTS
GENERAL CONDITIONS