Professional Documents
Culture Documents
Revised Artiaga A03
Revised Artiaga A03
84
0.15 1.69 1.54 0.30
4 3 2 1 1 2 3 4
0.30
0.30
0.30
0.30
1.60
1.60
apex of building apex of building
1.30
1.30
0.300.80
0.300.80
top of beam top of beam
3.00
3.00
2.70
2.70
2.70
2.70
2.40
2.40
0.66
0.66
2nd flr line 2nd flr line lav lav
7.10
7.10
1.40
1.40
0.30
0.30
water water
0.34
0.34
closet closet
0.50
0.50
3.00
3.00
2.70
2.70
0.10
0.10
FFL FFL
0.60
0.60
0.60
0.60
NGL NGL
D C
1 LEFT SIDE ELEVATION 2 RIGHT SIDE ELEVATION
A3 SCALE 1:100M A3 SCALE 1:100M
1.84 1.50
A B C D E F A B C D E F
0.30
0.30
0.30
0.30
13.87 13.87
1.60
1.60
0.58 0.39 0.58 1.34 1.21 0.41 2.00 0.43 1.48 1.45 1.42 2.34
1.30
1.30
0.40 0.94 1.21 0.64 1.60 0.610.43 0.87 0.60 1.02 0.35 0.87 0.60 1.04 2.49
3.00
3.00
0.75
0.70
2.70
2.70
4 4
0.66
1.44
lav
1.40
1.40
2.85
2.85
2.55
2.85
water
0.34
closet
1.41
0.50
3 3
0.55
0.10
0.10
1.49
1.50
1.60
8.70
3.00
8.70
3.00
2.70
10.57
A A B
1.51
1.50
0.85
2 2 1.44 0.15
1.59
1.35
2.00
1.02 0.27 0.30
2.85
2.85
2.55
1.50
0.61
0.85
0.71
1 1
1.17
1.00
1.17
UP
2.24
1.95
S E C O N D F L O O R L I N E
TOILET
1.10
0.30 1.56 1.35 0.30 2.57 0.30 2.64 0.30 2.55 0.30 2.54 0.30
PLAN
3 ROOF PLAN 4 GROUND FLOOR REFLECTED CEILING PLAN 5 TOILET DETAILS
A3 SCALE 1:100M A3 SCALE 1:100M A3 SCALE 1:100M
3 12