Construction Value Engineering Log

Company Name
Under Review
Approved
Declined
STATUS FURTHER ACTION
DATE OF DATE
REF DESCRIPTION DATE VALUE STATUS VALUE ACCEPTED VALUE DECLINED BALL IN COURT ACTION REQUIRED COMMENTS
DECISION REQUIRED
Deletion of the handrails along the balcony -
Finalize design of handrail
1 probably a bad idea for a value engineering 20-Apr-20 $ 50,000.00 Under Review 30-Apr-20 $ 30,000.00 Architect 30-Apr-20
placement (minimum requirements)
item.

This template was design by Construction Repository (https://www.constructionrepository.com) Page 1 of 2