You are on page 1of 4

24/04/2023, 13:55 Operations Management - - Unit 5 - Mid Term Quiz

(https://swayam.gov.in) (https://swayam.gov.in/nc_details/IIMB)

vijaypavanbudi@gmail.com 

IIMB (https://swayam.gov.in/explorer?ncCode=IIMB) » Operations Management (course)

Course
outline Mid-term
Assignment not submitted Due date: 2023-04-28, 23:30 IST.
Week- 0 Each question carries 1 mark.
Welcome ()
1) If an organisation has taken over a firm that supplies raw material, which of the 1 point
Week 1: following costs would reduce?
Understanding
Carrying cost
Operations ()
Ordering cost
Week 2: Both cost will be reduced
Analyzing No change in any cost
Capacity in
Operations ()

2) In a service firm, the following decisions are taken. What would be the impact of 1 point
Week 3:
such decisions on performance measures – Cost, Quality, Delivery and Flexibility,
Supply
Chain in
Decision 1 (D1): Training program for skill upgradation and Multiskilling of the workforce.
Operations ()
Decision 2 (D2): Standard Operating Procedures deployed at key steps in the process.

Mid Term
Quiz () D1– No change in quality; D2- Increase in quality;

Quiz: Mid- D1 – Increase in Quality; D2- Increase in cost;


term D1 – Decrease in delivery; D2- Increase in delivery;
(assessment?
D1 – Increase in quality; D2- Increase in Delivery;
name=147)

Week 4:
Productivity 3) Which option describes the following operating systems in the decreasing order of 1 point
Improvement complexity; (A – Organising a football tournament, B – Construction of an international airport, C
in – Manufacturing of Papers Rolls of Standard Size, D – ATM Facility of a Bank)
Operations ()
B,D,C,A
B,C,A,D

https://onlinecourses.swayam2.ac.in/imb23_mg19/unit?unit=146&assessment=147 1/4
24/04/2023, 13:55 Operations Management - - Unit 5 - Mid Term Quiz

Week 5: B,A,C,D
Assuring C,A,D,B
Quality in
Operations ()
4) The time taken for a potter to make a pot, starting from bringing the mud, loading it 1 point
  onto the potter wheel, turning the wheel to shape the pot, drying and heat treating the pot is 6
hours. He starts working daily at 8 AM. Assume no stock at the beginning. Which of the following
statements is True ?

The time to deliver the first pot cannot be determined


Throughput time is equal to cycle time when the batch size is 1.
The second pot can be delivered at 2 PM if the batch size is greater than 1.
All the above

5) A manufacturing system has output rate of 10 units/hour. A process with capacity of 1 point
10 units/hr, is increased to 20 units/hr, then which of the following is true?

Increase the output of the system to 20 units/hour


Increase the output of the system to at most 20 units/hour
There will definitely be an increase in the output of the system, but the quantity of
increase cannot be determined with the given data
There may or may not be an increase the output as it depending on the capacity of the
rest of the processes.

6) Operations process of which of the following items is different from others? 1 point

Ship Building
Building a Subway in a Metro
Satellites
Cell phone Manufacturing

7) When the arrival rate and service rate of a system doubles, the queue length  1 point

Remains Constant
Doubles
Halves
Cannot be determined

8) Which of the following contributes to the bullwhip effect? 1 point

Many customers at the end of the supply chain


Many suppliers at the beginning of the supply chain
Many layers in the supply chain
All the above

https://onlinecourses.swayam2.ac.in/imb23_mg19/unit?unit=146&assessment=147 2/4
24/04/2023, 13:55 Operations Management - - Unit 5 - Mid Term Quiz

9) In order to analyse the capacity of a sugar mill, which of the following is not a 1 point
necessary information?

The number of machine maintenance staff per shift


The number of security personnel guarding the establishment
The amount of sugar cane that can be crushed per hour by the crushing machine(s)
Both a and b

10) In order to design a supply chain, which of the following needs to be considered? 1 point

Customer profile
Supplier location
Product profile
(A) and (C) above

11) In a worker paced assembly line, if the demand is 30/hr and the sum of processes 1 point
time is 10 min, what is the minimum number of stations required to ensure a cycle time of 5 min?

3
4
5
6

12) A firm which was offering a standard product, has started offering different 1 point
variations. Which of the following statement(s) is/are correct in this context?

Flow becomes complex


Delivery may get delayed
Inventory may decrease
Options a and b

13) In designing an efficient supply chain, which of the following factors are important   1 point

High margin in the product 


Stable demand pattern
Coordinate supply chain partners
Trendy items with high seasonality in sale

14) Which of the following products would need a responsive supply chain? 1 point

A wrist watch manufacturer


A paper product manufacturer

https://onlinecourses.swayam2.ac.in/imb23_mg19/unit?unit=146&assessment=147 3/4
24/04/2023, 13:55 Operations Management - - Unit 5 - Mid Term Quiz

Detergent manufacturer
All the above

15) Which of the following activities does not come under the purview of operations 1 point
management?

Plan of material flow in the manufacturing system


Estimating the Delivery schedule of the orders
Deciding on the number of variations of a product that should be launched in the markeT
None of the above

You may submit any number of times before the due date. The final submission will be
considered for grading.
Submit Answers

https://onlinecourses.swayam2.ac.in/imb23_mg19/unit?unit=146&assessment=147 4/4

You might also like