停电

Nagad维保中心2022年02月02日施工计划申请表
Daily Work Plan Application Form of Nagad Maintenance Center in February.02,2022
限速及
序 月计 施工项 施工时 施工车 是否 行车方 设备 主体单位
号 划号 类别 目 间 区间 行别 起止里程 辆 始发站 终到站 作业内容及要求 影响行车范围 停电 式变化 变化 及负责人
联系电话 配合单位 备注
Speed
limit
Monthl Equip
Constru Up and K342+000
Starting and power and Main Unit
y Plan Work Work Starting Ending Work Content Affected Power ment
No. type ction Section Down Ending ON/ change and person phone number Unit of Suit remark
Numbe Time Train Staion Station and Requirements operation area outage range Chang
Item Line Mileage OFF in in charge
r es
operatio
n
K342+000
工务工区 Track Maintenance Workshop 范围

CT314;
Worker 120min Bike -
single Rail Chun Yun Bike track
1 III - Bike Mieso Worker deliver / ON / / / 0974382321 /
deliver utes meiso
track car+N1 Li maintance

CT314;
Pick 120min mieso - single Rail Chun Yun Bike track
2 III - Mieso Bike Pick Worker up / ON / / / 0974382321 /
Worker utes bike track car+N1 Li maintance
up

K368+000
CT211; Turnout101#
Mainten 、103#、10 Turnout101#、10
ance of 5#、107#、 3#、105#、107#
turnout 240min dewanle 102#、104# Maintenance of turnout 、102#、104#、1 Jin You Ets
II station ON / / / 0968059971 dewanle ets
with utes station 、106#、10
K368+000 with small machinery 06#、108#、110# Zhang cooperation
small 8#、110#at at Dawanle
machine Dawanle Station
ry Station

电务工区 ETS workshop


(dewanle
K642+000 substation
- :211feeder
K662+516 line
Use catenary Affecting
TPS 201 operating vehicles drivek622+823- dewanle
Overhau 240min singl Ets substation
5 II l of dewanle e rail Dawanle Aysha for catenary k662+516 OFF ; 213 Yong Han 0941616078 dewanle ets
catenar utes -aysha
track car+N1
maintenance, affecting
feeder
y Separate phase power k641+025- line)
maintenance k666+864 k641+025-
k666+864
power
outage
停电

Nagad维保中心2022年02月02日施工计划申请表
Daily Work Plan Application Form of Nagad Maintenance Center in February.02,2022
限速及
序 月计 施工项 施工时 施工车 是否 行车方 设备 主体单位
号 划号 类别 目 间 区间 行别 起止里程 辆 始发站 终到站 作业内容及要求 影响行车范围 停电 式变化 变化 及负责人
联系电话 配合单位 备注
Speed
limit
Monthl Equip
Constru Up and Starting and power and Main Unit
y Plan Work Work Starting Ending Work Content Affected Power ment
No. type ction Section Down Ending ON/ change and person phone number Unit of Suit remark
Numbe Time Train Staion Station and Requirements operation area outage range Chang
Item Line Mileage OFF in in charge
r es
operatio
(lonies n
substation
TPS208 ;范围
211
Inspect Traction feeder
ion and substation line
equipment
mainten 240min Lonnis k464+674-
7 II ance of Substati stati overhaul, outdoor k507+634affect OFF lonies sub Xiaoquan 0943000583 dire dawa
tractio utes
on equipment station ; Chen ets
on overhaul, power
n 213feeder
substat substation with line)
power failure k464+674-
ion
k507+634
power
outage
工务:
制 表: 张涛 张涛 施工单位负责人审核: 赵永君 日计划主任审批:
电务:

track
Tao
Lister: Zhang
maintenance: Tao Zhang work unit director: Yongjun Zhao Daily plan director:
ETS:

提交时间:
Application time: 31-Jan-2022