停电

Nagad维保中心2022年02月02日施工计划申请表
Daily Work Plan Application Form of Nagad Maintenance Center in February.02,2022
限速及
序 月计 施工项 施工时 施工车 是否 行车方 设备 主体单位
号 划号 类别 目 间 区间 行别 起止里程 辆 始发站 终到站 作业内容及要求 影响行车范围 停电 式变化 变化 及负责人
联系电话 配合单位 备注
Speed
limit
Monthl Equip
Constru Up and K336+000
Starting and power and Main Unit
y Plan Work Work Starting Ending Work Content Affected Power ment
No. type ction Section Down Ending ON/ change and person phone number Unit of Suit remark
Numbe Time Train Staion Station and Requirements operation area outage range Chang
Item Line Mileage OFF in in charge
r es
operatio
n
K336+000
工务工区 Track Maintenance Workshop 范围

CT314;
Worker 120min bike~me
single civil rail Bike track
III - Bike Mieso Worker deliver / ON / / / Jin Bo Wang 0973474755 /
deliver tes iso track car +N1 maintance
K467+000
1
CT314;
Pick 120min meiso single civil rail Bike track
III - Mieso Bike Pick Worker up / ON / / / Jin Bo Wang 0973474755 /
Worker utes ~bike track car +N1 maintance
up
CT211;
Mainten K347+000
ance of
- Maintenance of line Jin Ping
line with / 0914996089 /
with small machinery Zhang
small
2 machine
ry K347+000
K329+000
- Chun Yun
Move Move / 0974382321
K385+000 Li

K475+000 (Afdem
TPS201O Use catenary sebstation
verhaul singl Ets operating vehicles Affect power 211, 213)
3 II 240min bike - Bike Mieso for catenary OFF / / Chuanjin 0904380607 bike ets
of utes mieso e rail maintenance, k346+801- power Han
catenar track car+N1 k386+040 outage
y Separate phase k346+801-
maintenance
k386+040

TPS208 Traction
Inspect substation
ion and
equipment
mainten Dawanle overhaul, outdoor Xiaoquan
4 ance of Substati equipment k Chen 0943000583
tractio on
overhaul,
n substation with
substat power failure
ion
停电

Nagad维保中心2022年02月02日施工计划申请表
Daily Work Plan Application Form of Nagad Maintenance Center in February.02,2022
限速及
序 月计 施工项 施工时 施工车 是否 行车方 设备 主体单位
号 划号 类别 目 间 区间 行别 起止里程 辆 始发站 终到站 作业内容及要求 影响行车范围 停电 式变化 变化 及负责人
联系电话 配合单位 备注
Speed
limit
Monthl Equip
Constru Up and Starting and power and Main Unit
y Plan Work Work Starting Ending Work Content Affected Power ment
No. type ction Section Down Ending ON/ change and person phone number Unit of Suit remark
Numbe Time Train Staion Station and Requirements operation area outage range Chang
Item Line Mileage OFF in in charge
r es
operatio
n
范围
工务:
制 表: 张涛 张涛 施工单位负责人审核: 赵永君 日计划主任审批:
电务:

track
Tao
Lister: Zhang
maintenance: Tao Zhang work unit director: Yongjun Zhao Daily plan director:
ETS:

提交时间:
Application time: 31-Jan-2022