PCJL/BSP/HSE/JSA/07-2019/36
Date:
il PetroChina International A 12 JULI 2019
& = BSP) Jabung Ltd. Job Safety Analysis
SkKMIgAS rewemein —nieeoee 5
JOB: LIFTING FOR NEW COOLER AT NGF Tite ofperson ‘Analyzed
PENGANGKATAN COOLER DI NGF who does the job: ‘Work Crew/Work Grew Leader
} Lc
Deparment? ] Sections Reviewed Bye ‘Approved by
Project PT, Bina Sarana Putra WorkCrepySupy/Delegate: Area Supv/Delegate: _F/SSupvDelegate: | Work Crew Supt/Delegate:
| 1 Bret bl
| AL Yai Fo kom Hen Greate ,
Personal protective equipment (PPE):
PY RL on PPE required fora safe ob.
11, SCBA
16. Safety shoes /boots |v)
12, Gloves ~ Ordinary
17. Rubber boots
joves - Chemicals
18, Prot. Clothing 7 Apron
14, Gloves - Thermal
19. Body harnesses, Lline
Write down correct specications of personal
protective equipment required (Consult HSE Dept) :
5. Goggles ~ Chemicals, 15. Rubber gloves 20. Life vest
Sequence of Basic Job Steps Potential Hazards Protective Equipment Safe Procedures
1. Team Work & Communication > Miscommunication > Pre-job safety meeting,
job.
> Discuss emergency response
preparedness to workers if
‘emergency situation happen.
> Good communication
personnel.
> Everyone has permission to
stop the job
with
1. Kerjasama & komunikasi
v|
‘Miskomunikasi
> Kesalahpahaman
> Terjadi kegagalan
> Melakukan pembicaraan
keselamatan sebelum bekerja.
> Membicaratan JSA kepada
‘SB-WB PERMANENT FACILITIES CPS MODIFIFATION / BCD -518-CAMembicarakan tanggap darurat
ke pekerja jika terjadi situast
darurat.
> Komunikasi yang baik antar
personil
> Setiap orang mendapatkan hak
untuk menghentikan_pekerjaan
Gika dapetmembahayakan
pekerja dan plant.
Z Prepare Document, Tools, and 5 Pinch point ¥ Usehand gloves Be carefalwhen pick up tools
Equipment > Miscommuni > Watch body position.
> Misunderstanding > Everyone must pay atention at
> Failure alltimes.
>
>
>
accepted and reviewed.
2 Mempersiapkan dokumen dan alat- | > Terjepit 5 Menggunokan serang tangan ¥ Berhatihathetikar mengarbit
‘lat > Miskomunikast peralacan
> Kesalahpahaman » —Memperhatikan posis! tubuh.
> Terjadi kegagalon > Setiap orang aru
‘memperhatikan — pekerjaannya
dlanlingkargannya setiap wake.
> Tetap focus
> Memastikon semua _peralatan
| siap untuk digunakan.
> Memastikor semua dokumen
telah diseujui dan ditinjaw
kembalt
3 Secure area 5 Unauthorized personnel Barricade tape 7 Safety Tine Supervisor must know area for
> Other activity inthe same area > Warning sign work,
‘SB-WB PERMANENT FACILITIES CPS MODIFIFATION / BCD -518-CA
To ensure.area safe for work.
> Barricade area with tag line and
give waning sign for
‘unauthorized personnel‘3. Mengamankan area kerja > Personil yang tidak berkepentingan > Garis barikade > Supervisor harus mengetahui
> Kegiatan lain di area yang sama > Tanda bahaya area kerja yang akan dikerjakan,
> Memastikan area kerja aman
untuk bekera.
> Barikade rea dengan garis
barikade dan warning sign yang
tidak berkepentingan dilarang
‘masuk.
4 Mobilization to workarea > Hitby pipe existing / broken bridge > Survey > Doa survey of the road that wil
> Tip / vanish > Medical check be passed.
> Bum > Warning sign > The drivers in good health.
> Crush > Barricade > Measure the height of pipe rack.
> Slipping into trench > Sparkarrester > Checking of the bridge that will
> Gas test be passed.
> Fire Extinghulser > Coordination with PCJL.
> Inspection > The road enough to maneuvey
‘SB-WB PERMANENT FACILITIES CPS MODIFIFATION / BCD -518-CA
the trailer tuck.
> Given barrisade/warning sign 0
dangerous area.
> The trailer truck is equipped
spark arresterin plant.
> Perform tesing of gas to the road
to be traversed,
>
> .
> There is dways Flagman at
crossroad.
> Make sure there are escort
safetyman.
> The speed does not exceed 1
anh at theplant.
> Ensure all vehicle in good
condition and have bee
inspected properly.
>» The tremh close enough
sandbags (fnecessary).
® Use a plateto cover the trench (i
necessary).% Mobilisasi ke area Kerja
vvvyy|
TTerkena pipa existing /jembatan rusak
Terguling/Amblas
Kebakaran
Tabrakan
Tergelincir kedalam parit
Survey
Pemeriksaan kesehatan
‘Tanda bahaya
Bariket
Sparkarrester
Gas tes
APAR
Inspeksi
vyvvvvyy
vy vy
v
v
v
a
Takakan arvey terhadap jalay
‘yang akan dilewati.
‘sopir dalam keadaan sehat.
Ukur tinggidart pipe rack.
Pengecekan terhadap_jembatan
‘yang akan d laut
‘Koordinasidengan PCJl.
Jalan cukup untuke manuver tru
trailer.
Pasang bariket/tanda bahayg
pada area yang bahaya,
Truk traler dilengkapl spa
arrester dalam plant.
Lakukan pengetesan gas terhada
Jalan yang akan di
Sediakan alat
ringan.
Patuhi rambu-rambu yang ada,
Flagman selalu ada di simpang
Jalan.
Pastikan ada safetyman yar
mengawal
Kecepatan tidak melebihi 1
sam/jam di dalam plant.
Kendaraan dalam kondisi ball
dan layak digunakan serta telaly
dl inspeksi
Kantong pasir cukup menutup
part (jika peru).
Pergunakan plat untuk menutue]
parit (ja prtu).
radam ap
5. Lifting cooler and coalescer filter
with crawler crane 55 Ton
vyvvyy
Hand pinched /injured
Hitby equipment
‘Swing carwler crane hit by pipe rack
Broken of equipment
‘Tumbled of trailer truck
Workers dehydration
Timber
Use hand gloves
Tagline
Warning sign
Baricade
SWL
Slink belt
Water drink
>
>
>
>
>
>
>
vvvy
Hand position do not under the
material and equipment.
Use wood to blocks.
Use hand gives.
Use the rope to guide equipment.
The condition of operator is
good.
‘The operator to instructed by
‘SB-WB PERMANENT FACILITIES CPS MODIFIFATION / BCD -518-CA
4rigger have certification.
Ensure workers position not
under the equipment.
The workers are in safe
distance.
Install warning sign If crawler
crane on operation.
Workers unauthorized are not
allowed in the work area.
Make sure the slinkbelts in
accordance with SWL and do
Inspection before use.
Make sure the crawler crane Is
at a safe distance with the pipe
rack.
Make sure the equipment to tied
in correctly.
Used the slink belt for tied the
equipment.
Make sure the slink long
enough.
Ensure the position of crawler
crane is not tilt and stable,
Install base plate necessary.
Make sure the crawler crane
position onahard land.
Make sure the load is lifted does
not exceed the SWL and the
radius corresponding to the
load chart
Make sure there is enough
water in the work area.
. Pengangkatan cooler dan coalescer
filter menggunakan crawler crane 55
Ton
> Tangan terjepit/teriuka
> Tertimpa/terbentur peralatan
> Swing crawler crane menabrak pipe rack
> Peralatan jatuh
> Truck trailer terbalik
> Pekerja dehidrast
z
‘SB-WB PERMANENT FACILITIES CPS MODIFIFATION / BCD -518-CA
> Timber
> Gunakan sarung tangan
> Tall pandu
> Tanda bahaya
> Bariket
>
>
Posisi tangan tidak di bawal
peralatan dan material.
Gunakan balok kayu sebaga
ganjal
Gunakan sorung tangan.
Gunakan tli untuk mengarahkan,> Airminum > Operator dalam keadaan sehat.
> Operator diarahkan oleh rigger
‘yang berserifikat.
Pekerja tidak berada a
v
peralatan dan material
> Pekerja berada dalam jarak yan
> Pasang tanda bahaya bila cravler
crane sedang beroperast.
> Pokerja yang tidal
berkepentingan tidal
diperbolehkan berada di ar
kerja.
> Pastikan sing belt sesuai dengan
‘SWLnya dan lakukan inspeksi.
> Crawler cre berada pada
Jarak amandengan pipe rack.
> Pastiken peralatan ditkat denga
benar,
> Gunakan slink belt —untu
‘mengikat peralatan,
> Pastikan pasjang sling cukup.
> Pastikan posisi crawler crang
tidak miriyg dan stabil, bil
diperlukan pasang base plate.
> Pastikan posisi crawler crane dj
‘tanah yang teras.
Pastikan beban yang ed
ea
tidak meletini SWL dan datar
radius yang sesuat dengan loa
chart,
Pastikan tersedia air minum.
‘yang cukupdi area kerja,
e
v
6 Housekeeping Pinch Points Use hand gloves Usehand ghoves
> Ensure no vaste at work area
> Ensure ares clean before finish
job.
> Supervisor shall full monitoring
the workers safety performance
em
‘SB-WB PERMANENT FACILITIES CPS MODIFIFATION / BCD -S18-CA 6‘at__work location and
immediately corrected them if
‘any found substandard
action/concition.
6 Membersihkan area kerja
> Terjepit
> Gunakan sarang tangan
Tenggunalan sarang tangan
Memastikantidakada sampah dt
area ker
Memastikan oreo. kero. bersih
Sebelum mexgakthir pekerjaan.
Supervisor harusmemantaw
ksealamatan pekerja di daerah
pekerjaan nereka dan langsung
membetulkn kesalahan pekerja
‘ka terdapatpertlaku tidak
‘man ataepun kondstyang
tidak aman,
Remarks:
Pls Poride Lptiy pln and wi
‘SB-WB PERMANENT FACILITIES CPS MODIFIFATION / BCD -518-CA