INSPECTION AND TEST PLAN FOR FABRICATION AND BLASTING & PAINTING OF WATER JACKET ASSEMBLY (UPPER AND LOWER)
Intervention
S/N Description / Activity Controlling Procedure Specification Acceptance Frequency Verification Report (M,H,W,R,S,RW,A)* Comments /
Criteria Reference of Test Personnel Reference No. Remarks
UNISCO SANVIRA
Approved GA &
1.1 Prepration and approval of IFC Drawings, ALL Design Engineer, H A
AISC 360 Fabrication
Details Shop drawings PO, Planning Engineer
Drawings.
INSPECTION AND TEST PLAN FOR FABRICATION AND BLASTING & PAINTING OF WATER JACKET ASSEMBLY (UPPER AND LOWER)
Intervention
S/N Description / Activity Controlling Procedure Specification Acceptance Frequency Verification Report (M,H,W,R,S,RW,A)* Comments /
Criteria Reference of Test Personnel Reference No. Remarks
UNISCO SANVIRA
1.8 Preparation, Review and approval ----- QA-QC Manager, Approved Leak H A
Project Specification Project Specification
of Hydro test procedure QA-QC Engineer test Procedure
Approved Blasting and painting BSEN/ASTM /ASME Applicable QA-QC Inspector / Inspection Report
2.3 Receiving Material Inspection for H R
Procedure, Approved Material Codes 100% Engineer (J303-01) & Batch
Abrasives and paints
Indent & LPO/FPO Store Keeper test certificates
COMPANY CONTRACTOR PROJECT
INSPECTION AND TEST PLAN FOR FABRICATION AND BLASTING & PAINTING OF WATER JACKET ASSEMBLY (UPPER AND LOWER)
Intervention
S/N Description / Activity Controlling Procedure Specification Acceptance Frequency Verification Report (M,H,W,R,S,RW,A)* Comments /
Criteria Reference of Test Personnel Reference No. Remarks
UNISCO SANVIRA
Production
3.1 UNISCO[W]ME002, AWS D1.1 M M
Marking & Cutting UNISCO[W]ME002 ---- Engineer & QC -
and AISC 360
Inspector
Production
3.5 Approved Fabrication drawings, AWS D1.1 Table 6.1 and Inspection Report H W
Final Weld visual Inspection 100% Engineer & QC
Approved Project Quality Plan AISC 360 J303-02
Inspector
Non-Destructive Examination
Approved Fabrication drawings, Refer NDT Level II REFER GENERAL
3.6 UT (In-house) Approved Project Quality Plan, AWS D1.1 General as per NDT Reports H M
NOTES-1 & 2
Approved NDT procedures Notes -1&2 ASNT SNT-TC-1A
PT (In-house) (MPI/PT/UT)
COMPANY CONTRACTOR PROJECT
INSPECTION AND TEST PLAN FOR FABRICATION AND BLASTING & PAINTING OF WATER JACKET ASSEMBLY (UPPER AND LOWER)
Intervention
S/N Description / Activity Controlling Procedure Specification Acceptance Frequency Verification Report (M,H,W,R,S,RW,A)* Comments /
Criteria Reference of Test Personnel Reference No. Remarks
UNISCO SANVIRA
Production
3.8 Hydro test (6 kg /cm²) of lower , Project specification and Project specification and Inspection Report H H
100% Engineer & QC
upper water jackets. purchase order clause j) purchase order clause j) J303-05
Inspector
INSPECTION AND TEST PLAN FOR FABRICATION AND BLASTING & PAINTING OF WATER JACKET ASSEMBLY (UPPER AND LOWER)
Intervention
S/N Description / Activity Controlling Procedure Specification Acceptance Frequency Verification Report (M,H,W,R,S,RW,A)* Comments /
Criteria Reference of Test Personnel Reference No. Remarks
UNISCO SANVIRA
INSPECTION AND TEST PLAN FOR FABRICATION AND BLASTING & PAINTING OF WATER JACKET ASSEMBLY (UPPER AND LOWER)
Intervention
S/N Description / Activity Controlling Procedure Specification Acceptance Frequency Verification Report (M,H,W,R,S,RW,A)* Comments /
Criteria Reference of Test Personnel Reference No. Remarks
UNISCO SANVIRA
6.0 BLASTING AND PAINTING - PAINTING OF PRIMER AND TOP COAT (TYPICAL FOR ALL COATS)
Each coat,
Approved Blasting Painting
WFT as per paint manufacturer Approved Drawings, Free from
Procedure, Inspection Report S
6.1 recommendation Runs, sags & Wrinkles, 100% Painting Inspector H
Paint manufacture's data sheets Format: J303-03
Visual inspection WFT
(TDS)
& DFT check
INSPECTION AND TEST PLAN FOR FABRICATION AND BLASTING & PAINTING OF WATER JACKET ASSEMBLY (UPPER AND LOWER)
Intervention
S/N Description / Activity Controlling Procedure Specification Acceptance Frequency Verification Report (M,H,W,R,S,RW,A)* Comments /
Criteria Reference of Test Personnel Reference No. Remarks
UNISCO SANVIRA
Coating System
COMPANY CONTRACTOR PROJECT
INSPECTION AND TEST PLAN FOR FABRICATION AND BLASTING & PAINTING OF WATER JACKET ASSEMBLY (UPPER AND LOWER)
Intervention
S/N Description / Activity Controlling Procedure Specification Acceptance Frequency Verification Report (M,H,W,R,S,RW,A)* Comments /
Criteria Reference of Test Personnel Reference No. Remarks
UNISCO SANVIRA
INSPECTION AND TEST PLAN FOR FABRICATION AND BLASTING & PAINTING OF WATER JACKET ASSEMBLY (UPPER AND LOWER)
Intervention
S/N Description / Activity Controlling Procedure Specification Acceptance Frequency Verification Report (M,H,W,R,S,RW,A)* Comments /
Criteria Reference of Test Personnel Reference No. Remarks
UNISCO SANVIRA
*Inspection and test mark-up legend: M = Monitor point, W = Witness Point, H = Hold Point, R = Review point, A= Document Approval, S= Surveillance
Hold Point (H): A critical step in fabrication and testing where it is mandatory that M/s. SANVIRA and/or their respective representative inspect the component/equipment or
witness an activity. Activities designated as a Hold Point shall not proceed unless M/s. SANVIRA and/or their respective representative is present or the Hold Point is formally
waived. The M/s. SANVIRA and/or their respective representative shall be notified as per duration specified in the contract in advance of the activity.
Witness Point (W): A critical step in fabrication and testing where it is desirable that the M/s. SANVIRA and/or their respective representative inspect the
component/equipment or witness an activity. M/s. SANVIRA and/or their respective representative shall be notified as per duration specified in the contract in advance of the
activity. Once proper notification is given, the activity may proceed according to the schedule regardless of the M/s. SANVIRA and/or their respective representative
attendance.
Review Point (R): A critical step in design, procurement, and or fabrication and testing where it is desirable that the M/s. SANVIRA and/or their respective representative
review of the document. No notification is required
Document Approval (A): A critical step in design, procurement, and or fabrication and testing where it is mandatory that the M/s. SANVIRA and/or their respective
representative approve a document/qualification/ equipment/or activity. M/s. SANVIRA and/or their respective representative shall be notified at a duration specified in the
contract in advance of the first occurrence of the activity or provided the document in a period of time specified by the contract. The activity may not proceed without the M/s.
SANVIRA and/or their respective representative approval
Monitor Point (M): A critical step in fabrication and testing where it is optional that the M/s. SANVIRA and/or their respective representative inspect the
COMPANY CONTRACTOR PROJECT
INSPECTION AND TEST PLAN FOR FABRICATION AND BLASTING & PAINTING OF WATER JACKET ASSEMBLY (UPPER AND LOWER)
Intervention
S/N Description / Activity Controlling Procedure Specification Acceptance Frequency Verification Report (M,H,W,R,S,RW,A)* Comments /
Criteria Reference of Test Personnel Reference No. Remarks
UNISCO SANVIRA
component/equipment or witness an activity. The M/s. SANVIRA and/or their respective representative shall be notified at a duration specified in the contract in advance of
the first occurrence of the activity at each worksite. No further notification for like activities at each worksite shall be required. The activity may proceed with or without the M/s.
SANVIRA and/or their respective representative attendance.
Surveillance (S): Ongoing monitoring and verification of the status of conditions, methods, procedures, and products, and analysis of associated records to ensure that the
established requirements are being complied with project requirements.
General Notes :
Signature:
Print Name: Anand
Date: 06-07-2020