Risk Assessment Page 1 of 2

Light Fixture Installations


Department Document Ref. No. Issue Date Revision
QHSE HSE DOCS-RA-LFI-00 00-00-0000 00

Company Name: ABC Prepared by:

Functional Area/SOW: Light Fixture Installations Approved by:

Initial Risk Initial Risk


Hazards & Risks, Response, Precautions and Control
S/N Who Might be at Action by
associated with the L C RR Measures: L C RR
Activity
Risk?
 FM/Supervisor to conduct STAR T
briefing prior to start the work.
 Instructions given to you by the
Supervisor
 Use correct tools for the right job
and ensure that they are in good
condition. Safety helmet, safety Project Manager/ Engineer
Hand, foot and eye
1 2 1 2 shoes and safety gloves other Electrical Technicians. 1 1 2 Project Supervisor
injuries
required PPE must be worn at all QHSE Officer
times. Follow the instructions given
to you by the supervisor.
 Crews has appropriate PPE
 Operatives must not stand in the
material hopper to release wagon
tailgates
Project Manager/ Engineer
Be aware of operations going on above and
2 Noise 2 2 4 Operators/Technicians 1 2 2 Project Supervisor
around you.
QHSE Officer
Grounding and automatic differential switch Project Manager/ Engineer
Fool injury, Trips and
3 2 3 6 to be provided Check before use Weekly/ Operators/Technicians 1 2 2 Project Supervisor
falls
monthly Checks QHSE Officer
Project Manager/ Engineer
4 Failing Material 2 4 8 Wear goggles when suing compressed air Operators/Technicians 1 2 2 Project Supervisor
QHSE Officer
5 Electrical Shock 5 5 25 All guards, fences should be in place and Operators/Technicians 2 1 2 Project Manager/ Engineer

Page 1 of 2 QHSE-RA- Light Fixture Installations


Risk Assessment Page 2 of 2
Light Fixture Installations
Department Document Ref. No. Issue Date Revision
QHSE HSE DOCS-RA-LFI-00 00-00-0000 00

riving knives and blades should be correctly Project Supervisor


set for material being cut QHSE Officer
Project Manager/ Engineer
6 Particles in Eye 4 4 16 Dust masks must be work when cutting Operators/Technicians 1 2 2 Project Supervisor
QHSE Officer
Project Manager/ Engineer
Operative to be instructed as to the SHH
7 Contact with blade 2 3 6 Operators/Technicians 1 2 2 Project Supervisor
requirements regarding concrete
QHSE Officer
Project Manager/ Engineer
Design work routes to avoid underground
8 Dust 3 2 6 Operators/Technicians 2 1 2 Project Supervisor
utilities
QHSE Officer
Project Manager/ Engineer
Plan of work routes to be issued to all
9 Contact to cement 2 5 10 Operators/Technicians 1 2 2 Project Supervisor
personnel involved in formulation of permits
QHSE Officer
Any underground utilities identified in the
work route & appropriately protected, all
cabling, wiring and connections to be carried Project Manager/ Engineer
Damage to underground
10 2 5 10 out by qualified electrician, ensure all Operators/Technicians 2 1 2 Project Supervisor
cables, electrocution
appliances are wired correctly and tested, all QHSE Officer
equipment to be testing and tagged as
recommended

Name Date: Signature


Project Manager:

Project Engineer:

QHSE Officer:

Page 2 of 2 QHSE-RA- Light Fixture Installations