Hazards & Risks, Response, Precautions and Control S/N Who Might be at Action by associated with the L C RR Measures: L C RR Activity Risk? FM/Supervisor to conduct STAR T briefing prior to start the work. Instructions given to you by the Supervisor Use correct tools for the right job and ensure that they are in good condition. Safety helmet, safety Project Manager/ Engineer Hand, foot and eye 1 2 1 2 shoes and safety gloves other Electrical Technicians. 1 1 2 Project Supervisor injuries required PPE must be worn at all QHSE Officer times. Follow the instructions given to you by the supervisor. Crews has appropriate PPE Operatives must not stand in the material hopper to release wagon tailgates Project Manager/ Engineer Be aware of operations going on above and 2 Noise 2 2 4 Operators/Technicians 1 2 2 Project Supervisor around you. QHSE Officer Grounding and automatic differential switch Project Manager/ Engineer Fool injury, Trips and 3 2 3 6 to be provided Check before use Weekly/ Operators/Technicians 1 2 2 Project Supervisor falls monthly Checks QHSE Officer Project Manager/ Engineer 4 Failing Material 2 4 8 Wear goggles when suing compressed air Operators/Technicians 1 2 2 Project Supervisor QHSE Officer 5 Electrical Shock 5 5 25 All guards, fences should be in place and Operators/Technicians 2 1 2 Project Manager/ Engineer
Page 1 of 2 QHSE-RA- Light Fixture Installations
Risk Assessment Page 2 of 2 Light Fixture Installations Department Document Ref. No. Issue Date Revision QHSE HSE DOCS-RA-LFI-00 00-00-0000 00
riving knives and blades should be correctly Project Supervisor
set for material being cut QHSE Officer Project Manager/ Engineer 6 Particles in Eye 4 4 16 Dust masks must be work when cutting Operators/Technicians 1 2 2 Project Supervisor QHSE Officer Project Manager/ Engineer Operative to be instructed as to the SHH 7 Contact with blade 2 3 6 Operators/Technicians 1 2 2 Project Supervisor requirements regarding concrete QHSE Officer Project Manager/ Engineer Design work routes to avoid underground 8 Dust 3 2 6 Operators/Technicians 2 1 2 Project Supervisor utilities QHSE Officer Project Manager/ Engineer Plan of work routes to be issued to all 9 Contact to cement 2 5 10 Operators/Technicians 1 2 2 Project Supervisor personnel involved in formulation of permits QHSE Officer Any underground utilities identified in the work route & appropriately protected, all cabling, wiring and connections to be carried Project Manager/ Engineer Damage to underground 10 2 5 10 out by qualified electrician, ensure all Operators/Technicians 2 1 2 Project Supervisor cables, electrocution appliances are wired correctly and tested, all QHSE Officer equipment to be testing and tagged as recommended