For column- B-2

Load Case Combination of Beam


Analysis for P (kip) M2-2 (kip-ft) M3-3 (kip-ft) V2-2 (kip)
DL -264.436 -0.6942 0 6.04E-15
LL -73.108 0.0502 5.91E-15 -5.38E-16
WLx 39.468 102.344 -1.63E-14 1.48E-15
WLy 41.725 -3.0134 -243.5534 22.141

Factored Load Combination Pu (kip) M2-2 (kip-ft) M3-3 (kip-ft) V2-2 (kip)
1.2DL+1.6LL -434.296 -0.7528 -7.02E-14 6.39E-15
1.2DL+LL+1.6 WLx -351.333 163.6639 -9.99E-14 9.08E-15
1.2DL+LL-1.6 WLx -453.58 -165.2296 -7.23E-14 6.57E-14
1.2DL+LL+1.6 WLy -347.722 -5.6043 -389.6855 35.426
1.2DL+LL-1.6 WLy -457.192 4.0385 389.6855 -35.426
O.9DL+1.6 WLx -198.894 163.822 -8.59E-14 7.81E-15
O.9DL-1.6 WLx -301.141 -165.0715 -5.83E-14 5.30E-15
0.9 DL+1.6 WLy -195.283 -5.4462 -389.6855 35.426
O.9DL-1.6 WLy -304.753 4.1933 389.6855 -35.426