1. INTRODUCTION
This report covers the design, planning and estimation of civil building which was our project for
the final year project of diploma in civil engineering. Before the preparation of planning and design
we worked together in groups and studied our given site. We researched and gathered information
relevant to our project as the part of literature view. We also studied numerous college buildings in
nearby locality and collect information’s from construction sight on our collage. Hence the
comparison of the standard requirements of a building with KMBR gave as further knowledge about
hoe we should consider various factors to design of educational (collage) building.
The project team’s goal was to design an architectural plan and structural system that is cost effective,
safe, and accommodating to the proposed use. The project team established an architectural layout
and floor plan based on the educational building. The floor plan and building layout were designed to
accordance with Kerala Municipal Building Rule and National Building Code.
The team then designed a structural framing system by using STAADproV8i software and All principle
structural members were designed, including beams, columns, and foundation elements manually also.
The project has been prepared in partial fulfilment of the course of student in final year civil engineering
during the year 2022-2023.
All structural elements are designed to sustain structural safety. The design method aims at
guaranteeing adequate safety for all structural elements as importance as its strength. The design of
reinforced structure is mainly by STTADproV8i software and also based on the limit state method. Plinth
area of building is taken as plan; elevation and section is given in the figure attached.
The object of project work is to get a practical knowledge in design, drawing, and in preparation of
detailed estimate.
1.3 SURVEYING
For preparing site plan we conducted chain survey and the plan was prepared on the results ob-
tained from chain survey. After that plot a rough sketch and then the area of the site was calculated.
1.4 Terms
Building line
A line which is away from the street boundary and up to which the main wall of the building facing
that street may lawfully extend, no portion of the building may extend beyond as prescribed in
these rules
Carpet aria
The usable floor area excluding the area of staircase, lift wells, escalators, ducts, toilets, air
condition plant room and electrical control room.
Floor area
The built up area of a building at any floor level .
Floor area ratio
The quotient obtained by dividing the total floor area on all floors by the area of the plot.
Frontage
The side or part of a side of a plot which abuts on a street .
Ground floor
The lowest storey of a building to which there is an entrance from the adjacent ground or street .
Height of room
The vertical distance between the floor and the lowest point of the ceiling.
Plinth
A portion of a structure between the surface of the surrounding ground and surface of the floor, first
above the ground.
Plinth area
Area of the building at the plinth level, does not include the area of porch ( not enclosed by wall )
uncovered staircase and the like.
Rear yard
The utility open space extending laterally along the rear side of the plot and forming part of the
plot any side other than rear if used as utility open space shall be deemed as rear yard.
Side yard
An open space extending laterally between any side of a building and the boundary of the
plot facing that side other than front and rear or utility yard and forming part of the plot.
Storey
A portion of a building included between the surface of the floor next above it, or if there be no
floor above it then the space between any floor and the ceiling next above it.
Number of storey = 2
Class room (3) = 12×7.5
Geotechnical
engineering LAB = 12×7.5
Environmental
Engineering LAB = 12×7.5
Computer LAB = 10×7.5
Department
Library = 10×7.5
Staff room = 7.8×7.5
Drawing hall = 24.20×7.5
Transportation
Engineering LAB = 14×7.5
Material
Occupancies
Chapter iv
Page no 43
Group B educational building
Yards
(educational building area > 500 m2
Front -7.5 m
Rear - 3 m
Side – 3 m
Coverage and F S I
min
type of building section max F S I
coverage
up to H
35 25
S
educational
others 50 25
Height of room
Chapter v page no : 64
Minimum height = 3m
Staircase
Page – 68
Clause – 35
Minimum width - 120 cm
Minimum tread - 30 cm
Maximum rise - 15 cm
Minimum height of handrail – 90 cm
Minimum headroom passage under landing – 90 cm
occupant load
Table 17
Varandha
Page 72
Clause – 39
Width should be not less than 1m
Ventilation clause – 41
Area calculation
Ground floor
Total area = 1139.75m 2
First floor
Total area = 1138.56m 2
Total floor area of building = 1139.75+1138.56 =2278.31m 2
Coverage
Coverage = coverage area / plot area x 100
Plot area = 4230 m 2
Coverage area = 1315.5m2
Coverage = 1315.5 / 4230 x 100
= 31.09% `
In KMBR maximum permissible coverage is 35 %
31.09 ˂ 35 %
Hence its ok
min
type of building section max F S I
coverage
up to H
35 2.5
S
educational
others 50 2.5
2.1DESIGN OF BEAM
Fe = fy 415
M25 = fck 250
Span = 4m
Total depth D = 400mm
Assume: effective cover as 40 mm
D ` =40mm
d = 400-40
= 360mm
Load calculation
Weight of wall,w1 = unit weight x volume
= 20 x L x B x H
= 20 x 1 x 0.2 x 3.75
= 14.8kN/m
=14.8+2.5+7.5+3+1
= 28.8kN/m
Due to symmetry, W = 28.8x 2
= 57.6kN/m
Provide 12 mm Ø bars
No of bar = total area/area of one bar
= 280.69/113
=2.98
=3
τv = Vu/bd
= 184x103/250 x 360
= 2.04N/mm2
pt = 100 x Ast/bd
= 100 x 10x (π/4) x 122/250 x 360
= 1.25
Refer table 19: IS 456:2000
τc = 0. 7 N/mm2
Τv > τc (so shear reinforcement required)
Vus = Vu – τc bd
=184x103– 0.7 x 250 x 360
= 121kN
Detailing diagram
2.2DESIGN OF COLUMN
Design load an column = 786KN (as per the data obtained feom STAADpro)
Percentage of steel
Detailing diagram
Support Reaction
From staad data obtained,
Loads on supports on Y direction = 785.979 KN
Total axial load acting on column = 785.979 – 36.088/
= 749.891KN
Using M20 concrete
and fe415 steel
Assuming the pile is to driven to a hard stratum available at a depth of 8m .
1. Main Reinforcement
Length of the pile = 8 m
Let the size of the pile be 400 × 400 mm
l/D ratio = 8/.4 = 20
Since this is grater than 12, the pile behaves as long column ,
Hence Reduction coefficient er = 1.25 – lef/48D
= 1.25 - 8/(48×0.4)
= 0.8 taken as 0.8
That is ,
Design load of long column = 749.891 KN/0.8
=937.363 KN
Load carrying capacity of column is given by p =σccAc ₊ σscAsc
Where ,
Ac = Area of concrete
= (400 × 400) – Asc = 16 × 10 4 – Asc
There for ,
937.363× 103 = 5 × (16×104-Asc) ₊ 190 Asc
937363.75 = 5 × 16 × 104 – 5Asc ₊ 190 Asc
7.488 =3B×B
3B2 =7.488
B2 = 2.496
L = 3B =4.734
Length of tank =4.739
Breadth of tank =1.598
Depth of tank =2.5+taking free board 30cm
There fore total depth of tank =2.8m
3.ESTMATION
3.1 ESTMATION OF GROUND FLOOR
TOTAL= 9.9742 m3
TOTAL= 6.636 m3
(i) Bottom
(ii) Top
TOTAL= 16.89 m3
m3
TOTAL = 300.458
m3
TOTAL = 30.012
(c) Parapet wall 1 102.4 0.2 1.2 24.576 m3
m3
TOTAL = 24.576
NET
m3
TOTAL = 295.022
5. Plastering with 12mm thick in CM 1:5
m2
TOTAL= 3094.67
Deduction for opening
D3 1 1 2.4 2.4 m2
W1 32 1.5 1.5 72 m2
W2 1 1 1.5 1.5 m2
m2
TOTAL= 159.66
(c) Plastering for parapet wall
m2
TOTAL= 266.24
NET
m2
TOTAL = 3199.93
6. Flooring with 25 mm thick CC (1:2:4)
(k) Passage between rest room & wash 1 3.05 0.5 1.525 m2
(u). space between urinals and electrical room 1 4.20 3.10 13.02 m2
For step
(a) Thread
(b) Rise
1 53 0.15 10.6 m2
2 24 0.15 9.6 m2
Rectangular portion
TOTAL 1200.504 m2
(a)lintel
TOTAL 2.676 m3
column projecting upward base of water tank 8 0.4 0.4 13.9 17.792 m3
TOTAL 141.072 m3
TOTAL 61.6956 m3
TOTAL 328.718 m3
TOTAL= 209.7462 m3
Deduct opening
TOTAL= 29.016 m3
NET
205.3062 m3
TOTAL=
TOTAL= 2213.204 m3
W2 1 1 1.5 1.5 m2
TOTAL= 153.48 m2
TOTAL= 266.24 m2
NET
2325.964 m2
TOTAL=
(g) Passage between staff room & wash 1 2.05 7.5 15.375 m2
(h) Passage between wash & staff toilet 1 1.95 7.5 14.625 m2
TOTAL= 1083.68 m2
(a) Lintel
TOTAL= 2.796 m3
NO QUAN UN
DESCRIPTION S L B H TITY IT
1. EARTH WORK EXCAVATION
m3
a. SEPTIC TANK 1 5.4 2.2 3.3 39.2
m3
b. SOCK PIT UPPER PORTION 1 3.25 33.08
m3
c. SOCK PIT LOWER PORTION 1 0.2 0.62
TOTAL 72.9 m3
2.CEMENT CONCREATE 1:3:6 SEPTIC TANK
m3
a. FLOOR AND FOUNDATION 1 5.4 2.2 0.2 2.376
m3
b. SLOPPING FLOOR 1 4.8 1.6 0.05 0.384
TOTAL 2.76 m3
3.FIRST CLASS BRICK WORK IN1:4
a. SEPTIC TANK m3
1.LOWER PORTION m3
m3
LONG WALL 2 5.4 0.3 1 3.24
m3
SHORT WALL 2 1.6 0.3 1 0.96
2.UPPER PORTION
m3
LONG WALL 2 5.2 0.2 1.8 3.744
m3
SHORT WALL 2 1.4 0.2 1.8 1.008
TOTAL 9.919 m3
4.SECOND CLASS BRICK WORK IN SOCK PIT
3.14 m3
DRY BRICK 1 0.2 2.5 3.454
*2.2
TOTAL
3.454 m3
5.PRECAST RCC WORK
a. ROOF COVER SLAB OF SEPTIC TANK m3
1 5.2 2 0.25 2.6
c.BUFFLE WALL m3
1 1.7 0.04 0.75 0.051
TOTAL
7.172 m3
6. 12MM CEMENT PLASTERING 1: 3 WITH STANDARD WATER PROOFING INSIDE OF SEPTIC TANK
m2
a.LONG WALL 2 4.8 2.85 27.36
m2
b.SHORT WALL 2 1.6 2.85 9.12
TOTAL
36.48 m`2
7. 20MM CEMENT PLASTER1:3 MORTAR m2
1 4.8 1.6 7.68
FLOOR
7.SOCK PIT BRICK AGGRIGATES
a.BOTTOM m3
0.2 0.628
b.OUTSIDE 3.14x m3
0.15 2.5 3.002
2.55
TOTAL
3.63 m3
3.14x m3
COARSE SAND OUT SIDE OF SOCK PIT 0.15 2.5 3.355
2.85
3. First class brick work in (1:6) cement mortar 16.89 m3 1007 /CUM 17008.23
1200.50
6. Flooring with 25 mm thick CC (1:2:4) m2 654 /Sq.m 708726.72
4
1200.50
7. Ceiling m2 550 /Sq.m 660277.2
4
4400.43 142.4 626753.81
8. white washing m2 /Sq.m
4 3 5
4400.43 142.4 626753.81
9. painting m2 /Sq.m
4 3 5
368492.87
10.R.C.C. (1:2:4) 328.718 m3 1121 /CUM
8
42226148.
11. steel work 456647 m3 92.47 /Kg
1
46331839.
GRAND TOTAL AMOUNT FOR FIRST FLOOR
9
Description (SEPTIK TANK AND SOAKPIT) Quantity Unit Rate Per/%cum Cost
Coarse sand out side of sock pit 3.355 m3 1500 /CUM 5032.5
TOTAL 58387
Total amount = 59061481 ( fifty nine million sixty one thousand four hundred eghty-one)
4. CONCLUSION
In this project report it includes detailed survey, structural designing, estimation, etc.. and necessary
drawing are also attached.
This project helps us to understand more about structural designing and estimation. This
project is done by according to the rules in Kerala Municipal Building Rule and National Building
Code.
5. REFERENCES
3. IS 456:2000
4. SP 16
5. IS 875(part 1)-1987
6. IS 875 (part-2)-1987