Pr=8L=kL=kfOk

Pr=8L=kL=kfOksf] b/ /]6 ?=@%) k|lt s]=hL=sfod ul/Psf] .


kfOk ;fOh k|:tfljt lhNnf b/ /]6 074/75
s|=;+= OsfO{
dL=dL=OGr 2.5 kg/cm2 4 kg/cm2 6 kg/cm2 10 kg/cm2 s}lkmot
1 16 1/4" k|lt /=dL= 23.92
2 20 1/2" k|lt /=dL= 34.84
3 25 3/4" k|lt /=dL= 52.52
4 32 1" k|lt /=dL= 58.76 86.84
5 40 1.25" k|lt /=dL= 62.75 87.50 128.50
6 50 1.5" k|lt /=dL= 94.50 135.50 199.00
7 63 2" k|lt /=dL= 100.75 146.25 212.50 317.25
8 75 2.5" k|lt /=dL= 139.25 211.50 297.75 445.50
9 90 3" k|lt /=dL= 199.75 305.00 429.25 642.50
10 110 4" k|lt /=dL= 296.25 425.75 636.25 950.25
11 125 4.5" k|lt /=dL= 382.50 572.25 823.25 1240.50
12 140 5" k|lt /=dL= 474.25 725.25 1037.50 1552.25
13 160 6" k|lt /=dL= 613.25 943.25 1338.75 2019.75
3

District Rate Palpa F/Y 077/78


Add 13 %
Actual Rate
VAT
(VAT in
District Rate ( only in
S.N. Item Unit purchasing Remarks
without VAT purchasing
mat. from
mat. from
market )
market )
1 Skilled Labour Md 880.00 1.00 880.00
2 Unskilled Md 660.00 1.00 660.00
3 Sand m3 3400.00 1.00 3400.00
4 Aggregate (10mm) m3 3400.00 1.00 3400.00
5 Aggregate (20mm) m 3
3300.00 1.00 3300.00
6 Aggregate (40mm) m 3
1700.00 1.00 1700.00
7 Gravel (<70mm) m3 0.00 1.00 0.00
<20 crossor m 3
3000.00
20-40 crossor m 3
3000.00
8 Brick(Chimney Made) 1st Class Nos 15.75 1.00 15.75
9 Brick (Machine Made) Nos 15.75 1.00 15.75
10 Brick (Chimney Made) Rampur Area Nos 0.00 1.00 12.50
11 Block Stone m 3
2450.00 1.00 2450.00
12 Bond stone m3 2500.00 1.00 2500.00
Stone (where stone are available within
13 m3 2384.38 1.00 2384.38 From Analysis
reach of 5 Kms of work site)
14 Cement (43 grade) OPC Bag 752.00 1.13 849.76
15 Mud m 3
300.00 1.00 300.00
16 Normal Wood m 3
42000.00 1.00 42000.00
17 Sal Wood m3 168000.00 1.00 168000.00
18 Sisaw Wood m3 95000.00 1.00 95000.00
19 Torsteel
19.1 4-8 mm dia MT 76000.00 1.13 85880.00
19.2 10-25 mm dia MT 75000.00 1.13 84750.00
19.3 >25 mm dia MT 75000.00 1.13 84750.00
20 Binding Wire Kg 95.00 1.13 107.35
21 Holdfast Nos 88.00 1.00 88.00
22 Screw Nos 1.00 1.00 1.00
23 Screw/Nails kg 100.00 1.00 100.00
24 Nut Bolt/Salitpat kg 190.00 1.00 190.00
25 100mm Hinge Nos 25.00 1.00 25.00
26 75mm Hinge Nos 17.00 1.00 17.00
27 100mm Tower Bolt Nos 30.00 1.00 30.00
28 150mm Tower Bolt Nos 17.00 1.00 17.00
29 120mm long Locking set Nos 210.00 1.00 210.00
30 Brass Handle ( simple) Nos 150.00 1.00 150.00
31 4 mm Glass Sqm 735.00 1.13 830.55
4

District Rate Palpa F/Y 077/78


Add 13 %
Actual Rate
VAT
(VAT in
District Rate ( only in
S.N. Item Unit purchasing Remarks
without VAT purchasing
mat. from
mat. from
market )
market )
32 Mortise Lock Nos 660.00 1.00 660.00
33 24 Gauge GI Wire Mesh Sqm 225.00 1.13 254.25
34 3 mm Commercial ply wood Sqm 205.00 1.13 231.65
35 Wooden Listy(.5"-1 ") RM 20.00 1.00 20.00
36 Wooden Listy(1"-1 .5") RM 24.00 1.00 24.00
37 Mesh wire(10G) Medium coated Kg 96.00 1.13 108.48
38 Selvedge wir(7G) Medium coated Kg 96.00 1.13 108.48
39 Binding Wire (12 swg)medium coated Kg 96.00 1.13 108.48
40 White Cement Kg 35.00 1.13 39.55
41 Snowcem Paint Kg 55.00 1.13 62.15
42 White lime Kg 19.00 1.13 21.47
43 Enamel lit 500.00 1.13 565.00
44 Alluminium Paint lit 525.00 1.13 593.25
45 Glue kg 140.00 1.13 158.20
46.a Primer(Interior) Lit 310.00 1.13 350.30
46.b Primer(Exterior) Lit 415.00 1.13 468.95
47 Red Oxide Lit 300.00 1.13 339.00
48 Khaksi mtr 75.00 1.00 75.00
49 26 Gauge CGI Sheet (Medium coated) Bundle 8675.00 1.13 9802.75
50 28 Gauge CGI Sheet (Medium coated) Bundle 6874.00 1.13 7767.62
51 26 gauge GI Plane Sheet (MC) Rm 247.85 1.13 280.06 247.85
52 28 Gauge CGI Sheet (MC) coloured Bundle 8700.00 1.13 9831.00
53 26G plain sheet for Door Sqm 541.95 1.13 612.41 541.95
54 Nut Bolt kg 190.00 1.00 190.00
55 J Hook nos 8.00 1.00 8.00
56 Bitmun Washer Nos 1.00 1.00 1.00
57 Nails kg 100.00 1.13 113.00
58 MS Tubular Truss (Readymade) Kg 137.00 1.13 154.81
59 12 Gauge GI Barbed Wire Kg 100.00 1.13 113.00
60 U-hook Kg 150.00 1.00 150.00
61 Metal Grill Kg 126.00 1.13 142.38
62 Collapsible Metal Gate Kg 138.00 1.13 155.94
63 Metal Gate ( Compound Gate) Kg 136.00 1.13 153.68
64 Rolling Shutter Kg 138.00 1.13 155.94
65 Glazed ceramic wall tile Sqm 670.00 1.13 757.10
66 Glazed ceramicfloor tile Sqm 750.00 1.13 847.50
5

District Rate Palpa F/Y 077/78


Add 13 %
Actual Rate
VAT
(VAT in
District Rate ( only in
S.N. Item Unit purchasing Remarks
without VAT purchasing
mat. from
mat. from
market )
market )
67 Transportation
67.1 Earthen road from tractor(easy goods) qnt/km 3.40 1.00 3.40
67.2 Earthen road from tractor(difficult goods) qnt/km 4.10 1.00 4.10
68 Stone local royalty LS 50.00 1.00 50.00
69 3mm UPVC Sheet for roofing Sqm 1428.00 1.13 1613.64
70 3mm UPVC Sheet for ridge rm 1380.00 1.13 1559.40
71 J Hook Nos 8.00 1.13 9.04
72 Clip Nos 9.00 1.13 10.17
6

1209 24

5960.938

1
1

1
1
1
1
7

1
1

1
1

4.878049 1209 247.845

Nepal standard sada standard

604.5 495
901.46
2.439024

1 24

2.230815
541.9544
8
9
10
11
12
Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial

dol/1
1 Site Clearance 1 m2 Labour Unskilled 0.04 No. 660.00 26.40 26.40 26.40 26.40 m2 26.40

2 9.11/ 9.11/ Removal of landslide upto 50m lead

396.00
dor/ dor/

905 905
2.1 For Soft soil 1 m3 Labour Unskilled 0.60 No. 660.00 396.00 396.00 396.00 396.00 m3

2.2 For Hard soil 1 m3 Labour Unskilled 0.80 No. 660.00 528.00 528.00 528.00 528.00 m3 528.00
For Stone mixed
9.11

1056.00
dor/

2.3 1 m3 Labour Unskilled 1.60 No. 660.00 1056.00 1056.00 1056.00 1056.00 m3
soil/soft rock
dol/2

3 Cutting of trees including the removal of trunk, branches and stumps up to a lead of 100m
Above 90cm-
990.00
dol/

3.1 Each Labour Unskilled 1.50 No. 660.00 990.00 990.00 990.00 990.00
2.3

Each
180cm girth
Above 180cm-
1980.00
dol/

3.2 Each Labour Unskilled 3.00 No. 660.00 1980.00 1980.00 1980.00 1980.00 Each
2.4

270cm girth
dol/5

4 Earthwork excavation in Roadway & Drain

Labour Unskilled 0.50 No. 660.00 330.00 339.90


dol/5.a

a. Ordinary soil 1 m3 339.90 339.90 339.90 m3


Tools & Equipment 3% 9.90

Labour Unskilled 0.60 No. 660.00 396.00 407.88


dol/5.b

b. Hard soil 1 m3 407.88 407.88 407.88 m3


Tools & Equipment 3% 11.88

Labour Unskilled 2.00 No. 660.00 1320.00 1359.60


dol/5.c

c. Ordinary rock 1 m3 1359.60 1359.60 1359.60 m3


Tools & Equipment 3% 39.60

Labour Unskilled 4.00 No. 660.00 2640.00 2719.20


dol/5.d

d. Medium rock 1 m3 2719.20 2719.20 2719.20 m3


Tools & Equipment 3% 79.20

Hard rock Labour Unskilled 12.00 No. 660.00 7920.00 8157.60


dol/5.f

e. ( blasting 1 m3 8157.60 8157.60 8157.60 m3


prohibitted ) Tools & Equipment 3% 237.60
dol/9

5 Earthwork excavation for structures

Labour Unskilled 1.00 No. 660.00 660.00 679.80


dol/9.a

a. Ordinary soil 1 m3 679.80 679.80 679.80 m3


Tools & Equipment 3% 19.80

Prepared By: Checked By: Approved By:


Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial

Labour Unskilled 2.00 No. 660.00 1320.00 1359.60

dol/9.b
b. Hard soil 1 m3 1359.60 1359.60 1359.60 m3
Tools & Equipment 3% 39.60

Labour Unskilled 4.00 No. 660.00 2640.00 2719.20


dol/9.c

c. Ordinary rock 1 m3 2719.20 2719.20 2719.20 m3


Tools & Equipment 3% 79.20

Labour Unskilled 6.00 No. 660.00 3960.00 4078.80


dol/9.d

d. Medium rock 1 m3 4078.80 4078.80 4078.80 m3


Tools & Equipment 3% 118.80

Hard rock Labour Unskilled 16.00 No. 660.00 10560.00 10876.80


dol/9.e

e. ( blasting 1 m3 10876.80 10876.80 10876.80 m3


prohibitted ) Tools & Equipment 3% 316.80

165.00
dol/

6 Earth filling work 1 m3 Labour Unskilled 0.25 No. 660.00 165.00 165.00 165.00 165.00 m3
10

7
Stone Analysis for area where stone is available within reach of 5 Kms of work site ( Note:For Area where stone is not
available within reach of 5km additional analysis should be made)

Labour Unskilled 1.50 No. 660.00 990.00 3612.81


dob/6.5

Stone soling work


7.1 1 m3 3612.81 3612.81 3612.81 m3
in foundation
Material Stone 1.10 Cu.m. 2384.38 2622.81

Skilled 1.00 No. 880.00 880.00 8226.81


Labour 3190.00
dob/11.16

Stone pitching Unskilled 3.50 No. 660.00 2310.00


7.2 1 m3 8226.81 8226.81 m3
work Stone 1.10 Cu.m. 2384.38 2622.81
Material 5036.81
Sand 0.71 Cu.m. 3400.00 2414.00

Skilled 0.50 No. 880.00 440.00 4217.81


Dry Stone
Labour 1595.00
dol/38.a

(Uncoursed
7.3 1 m3 Unskilled 1.75 No. 660.00 1155.00 4217.81 4217.81 m3
rubble) masonary
work
Material Stone 1.10 Cu.m. 2384.38 2622.81 2622.81

Skilled 1.50 No. 880.00 1320.00 9377.77


Labour 3491.40
Unskilled 3.29 No. 660.00 2171.40
Stone (Uncoursed
dol/38.d

rubble) masonary
7.4 1 m3 Cement 1.84 Bag 849.76 1563.56 9377.77 9377.77 m3
work 1:6 cement
mortar Sand 0.50 Cu.m. 3400.00 1700.00
Material 5886.37

Stone 1.10 Cu.m. 2384.38 2622.81

Skilled 1.50 No. 880.00 1320.00 9650.66


Labour 3458.40
Stone Unskilled 3.24 No. 660.00 2138.40
( Uncoursed
dol/38.c

7.5 rubble) masonary 1 m3 Cement 2.32 Bag 849.76 1971.44 9650.66 9650.66 m3
work 1:4 cement
mortar Sand 0.47 Cu.m. 3400.00 1598.00
Material 6192.26

Stone 1.10 Cu.m. 2384.38 2622.81

Prepared By: Checked By: Approved By:


Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial

Skilled 1.00 No. 880.00 880.00 5113.81


Stone Labour 2365.00
dob/6.2.2.c ( Uncoursed Unskilled 2.25 No. 660.00 1485.00
7.6 rubble) masonary 1 m3 5113.81 5113.81 m3
work with mud Stone 1.10 Cu.m. 2384.38 2622.81
mortar Material 2748.81
Mud 0.42 Cu.m. 300.00 126.00

Skilled 1.00 No. 880.00 880.00 12445.06


Labour 3559.60
Unskilled 4.06 No. 660.00 2679.60

Cement 6.40 Bag 849.76 5438.46


P.C.C.(1:2:4) for
dol/41.b

8 foundation & 1 m3 Sand 0.44 Cu.m. 3400.00 1496.00 12445.06 12445.06 m3


floor
Material 40 mm aggregate 0.52 Cu.m. 1700.00 884.00 8885.46

20 mm aggregate 0.22 Cu.m. 3300.00 726.00

10 mm aggregate 0.11 Cu.m. 3100.00 341.00


Skilled 1.00 No. 880.00 880.00 15323.28
Labour 4259.20
Unskilled 5.12 No. 660.00 3379.20

Cement 8.00 Bag 849.76 6798.08


P.C.C.(1:1.5:3)
dol/41.B.b

for slab , beam, Sand 0.42 Cu.m. 3400.00 1428.00


9 1 m3 15323.28 15323.28 m3
column , lintel
etc. 40 mm aggregate 0.00 Cu.m. 1700.00 0.00
Material 11064.08

20 mm aggregate 0.57 Cu.m. 3300.00 1881.00

10 mm aggregate 0.29 Cu.m. 3300.00 957.00

Skilled 1.00 No. 880.00 880.00 13105.06


Labour 4219.60
Unskilled 5.06 No. 660.00 3339.60

Cement 6.40 Bag 849.76 5438.46


P.C.C.(1:2:4) for
dol/41.B.a

slab , beam,
10 1 m3 Sand 0.44 Cu.m. 3400.00 1496.00 13105.06 13105.06 m3
column , lintel
etc.
Material 40 mm aggregate 0.52 Cu.m. 1700.00 884.00 8885.46

20 mm aggregate 0.22 Cu.m. 3300.00 726.00

10 mm aggregate 0.11 Cu.m. 3100.00 341.00

Skilled 1.00 No. 880.00 880.00 10753.94


Labour 3520.00
Unskilled 4.00 No. 660.00 2640.00

Cement 4.40 Bag 849.76 3738.94


dol/41.A.a

P.C.C.(1:3:6) for
11 foundation & 1 m3 10753.94 10753.94 m3
Prepared By: floor Checked By: Approved By:
Material 7233.94
Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial

dol/41.A.a
P.C.C.(1:3:6) for
11 foundation & 1 m3 Sand 0.47 Cu.m. 3400.00 1598.00 10753.94 10753.94 m3
floor
Material 7233.94
40 mm aggregate 0.65 Cu.m. 1700.00 1105.00

20 mm aggregate 0.24 Cu.m. 3300.00 792.00

Gabion work ( Assuming Stone Analysis for area where stone is available within reach of 5 Kms of work site)

Skilled 0.25 No. 880.00 220.00 3390.27


Labour 715.00
dor activity no.24.02.04

providing & filling 1 m3 Unskilled 0.75 No. 660.00 495.00 3390.27 3390.27 m3
of stone/boulder in
Gabion
boxes/mattress etc. 1.00 Cu.m.
12.1 including dressing, Material Block Stone 2384.38 2384.38
bending, bonding 2622.81
and all 0.10 Cu.m.
transportation as Bond stone 2384.38 238.44
per specification
Add 2% of material cost exculiding
52.46
transportation cost for necessary testing

Fabrication of gabion boxes including rolling, cutting and weaving & packing.Hexagonal Mesh size-100mmx120mm, Mesh wire-10 SWG(0.0615kg/m), Selvedge wire-8SWG (0.1057kg/m), Binding
13
wire-12 SWG
dor activity Nos.(24.01.02 ,+24.02.04 )

Skilled 0.66 No. 880.00 576.40 5568.06


Labour 1846.90
Unskilled 1.93 No. 660.00 1270.50

1.5x1x1 m Box Mesh wire 19.75 Kg 108.48 2142.48


a. 1 m3 8352.09 5568.06 m3
Spec.clause no.2401

size
Selvedge wire 2.70 Kg 108.48 292.90
Material 6505.19
Binding wire 1.25 Kg 108.48 135.60

Stone 1.65 Cu.m. 2384.38 3934.22

Skilled 0.48 No. 880.00 422.40 6102.92


Labour 1339.80
dor activity Nos.24.01.02 ,

Unskilled 1.39 No. 660.00 917.40


Spec.clause no.2401

Mesh wire 16.45 Kg 108.48 1784.50


2x1x.5 m Box
b. 1 m3 6102.92 6102.92 m3
size Selvedge wire 2.43 Kg 108.48 263.61
Material 4763.12
Binding wire 0.85 Kg 108.48 92.21

Stone 1.10 Cu.m. 2384.38 2622.81

Skilled 0.84 No. 880.00 739.20 5325.37


Labour 2323.20
dor activity Nos.24.01.02 ,

Unskilled 2.40 No. 660.00 1584.00


Spec.clause no.2401

Mesh wire 24.15 Kg 108.48 2619.79


c. 2x1x1 m Box size 1 m3 10650.74 5325.37 m3
Selvedge wire 2.96 Kg 108.48 321.10
Material 8327.54

Prepared By: Checked By: Approved By:


Nos.24.01.02 ,
Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)

S.N.no.2401
Total

Norms
Rate Per
c. Description
2x1x1 m Box size Per
1 Unit
m3 Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total
10650.74 5325.37 Unit
m3

Spec.clause
Unit
erial

dor activity
Material 8327.54
Binding wire 1.30 Kg 108.48 141.02

Stone 2.20 Cu.m. 2384.38 5245.63

Skilled 1.25 No. 880.00 1100.00 5037.53


Labour 2816.00
dor activity Nos.24.01.02 ,

Unskilled 2.60 No. 660.00 1716.00


Spec.clause no.2401

Mesh wire 35.10 Kg 108.48 3807.65


d 3x1x1 m Box size 1 m3 15112.59 5037.53 m3
Selvedge wire 3.91 Kg 108.48 424.16
Material 12296.59
Binding wire 1.81 Kg 108.48 196.35

Stone 3.30 Cu.m. 2384.38 7868.44


District Rate 22.6.1

14 Machine made Gabbion Box of Hexagonal Mesh size-100mm*120mm, Mesh wire-3mm, Selvedge wire 3.9 mm, Binding wire 2.4mm(MBG/10*12/3.0/3.9/2.4/ZN)

a. Box size-1.5*1*1/0 1 no. #REF! No. #REF!


b. Box size -2*1*1/1 1 no. #REF! No. #REF!
c. Box size -2*1*1/2 2 no. #REF! No. #REF!
d. Box size -3*1*1/2 1 no. #REF! No. #REF!
Skilled 0.50 No. 880.00 440.00 1012.90
Labour 1100.00
dob/11.15.ka

One brick flat Unskilled 1.00 No. 660.00 660.00


15 10 m2 10129.00 1012.90 m2
soling Brick 420.00 No. 15.75 6615.00
Material 9029.00
Sand 0.71 Cu.m. 3400.00 2414.00

Skilled 1.50 No. 880.00 1320.00 15462.36


Labour 4633.20
Unskilled 5.02 No. 660.00 3313.20
dol/37.A.c

Brick work in 1:6 Cement 1.40 Bag 849.76 1189.66


16 cement sand 1 m3 15462.36 15462.36 m3
mortar
Material Sand 0.38 Cu.m. 3400.00 1292.00 10829.16

Brick 530.00 Nos. 15.75 8347.50

Skilled 1.50 No. 880.00 1320.00 15850.42


Labour 4613.40
Unskilled 4.99 No. 660.00 3293.40
dol/37.A.b

Brick work in1:4


Cement 2.00 Bag 849.76 1699.52
17 cement sand 1 m3 15850.42 15850.42 m3
mortar
Material Sand 0.35 Cu.m. 3400.00 1190.00 11237.02

Brick 530.00 Nos. 15.75 8347.50

Skilled 7.00 No. 880.00 6160.00 100.84


Labour 10780.00
Curtailment , Unskilled 7.00 No. 660.00 4620.00
dol/40

18 bent up, binding 1000 Kg 100841.00 100.84 Kg


of MS bars .

Prepared By: Checked By: Approved By:


Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
Curtailment , erial

dol/40
18 bent up, binding 1000 Kg 100841.00 100.84 Kg
of MS bars . Tor steel/MS bar 1.05 MT 84750.00 88987.50
Material 90061.00
Binding wires 10.00 Kg 107.35 1073.50

Skilled 1.50 No. 880.00 1320.00 741.05


Form work for Labour 2640.00
beams, slab in Unskilled 2.00 No. 660.00 1320.00
dol/39.A

structure.(Qty. Of
19.a wood 10 m2 7410.50 741.05 m2
=(0.75+.5)/12=.0833)A Wood(Normal) 0.104 Cu.m. 42000.00 4375.00
ssume wood can be
used 8 times. Material 4770.50
Nails 3.50 Kg 113.00 395.50

Skilled 0.75 No. 880.00 660.00 521.55


Form work for Labour 1320.00
wall or vertical
Unskilled 1.00 No. 660.00 660.00
dol/39.b

structure .(Qty. Of
19.b wood 10 m2 5215.50 521.55 m2
=(0.75+.25)/12=0.0833
)Assume wood can be Wood(Normal) 0.083 Cu.m. 42000.00 3500.00
used 8 times. Material 3895.50
Nails 3.50 Kg 113.00 395.50

Skilled 0.25 No. 880.00 220.00 273.48


Form work for Labour 550.00
Irrigation
dol/39.b

Unskilled 0.50 No. 660.00 330.00


19.c Canal(Qty. Of wood 10 m2 2734.75 273.48 m2
=(0.75+.25)/16=0.0833
)Assume wood can be Wood(Normal) 0.050 Cu.m. 42000.00 2100.00
used 8 times. Material 2184.75
Nails 0.75 Kg 113.00 84.75

Skilled 34.00 No. 880.00 29920.00 225244.0


Labour 32164.00
Unskilled 3.40 No. 660.00 2244.00
dob/10.1

Sal wood work


20 1 m3 Sal wood 1.10 Cu.m. 168000.00 184800.00 225244.00 225244.0 m3
for choukosh
Material Hold fast 92.00 Nos. 88.00 8096.00 193080.00

Screw 184.00 Nos. 1.00 184.00

Skilled 34.00 No. 880.00 29920.00 86644.00

Labour 32164.00
Unskilled 3.40 No. 660.00 2244.00

Normal wood
dob/10.1

21 work for 1 m3 86644.00 86644.00 m3


choukosh Normal wood 1.10 Cu.m. 42000.00 46200.00 86644.00

Material Hold fast 92.00 Nos. 88.00 8096.00 54480.00

Screw 184.00 Nos. 1.00 184.00

Skilled 10.00 No. 880.00 8800.00 11526.02


Labour 9460.00

Prepared By: Checked By: Approved By:

38mm th. Sal


Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
Labour 9460.00
Unskilled 1.00 No. 660.00 660.00

Sal wood 0.084 Cu.m. 168000.00 14112.00


38mm th. Sal
wood work for
100mm hinges 6.00 Nos. 25.00 150.00
solid panel
dob/10.2

22 shutter of 2.114 m2 24366.00 11526.02 m2


doors/windows 150mm tower bolt 2.00 Nos. 17.00 34.00
(Size:1.07m x Material 14906.00
1.982m =2.114m2)
250mm locking set 1.00 Nos. 210.00 210.00

Handles 2.00 Nos. 150.00 300.00

Screw 1.00 LS 100.00 100.00

Skilled 10.00 No. 880.00 8800.00 6533.59


Labour 9460.00
Unskilled 1.00 No. 660.00 660.00
38mm th. Normal Normal wood 0.084 Cu.m. 42000.00 3528.00
wood work for
solid panel
100mm hinges 6.00 Nos. 30.00 180.00
dob/10.2

shutter of
23 2.114 m2 13812.00 6533.59 m2
doors/windows
(Size:1.07m x 150mm tower bolt 2.00 Nos. 17.00 34.00
Material 4352.00
1.982m
=2.114m2 ) Locking set 1.00 Nos. 210.00 210.00
Handles 2.00 Nos. 150.00 300.00
Screw 1.00 LS 100.00 100.00

Skilled 7.00 No. 880.00 6160.00 7127.62


Labour 6622.00
Unskilled 0.70 No. 660.00 462.00
Sal wood 0.035 Cu.m. 168000.00 5812.80
Flush shutter
38mm th. sal 26G GI plain sheet 4.65 sqm. 612.41 2847.70
wood frame with
dob/10.9

GI plain sheet on 100mm hinges 3.00 Nos. 25.00 75.00


24 2.245 m2 16001.50 7127.62 m2
both side.
(Size:1.092m x Material 9379.50
150mm tower bolt 2.00 Nos. 17.00 34.00
2.058m
=2.245m2 )
Locking set 1.00 Nos. 210.00 210.00

Handles 2.00 Nos. 150.00 300.00

Screw nails 1.00 LS 100.00 100.00

Skilled 7.00 No. 880.00 6160.00 6769.53


Labour 6622.00
Unskilled 0.70 No. 660.00 462.00

Sal wood 0.035 Cu.m. 168000.00 5812.80


Flush shutter
38mm th. sal 26G GI plain sheet 2.33 sqm. 612.41 1423.85
wood frame with
dob/10.9

GI plain sheet on 100mm hinges 3.00 Nos. 231.65 694.95


25 2.245 m2 15197.60 6769.53 m2
one side.
(Size:1.092m x
2.058m Material 150mm tower bolt 2.00 Nos. 17.00 34.00 8575.60
=2.245m2 )
Prepared By: Checked By: Approved By:
Flush shutter
38mm th. sal
wood frame with
Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)

dob/10.9
GI plain sheet on
25 2.245 m2 Total 15197.60 6769.53 m2

Norms
one side. Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
(Size:1.092m x Unit
Material erial
8575.60
2.058m
=2.245m2 )
Locking set 1.00 Nos. 210.00 210.00

Handles 2.00 Nos. 150.00 300.00

Screw nails 1.00 LS 100.00 100.00

Skilled 9.00 No. 880.00 7920.00 8207.69


Labour 8514.00
Unskilled 0.90 No. 660.00 594.00

Sal wood (38x75 Sal wood 0.049 Cu.m. 168000.00 8232.00


mm)work for
dob/10.4

Glazed 4mm th glass 1.085 sqm. 830.55 901.15


26 2.230 m2 18303.15 8207.69 m2
Shutter(4mm th
glass) 75mm hinges 8.00 Nos. 17.00 136.00
Material 9789.15
(size1.829x1.22)
100mmCheskeni 4.00 Nos. 30.00 120.00
Handles 2.00 Nos. 150.00 300.00
Screw nails 1.00 LS 100.00 100.00
Skilled 7.00 No. 880.00 6160.00 4552.83
Labour 6622.00
Unskilled 0.70 No. 660.00 462.00

Normal wood 0.035 Cu.m. 42000.00 1453.20


Flush shutter
38mm th. Normal
26G GI plain sheet 2.33 sqm. 612.41 1426.91
wood frame with
dob/10.9

GI plain sheet on
27 2.245 m 2
100mm hinges 3.00 Nos. 25.00 75.00 10221.11 4552.83 m2
both side.
(Size:1.092m x Material 3599.11
2.058m 150mm tower bolt 2.00 Nos. 17.00 34.00
=2.245m2 )
Locking set 1.00 Nos. 210.00 210.00

Handles 2.00 Nos. 150.00 300.00


Screw nails 1.00 LS 100.00 100.00

Skilled 7.00 No. 880.00 6160.00 5185.70


Labour 6622.00
Unskilled 0.70 No. 660.00 462.00

Flush shutter Normal wood 0.035 Cu.m. 42000.00 1453.20


38mm th. Normal
wood frame with 26G GI plain sheet 4.65 sqm. 612.41 2847.70
dob/10.9

GI plain sheet on
28 2.245 m2 11641.90 5185.70 m2
both side. 100mm hinges 3.00 Nos. 25.00 75.00
(Size:1.092m x
2.058m Material 5019.90
150mm tower bolt 2.00 Nos. 17.00 34.00
=2.245m2 )
Locking set 1.00 Nos. 210.00 210.00
Handles 2.00 Nos. 150.00 300.00

Screw nails 1.00 LS 100.00 100.00

Skilled 17.65 No. 880.00 15532.00 209382.0


Labour 32692.00
Unskilled 26.00 No. 660.00 17160.00
dob/10.18

Sal wood work


29 1 m3 209382.00 209382.0 m3
for truss
Prepared By: Checked By: Approved By:
Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial

dob/10.18
Sal wood work
29 1 m3 Sal wood 1.05 Cu.m. 168000.00 176400.00 209382.00 209382.0 m3
for truss

Material Salipat/Nutbolt 1.00 LS 190.00 190.00 176690.00

Nails 1.00 LS 100.00 100.00

Skilled 17.65 No. 880.00 15532.00 77082.00


Labour 32692.00
Unskilled 26.00 No. 660.00 17160.00
dob/10.18

Normal wood
30 1 m3 Normal wood 1.05 Cu.m. 42000.00 44100.00 77082.00 77082.00 m3
work for roofing

Material Salipat/Nutbolt 1.00 LS 190.00 190.00 44390.00

Nails 1.00 LS 100.00 100.00

Skilled 17.65 No. 880.00 15532.00 60893.60


Labour 16693.60
dob/10.17

Normal wood Unskilled 1.76 No. 660.00 1161.60


31 work for beam & 1 m3 60893.60 60893.60 m3
Lintel. Normal wood 1.05 Cu.m. 42000.00 44100.00
Material 44200.00
Screw Nails 1.00 LS 100.00 100.00

Skilled 17.65 No. 880.00 15532.00 193193.6


Labour 16693.60
Unskilled 1.76 No. 660.00 1161.60
dob/10.17

Sal wood work


32 for beam & 1 m3 193193.60 193193.60 m3
Lintel. Sal wood 1.05 Cu.m. 168000.00 176400.00
Material 176500.00
Screw Nails 1.00 LS 100.00 100.00

25mm th. Normal Skilled 6.50 No. 880.00 5720.00 2393.10


wood work for Labour 6149.00
Unskilled 0.65 No. 660.00 429.00
dob/11.21

wooden flooring
33 over 50mm x 10 m2 23931.00 2393.10 m2
75mm salwood Normal wood 0.421 Cu.m. 42000.00 17682.00
frame @600mm Material 17782.00
c/c Screw Nails 1.00 LS 100.00 100.00

25mm th. Sal Skilled 6.50 No. 880.00 5720.00 7697.70


wood work for Labour 6149.00
wooden Unskilled 0.65 No. 660.00 429.00
dob/11.21

flooringflooring
34 10 m2 76977.00 7697.70 m2
over 50mm x
75mm salwood Sal wood 0.421 Cu.m. 168000.00 70728.00
frame @600mm Material 70828.00
c/c Screw Nails 1.00 LS 100.00 100.00

Skilled 1.43 No. 880.00 1258.40 4765.28


Labour 1352.78
Unskilled 0.14 No. 660.00 94.38
dob/10.19

Sal wood (25mm


35 th. plank) work 10 m2 47652.78 4765.28 m2
for eaves board 25mm th. sal wood plank 0.28 Cu.m. 168000.00 46200.00
Material 46300.00

Prepared By: Checked By: Approved By:


Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)

dob/10.19
Sal wood (25mm
Total

Norms
35 th. plank) work 10 m2 47652.78 4765.28
Rate Per m2

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
for eaves board Unit
erial
Material 46300.00
Screw nails 1.00 LS 100.00 100.00

Skilled 1.43 No. 880.00 1258.40 1300.28


Labour 1352.78
Normal wood Unskilled 0.14 No. 660.00 94.38
dob/10.19

(25mm th. plank)


36 10 m 2
13002.78 1300.28 m2
work for eaves 25mm th. normal wood
board 0.28 Cu.m. 42000.00 11550.00
plank
Material 11650.00

Screw nails 1.00 LS 100.00 100.00

Prepared By: Checked By: Approved By:


Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial

Skilled 23.00 No. 880.00 20240.00 2975.47


Labour 21758.00
600mm x 900mm
Unskilled 2.30 No. 660.00 1518.00
Sal wood frame of
50mm x 75mm
dob/10.16.ka

for false ceiling Sal wood 0.45 Cu.m. 168000.00 75600.00


37 with 3mm 35.68 m2 106164.88 2975.47 m2
commercial 3mm th. Plywood 37.50 sqm. 231.65 8686.88
plywood (Size Material 84406.88
9.75 x
Listy 1.00 LS 20.00 20.00
3.65=35.68sqm )

Screw nails 1.00 LS 100.00 100.00

Skilled 23.00 No. 880.00 20240.00 1386.35


Labour 21758.00
600mm x900mm
Unskilled 2.30 No. 660.00 1518.00
Normal wood
frame of 50mm x
dob/10.16.ka

75mm for false Normal wood 0.45 Cu.m. 42000.00 18900.00


38 ceiling with 3mm 35.68 m2 49464.88 1386.35 m2
commercial 3mm th. Plywood 37.50 sqm. 231.65 8686.88
plywood (Size Material 27706.88
9.75 x
Listy 1.00 LS 20.00 20.00
3.65=35.68sqm )

Screw nails 1.00 LS 100.00 100.00

Skilled 1.10 No. 880.00 968.00 938.54


26 guage Labour 1793.00
Unskilled 1.25 No. 660.00 825.00
(Medium
coated )CGI sheet CGI sheet 0.672 Bundle 9802.75 6587.45
dob/9.1

39 for roof covering. 10.00 m2 9385.45 938.54 m2


(1bundle=17.87m2 Nut bolt 30.00 Nos. 25.00 750.00
) For Material 7592.45
10m2,12/17.87=0.67 J-hook 25.00 Nos. 8.00 200.00
2bundle)
Bitumen washer 55.00 Nos. 1.00 55.00

Skilled 1.10 No. 880.00 968.00 801.78


Labour 1793.00
28 guage Unskilled 1.25 No. 660.00 825.00
(Medium coated
CGI sheet for CGI sheet 0.672 Bundle 7767.62 5219.84
dob/9.1

40 roof covering. 10.00 m2 8017.84 801.78 m2


(1bundle=17.87m2 Nut bolt 30.00 Nos. 25.00 750.00
) For Material 6224.84
10m2,12/17.87=0.67 J-hook 25.00 Nos. 8.00 200.00
2bundle)
Bitumen washer 55.00 Nos. 1.00 55.00

Prepared By: Checked By: Approved By:


Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial

Skilled 2.00 No. 880.00 1760.00 712.58


Labour 3740.00
26 guage GI plain Unskilled 3.00 No. 660.00 1980.00
dob/9.2
41 sheet for ridge 10.00 Rm 7125.78 712.58 Rm
covering. GI plain sheet 12.00 Rm 280.06 3360.78
Material 3385.78
Nut bolt/J-hook 1.00 LS 25.00 25.00

Skilled 1.10 No. 880.00 968.00 1435.44


Labour 1793.00
28 guage medium Unskilled 1.25 No. 660.00 825.00
coated CGI sheet
for roof covering. CGI sheet 0.672 Bundle 9831.00 6606.43
dob/9.1

42 (1bundle=17.87m2 10.00 m2 14354.43 1435.44 m2


) For Nut bolt 30.00 Nos. 190.00 5700.00
10m2,12/17.87=0.67 Material 12561.43
2bundle) J-hook 25.00 Nos. 8.00 200.00

Bitumen washer 55.00 Nos. 1.00 55.00

Skilled 2.00 No. 880.00 1760.00 712.58


Labour 3740.00
26 guage GI plain Unskilled 3.00 No. 660.00 1980.00
dob/9.2

sheet(Coloured)
43 10.00 Rm 7125.78 712.58 Rm
for ridge
GI plain sheet 12.00 Rm 280.06 3360.78
covering.
Material 3385.78
Nut bolt/J-hook 1.00 LS 25.00 25.00

Skilled 12.00 No. 880.00 10560.00 360.94


Labour 21120.00
dob/12.1.kha.

12.5mm 1:3 Unskilled 16.00 No. 660.00 10560.00


cement sand
44 100 m2 36094.00 360.94 m2
plaster work in
ceiling Cement 12.50 Bag 849.76 10622.00
Material 14974.00
Sand 1.28 Cu.m. 3400.00 4352.00

Skilled 12.00 No. 880.00 10560.00 293.43


Labour 18209.40
dol/37.B.c.

12.5mm 1:4 Unskilled 11.59 No. 660.00 7649.40


45 plaster work 100 m2 29342.66 293.43 m2
except in ceiling Cement 7.26 Bag 849.76 6169.26
Material 11133.26
Sand 1.46 Cu.m. 3400.00 4964.00

Skilled 12.00 No. 880.00 10560.00 285.49


Labour 18282.00
dol/37.B.d.

12.5mm 1:6 Unskilled 11.70 No. 660.00 7722.00


46 plaster work 100 m2 28548.62 285.49 m2
except in ceiling Cement 5.76 Bag 849.76 4894.62
Material 10266.62
Sand 1.58 Cu.m. 3400.00 5372.00

Skilled 14.00 No. 880.00 12320.00 461.06


Labour 24860.00
dob/12.4.kha.

20mm 1:4 plaster Unskilled 19.00 No. 660.00 12540.00


47 work except in 100 m2 46106.11 461.06 m2
ceiling Cement 16.20 Bag 849.76 13766.11
Material 21246.11
Sand 2.20 Cu.m. 3400.00 7480.00

Prepared By: Checked By: Approved By:


Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial

Skilled 10.00 No. 880.00 8800.00 269.12


Flush rulled Labour 18040.00
dob/14.2.kha. pointing works on Unskilled 14.00 No. 660.00 9240.00
48 random rubble 100 m2 26912.04 269.12 m2
masonary work Cement 8.16 Bag 849.76 6934.04
(1:2) Material 8872.04
Sand 0.57 Cu.m. 3400.00 1938.00

Skilled 8.00 No. 880.00 7040.00 158.45


Flush pointing Labour 12887.60
dol/37.C.b.

works on brick Unskilled 8.86 No. 660.00 5847.60


49 100 m2 15845.01 158.45 m2
masonary
work(1:2) Cement 2.44 Bag 849.76 2073.41
Material 2957.41
Sand 0.26 Cu.m. 3400.00 884.00

Skilled 16.00 No. 880.00 14080.00 316.90


Labour 25775.20
Rulled pointing
dol/37.E.b.

works on brick Unskilled 17.72 No. 660.00 11695.20


50 100 m2 31690.03 316.90 m2
masonary
work(1:2) Cement 4.88 Bag 849.76 4146.83
Material 5914.83
Sand 0.52 Cu.m. 3400.00 1768.00

Skilled 1.00 No. 880.00 880.00 244.41


Labour 1540.00
dor/11.20

3mm th. cement Unskilled 1.00 No. 660.00 660.00


51 10 m2 2444.14 244.41 m2
punning
Material Cement 1.064 Bag 849.76 904.14 904.14

Skilled 1.50 No. 880.00 1320.00 35.71


Labour 2046.00
dob/13.1.kha

Two coat white Unskilled 1.10 No. 660.00 726.00


52 wash with lime on 100 m2 3571.32 35.71 m2
new surface White lime 64.56 Kg 21.47 1386.10
Material 1525.32
Gum 0.88 Kg 158.20 139.22

Prepared By: Checked By: Approved By:


Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial

Skilled 5.00 No. 880.00 4400.00 96.18


dob/13.4.kha Two coat white Labour 7700.00
53 cement paint on 100 m2 Unskilled 5.00 No. 660.00 3300.00 9618.18 96.18 m2
new surface
White cement 48.50 Kg 39.55 1918.18 1918.18

Two coat water Skilled 5.00 No. 880.00 4400.00 107.14


dob/13.4.kha

proof cement Labour 7700.00


54 painting 100 m2 Unskilled 5.00 No. 660.00 3300.00 10714.28 107.14 m2
(snowcem) work
on new surface Snowcem 48.50 Kg 62.15 3014.28 3014.28

Skilled 12.00 No. 880.00 10560.00 277.17


dob/13.5.ka+kha+ga

Labour 15840.00
Unskilled 8.00 No. 660.00 5280.00
Two coat enamel
55 a 100 m2 27717.43 277.17 m2
painting work
Primer 8.10 lt. 350.30 2837.43
Material 11877.43
Enamel 16.00 lt. 565.00 9040.00

Skilled 12.00 No. 880.00 10560.00 298.72


dob/13.5.ka+kha+ga

Labour 15840.00
Two coat Apex Unskilled 8.00 No. 660.00 5280.00
painting (Exterior
55 b 100 m2 29871.78 298.72 m2
weather paint)
with Prime Coat Primer 8.10 lt. 468.95 3798.50
Material 14031.78
Enamel 16.00 lt. 639.58 10233.28

Skilled 10.75 No. 880.00 9460.00 260.76


Labour 16555.00
Unskilled 10.75 No. 660.00 7095.00
Two coat
dob/13.6

56 alluminium 100 m 2
Primer 8.10 lt. 350.30 2837.43 26075.80 260.76 m2
painting work
Material Alluminium paint 10.76 lt. 593.25 6383.37 9520.80

Khaksi 4.00 No. 75.00 300.00

Skilled 1.076 No. 880.00 946.88 61.39


Labour 4497.68
GI barbed wire Unskilled 5.38 No. 660.00 3550.80
dob/24.6

for fencing work


57 100 Rm 6139.28 61.39 Rm
(Assume1m=0.12 Barbed wire 110.00 Rm 13.56 1491.60
kg)
Material 1641.60
U-hook 1.00 LS 150.00 150.00

58 Dismantalling of various works & came out material lead upto 30m
Dismantalling of
dob/
19.1

a. masonary work 1 m3 Labour Unskilled 1.06 No. 660.00 699.60 699.60 699.60 699.60 m3 699.60
with mud mortar
Dismantalling of
dob/19.2

masonary work
b.
with cement
1 m3 Labour Unskilled 2.12 No. 660.00 1399.20 1399.20 1399.20 1399.20 m3 1399.20
mortar

Prepared By: Checked By: Approved By:


Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total

Norms
Rate Per

S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
Dismantalling of

dob/
19.3
c. R.C.C. or R.B.C. 1 m3 Labour Unskilled 11.00 No. 660.00 7260.00 7260.00 7260.00 7260.00 m3 7260.00
work
Dismantalling of
19.4
dob/
d.
P.C.C. work
1 m3 Labour Unskilled 4.00 No. 660.00 2640.00 2640.00 2640.00 2640.00 m3 2640.00
Skilled 0.06 No. 880.00 52.80 1034.51
Labour 56.76
Unskilled 0.01 No. 660.00 3.96
dob/10.11.kha

Fixed glazed
59 pannels (4mm 1 m2 4mm th. Glass 1.000 sqm. 830.55 830.55 1034.51 1034.51 m2
thick glass)
Material wooden listy 4.05 Rm 24.00 97.20 977.75

Nails 1.00 LS 50.00 50.00

Skilled 0.06 No. 880.00 52.80 458.21


Labour 56.76
Unskilled 0.01 No. 660.00 3.96
dor/10.11.kha

Fixed wiremesh
60 1 m2 Wire mesh 1.00 sqm. 254.25 254.25 458.21 458.21 m2
panes
Material wooden listy 4.05 Rm 24.00 97.20 401.45
Nails 1.00 LS 50.00 50.00

Skilled 1.10 No. 880.00 968.00 2031.14


Labour 1793.00
Unskilled 1.25 No. 660.00 825.00
3 mm U P V C
61 sheet for roof 10 m2 3mm UPVC 11.00 sqm. 1613.64 17750.04 20311.44 2031.14 m2
covering.
Material J-hook 40.00 Pc 9.04 361.60 18518.44

Clip 40.00 Pc 10.17 406.80

Skilled 1.10 No. 880.00 968.00


Labour 1793.00
Unskilled 1.25 No. 660.00 825.00 1815.54
3 mm U P V C
62 sheet for ridge 10 rm 3mm UPVC 10.000 rm 1559.40 15594.00 18155.40 1815.54 rm
covering.
Material J-hook 40.00 Pc 9.04 361.60 16362.40

Clip 40.00 Pc 10.17 406.80

Skilled 0.67 No. 880.00 589.60 6060.88


Labour 2074.60
Unskilled 2.25 No. 660.00 1485.00
dol/37.A.b

Brick work in1:4


17 cement sand 1 m 3
Cement 0.90 Bag 849.76 764.78 6060.88 6060.88 m3
mortar
Sand 0.16 Cu.m. 3400.00 544.00
Material 3986.28
Brick 170.00 Nos. 15.75 2677.50

Prepared By: Checked By: Approved By:


136 kfOk tyf lkml6Ë;
136.1 hL=cfO=lkml6Ë;
lkml6Ë;sf] b/ /]6 )&$ / )&% s}lkmot
s|=;+= cfO6d OsfO{ 1/2" 3/4" 1" 1.25" 1.5" 2" 2.5" 3" 4" OGr
dL=dL
15 20 25 32 40 50 65 80 100
=
1 PNjf] k|lt uf]6f 45.0 71.0 113.0 176.0 242.0 368.0 978.0 1753.0
2 6L k|lt uf]6f 71.0 111.0 149.0 241.0 294.0 460.0 1208.0 2161.0
3 ;s]6 k|lt uf]6f 41.0 64.0 82.0 129.0 173.0 268.0 600.0 949.0
4 o'lgog k|lt uf]6f 124.0 173.0 230.0 344.0 455.0 633.0 1681.0 2306.0
5 s|; k|lt uf]6f 106.0 143.0 228.0 380.0 524.0 784.0 - - -
6 x]S; lgKkn k|lt uf]6f 47.0 67.0 99.0 156.0 191.0 284.0 - - -
7 l/= PNjf] k|lt uf]6f - 77.0 120.0 191.0 257.0 398.0
8 l/= 6L k|lt uf]6f - 120.0 162.0 248.0 326.0 517.0
9 l/= ;s]6 k|lt uf]6f - 64.0 87.0 134.0 168.0 280.0
10 l;=cfO{ Knu k|lt uf]6f
11 l;=cfO{ Sofk k|lt uf]6f 17.0 30.0 39.0 66.0 80.0 100.0 187.0 253.0 386.0
12 l;=cfO{ 6}+s lgKkn k|lt uf]6f 123.0 186.0 258.0 - - -
13 r]s g6 k|lt uf]6f 27.0 43.0 57.0 66.0 119.0 153.0 - - -
14
a|f; o'lgog -nf]sn 6fO{k_
k|lt uf]6f 171.0 341.0 427.0 596.0 853.0 1364.0 4525.0 6787.0 10633.0
15 a|f; o'lgog -o"PgPkm
6fO{k_ k|lt uf]6f 336.0 505.0 757.0 1022.0 1503.0 2101.0 - - -
16 u]6 eNe k|lt uf]6f 679.7 945.1 1442.5 2169.9 2950.4 4557.5 - - -
17 Unf]a eNe k|lt uf]6f 614.2 1045.1 1457.5 2947.8 3742.5 5214.2 - - -
18 hL=cfO{=±hL=cfO{ ˆn]Gh ;]6
k|lt uf]6f - - - -
1269.0 1484.4 1966.8 2352.0 3420.0
19 hL=cfO{=±Pr=8L=kL= k|lt uf]6f - - - - 1269.0 1484.4 1966.8 2352.0 3420.0
20 ˆn]Gh ;]6
Pr=8L=kL==±Pr=8L=kL= k|lt uf]6f 495.0 650.0 774.0 954.0 1250.0 1790.0 - - -
21 ˆn]Gh ;]6 a]G8
hL=cfO{ k|lt uf]6f 120.0 192.0 290.0 566.4 687.0 1262.0 - - -
136.1 hL=cfO=lkml6Ë;
lkml6Ë;sf] b/ /]6 )&$ / )&% s}lkmot
s|=;+= cfO6d OsfO{ 1/2" 3/4" 1" 1.25" 1.5" 2" 2.5" 3" 4" OGr
dL=dL
15 20 25 32 40 50 65 80 100
=
22 ˆnf] /]u'n]l6Ë eNe k|lt uf]6f 957.0 - - - - - - - -
23 /]u'n]l6Ë l6 k|lt uf]6f 1009.0 - - - - - - - -
/]u'n]l6Ë ls k|lt uf]6f 295.0
24 ˆnf]6 eNe k|lt uf]6f 632.0 827.0 1514.0 2330.0 3925.0 5240.0 - - -
ˆnf]6 eNe -
k|lt uf]6f
25 aL=kL=6L=6fOk_ 2820.0 3354.0 4402.0 9343.0 12810.0 16070.0 - - -
26 r]s eNe k|lt uf]6f 407.0 624.0 1405.0 2360.0 3525.0 5236.0 - - -
27 km]?n ss k|lt uf]6f 695.0 1240.0 2140.0 3650.0 4860.0 5680.0 7040.0 - -
28 a|f; ;]8n k|lt uf]6f - - - - - 853.0 1353.0 1653.0 1705.0
29 :n; eNe k|lt uf]6f - - - - 6000.0 8000.0 10000.0 12000.0 16000.0
30 ;L=cfO{=Po/ eNe k|lt uf]6f 3090.0 3910.0 4580.0 6168.0 8670.0 10650.0 - - -

136.2 hL=cfO{=lgKknx?
lgKknsf] ljj/0f / b/ /]6 s}lkmot
s|=;+= cfO6d OsfO{ 1/2" 3/4" 1" 1.25" 1.5" 2" 2.5" 3" 4" OGr
dL=dL
15 20 25 32 40 50 65 80 100
=
1 2"nfdf] k|lt uf]6f 25.70 35.50 49.90 64.00 80.10 101.20 140.60 165.20 438.40
2 3"nfdf] k|lt uf]6f 38.50 53.40 74.80 96.00 120.10 151.70 210.90 247.80 357.60
3 4"nfdf] k|lt uf]6f 51.40 71.20 99.80 128.00 160.10 202.30 281.20 330.40 476.70
4 5"nfdf] k|lt uf]6f 64.20 89.00 124.70 159.90 200.10 252.90 351.50 413.00 595.90
5 6"nfdf] k|lt uf]6f 77.10 106.70 149.60 191.90 240.10 303.40 421.70 495.80 715.10
6 8"nfdf] k|lt uf]6f 102.70 142.30 199.50 255.90 320.10 404.60 562.30 660.80 953.40
7 9"nfdf] k|lt uf]6f 115.60 160.10 224.40 287.80 360.10 455.10 632.60 743.40 1072.60
8 10"nfdf] k|lt uf]6f 128.40 177.90 249.40 319.80 400.10 505.70 702.90 826.00 1191.80
9 12"nfdf] k|lt uf]6f 154.10 213.40 299.20 383.80 480.10 606.80 843.40 991.20 1430.10
10 18"nfdf] k|lt uf]6f 231.10 320.10 448.80 575.60 720.10 910.20 1265.10 1488.60 2145.20
136.1 hL=cfO=lkml6Ë;
lkml6Ë;sf] b/ /]6 )&$ / )&% s}lkmot
s|=;+= cfO6d OsfO{ 1/2" 3/4" 1" 1.25" 1.5" 2" 2.5" 3" 4" OGr
dL=dL
lh=cfO{= kfO{ksf] r'/L sf6\g] 15 20 25 32 40 50 65 80 100
=
11 sfd k|lt r'/L 40.00 40.00 60.00 80.00 100.00 120.00 250.00 350.00 550.00
mot

150.29
mot

mot
Baganaskali Rural municipality
Office of the Rural Municipal Executive
Chirtungdhara ,Palpa

Rate Analysis:- 2076/2077


(User Committee)
3000

106700

96300 15000

533500

533500
Rate Analysis 2077-78
Baganaskali Rural Municipality
Norms Rate Per
S.N. Description Unit Remarks
S.N. Unit
1 dol/1 Site Clearance 26.40 m2
2 Removal of landslide
2.1 dor/15.34.ka For Soft soil 396.00 m3

2.2 dor/2.45.ka ForOrdinary soil 528.00 m3

2.3 dor/15.34.kha For Stone mixed soil 1056.00 m3


Cutting of trees including the removal of trunk, branches
3 dol/2
and stumps up to a lead of 100m
3.1 dol/2.3 Above 90cm-180cm girth 990.00 Each
3.2 dol/2.4 Above 180cm-270cm girth 1980.00 Each
4 dol/2.4 Earthwork excavation in Roadway & Drain
a. dol/5.a Ordinary soil 339.90 m3
b. dol/5.b Hard soil 407.88 m3
c. dol/5.c Ordinary rock 1359.60 m3
d. dol/5.d Medium rock 2719.20 m3
e. dol/5.f Hard rock ( blasting prohibitted ) 8157.60 m3
5 dol/9 Earthwork excavation for structures
a. dol/9.a Ordinary soil 679.80 m3
b. dol/9.b Hard soil 1359.60 m3
c. dol/9.c Ordinary rock 2719.20 m3
d. dol/9.d Medium rock 4078.80 m3
e. dol/9.e Hard rock ( blasting prohibitted ) 10876.80 m3
6 dol/10 Earth filling work 165.00 m3
7 Stone Analysis for area where stone are available within reach of 5 Kms of work site
7.1 dor/6.5 Stone soling work 3612.81 m3
7.2 dor/11.16 Stone pitching work 8226.81 m3
7.3 dol/38.a Dry Stone (Uncoursed rubble) masonary work 4217.81 m3
Stone (Uncoursed rubble) masonary work 1:6 cement
7.4 dol/38.d 9377.77 m3
mortar
Stone ( Uncoursed rubble) masonary work 1:4 cement
7.5 dol/38.c 9650.66 m3
mortar
Stone ( Uncoursed rubble) masonary work with mud
7.6 dor/6.2.2.c 5113.81 m3
mortar
8 dol/41.b P.C.C.(1:2:4) for foundation & floor 12445.06 m3
9 dol/41.B.b P.C.C.(1:1.5:3) for slab , beam, column , lintel etc. 15323.28 m3
10 dol/41.B.a P.C.C.(1:2:4) for slab , beam, column , lintel etc. 13105.06 m3
11 dol/41.A.a P.C.C.(1:3:6) for foundation & floor 10753.94 m3
Gabion work ( Assuming Stone Analysis for area where stone are available within
reach of 5 Kms of work site)
12 dol/45 Packing & filling of Gabion crates with rubble stones 3390.27 m3

Prepared By: Checked By: Approved By:


Rate Analysis 2077-78
Baganaskali Rural Municipality
Norms Rate Per
S.N. Description Unit Remarks
S.N. Unit
dor activity Fabrication of gabion boxes including rolling, cutting and
no.24.01.02,spe weaving & packing.Hexagonal Mesh size-
13 c. clause no 100mmx120mm, Mesh wire-10 SWG, Selvedge wire-
2401
7SWG, Binding wire-12 SWG
dor activity
no.24.01.02,spe
a c. clause no 1.5x1x1 m Box size 5568.06 m3
2401
dor activity
no.24.01.02,spe
b c. clause no 2x1x.5 m Box size k m3
dor2401
activity
no.24.01.02,spe
0 c. clause no 2x1x1 m Box size 5325.37 m3
dor2401
activity
no.24.01.02,spe
d c. clause no 3x1x1 m Box size 5037.53 m3
2401
District
Rate22.6 Machine Made Gabbion Box(Mecaferry)
a. Box size-1.5*1*1/0 #REF! No.
14 b. 2*1*1/1 #REF! No.
c. 2*1*.5/2 #REF! No.
d. 3*1*1/3 #REF!
15 dob/11.15.ka One brick flat soling 1012.90 m2
16 dol/37.A.c Brick work 1:6 cement sand mortar 15462.36 m3
17 dol/37.A.b Brick work 1:4 cement sand mortar 15850.42 m3
18 dol/40 Curtailment , bent up, binding of MS bars . 100.84 Kg
19.a dol/39.A Form work for beams, slab in structure. 741.05 m2
19.b dol/39.b Form work for Vertical structure. 521.55 m2
dol/39.b
19.c modified Form work for Irrigation Canal 273.48 m2

20 dob/10.1 Sal wood work for choukosh 225244.00 m3


21 dob/10.1 Normal wood work for choukosh 86644.00 m3

38mm th. Sal wood work for solid panel shutter of


22 dob/10.2 11526.02 m2
doors/windows (Size:1.07m x 1.982m =2.114m2)
38mm th. Normal wood work for solid panel shutter of
23 dob/10.2 6533.59 m2
doors/windows (Size:1.07m x 1.982m =2.114m2 )
Flush shutter 38mm th. sal wood frame with GI plain
24 dob/10.9 7127.62 m2
sheet on both side. (Size:1.092m x 2.058m =2.245m2 )
Flush shutter 38mm th. sal wood frame with GI plain
25 dob/10.9 6769.53 m2
sheet on one side. (Size:1.092m x 2.058m =2.245m2 )
Sal wood work for Glazed Shutter(4mm th glass)
26 dob/10.4 8207.69 m2
(size1.829x1.22)

Flush shutter 38mm th. Normal wood frame with GI


27 dob/10.9 4552.83 m2
plain sheet on one side. (Size:1.092m x 2.058m =2.245m2 )

Prepared By: Checked By: Approved By:


Rate Analysis 2077-78
Baganaskali Rural Municipality
Norms Rate Per
S.N. Description Unit Remarks
S.N. Unit
Flush shutter 38mm th. Normal wood frame with GI
28 dob/10.9 plain sheet on both side. (Size:1.092m x 2.058m =2.245m2 5185.70
)
29 dob/10.18 Sal wood work for truss 209382.00 m3
30 dob/10.18 Normal wood work for roofing 77082.00 m3
31 dob/10.17 Normal wood work for beam & Lintel. 60893.60 m3
32 dob/10.17 Sal wood work for beam & Lintel. 193193.60 m3
33 dob/11.21 25mm th. Normal wood work for wooden flooring 2393.10 m2
34 dob/11.21 25mm th. Sal wood work for wooden flooring 7697.70 m2
35 dob/10.19 Sal wood (25mm th. plank) work for eaves board 4765.28 m2
36 dob/10.19 Normal wood (25mm th. plank) work for eaves board 1300.28 m2
Sal wood frame of 50mm x 75mm for false ceiling with
37 dob/10.16.ka 2975.47 m2
3mm commercial plywood (Size 9.75 x 3.65=35.68sqm )
Normal wood frame of 50mm x 75mm for false ceiling
38 dob/10.16.ka with 3mm commercial plywood (Size 9.75 x 1386.35 m2
3.65=35.68sqm )

26 guage (Medium coated )CGI sheet for roof covering.


39 dob/9.1 938.54 m2
(1bundle=17.87m2) For 10m2,12/17.87=0.672bundle)

28 guage (Medium coated CGI sheet for roof covering.


40 dob/9.1 801.78 m2
(1bundle=17.87m2) For 10m2,12/17.87=0.672bundle)
41 dor/9.2 26 guage GI plain sheet for ridge covering. 712.58 Rm

28 guage (Coloured)CGI sheet for roof covering.


42 dob/9.1 1435.44 m2
(1bundle=17.87m2) For 10m2,12/17.87=0.672bundle)
43 dob/9.2 26 guage GI plain sheet(Coloured) for ridge covering. 712.58 Rm
44 dob/12.1 kha. 12.5mm 1:3 cement plaster work in ceiling 360.94 m2
45 dor/37.B.c. 12.5mm 1:4 cement plaster work except in ceiling 293.43 m2
46 dol/37.B.d. 12.5mm 1:6 cement plaster work except in ceiling 285.49 m2
47 dob/12.4.kha. 20mm 1:4 cement plaster work except in ceiling 461.06 m2
Flush rulled pointing works on random rubble masonary
48 dob/14.2.kha. 269.12 m2
work
49 dol/37.C.b. Pointing works on brick masonary work(1:2) 158.45 m2
50 dol/37.E.b. Rulled pointing works on brick masonary work(1:2) 316.90 m2
51 dob/11.20 3mm th. cement punning 244.41 m2
52 dob/13.1. Two coat white wash with lime on new surface 35.71 m2
53 dob/13.4.ka Two coat white cement work on new surface 96.18 m2
Two coat water proof cement paint(snowcem) work on
54 dob/13.4.kha 107.14 m2
new surface
dob/
55.a 13.4.ka+kha+ga Two coat enamel painting work 277.17 m2

dob/ Two coat Apex painting (Exterior weather paint) with


55.b 298.72 m2
13.4.ka+kha+ga Prime Coat

Prepared By: Checked By: Approved By:


Rate Analysis 2077-78
Baganaskali Rural Municipality
Norms Rate Per
S.N. Description Unit Remarks
S.N. Unit
56 dob/13.6 Two coat alluminium painting work 260.76 m2
57 dob/24.6 GI barbed wire for fencing work (Assume1m=0.12kg) 61.39 Rm
Dismantalling of various works & came out material lead
58
upto 30m
a. dob/19.1 Dismantalling of masonary work with mud mortar 699.60 m3
b. dob/19.2 Dismantalling of masonary work with cement mortar 1399.20 m3
c. dob/19.3 Dismantalling of R.C.C. or R.B.C. work 7260.00 m3
d. dob/19.4 Dismantalling of P.C.C. work 2640.00 m3
59 dob/10.11.kha Fixed glazed panes 1034.51 m2
60 dob/10.11.kha Fixed wiremesh panes 458.21 m2
61 3 mm U P V C sheet for roof covering. 2031.14 m2
62 3 mm U P V C sheet for ridge covering. 1815.54 rm

Prepared By: Checked By: Approved By:


UNIT RATE

Stone: 1 m3
a) haulage 5.00 Km
50%Stone by collection 1.00 0.50 660.00 330.00

Collection 50%stone by breaking of MR 4.00 0.50 660.00 1320.00


1
T & P @ 3% 49.50
Royalty 50.00
Transportation (Earthen road) 1.00 1.00 634.88 634.88
Load/ unload
Total Rs 2384.38
4 Boulder stone 1.0 m3

Quarry With in 5 Km
Speed 15 kmph Earthen 5 km
Total lead 5 km

T=2xD/V= 0.667
Total qty Unit Rate (Rs) Total (Rs)
Resources (Fuel, vehicle, labour) Remarks
Diesel (2.7xT) 1.8 ltr 95.00 171
Truck (0.75+T)x0.21 0.2975 hrs 450.00 133.88
Labour 0.50 md 660.00 330.00
1.00 m3 634.88
Transportation cost per m3 NRs. 634.88

T=2xD/V
SN Materials Source Black Top Road T1 = Earthen Road T2 = Total Time
Distance Speed Distance Speed T

A Local Construction Materials:


4 Boulders local area 0 30 0.00 5 15 0.667 0.667
5960.938

160

120
160

120

313.5

313.5
Rate Analysis-064/065
Total
Grand Rate Per
S.N. Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Unit
Total Unit
erial
50% by collection 0.7*1.1 No. 660.00 508.20
Unskilled
50% by chiseling 0.3*4.0 No. 660.00 792.00
Stone collection & cutting
Transportation lead 5 km (Stone qntl/
2 (including transportation) Out of 1 m3 22*5 3.40 374.00 2008.66 2008.66 2008.66 m3
wt :2200 kg/m3) km
district headquarter
Local Royalty 1 LS 50.00 50.00
Load and unload 0.431 Md 660.00 284.46

Prepared By: Checked By: Approved By:


Rate Analysis-065/66
Chain Dozer.

Chain Dozer Working in Hill area


Sn Description Quantity Unit Unit Rate Amount Remarks
1 Fuel Consumption
1.1 Diesl 20.00 Lts 91.50 1830.00
1.2 Grease 0.13 Kg 480.00 62.40
1.3 Hydraulic oil 0.108 Lts 300.00 32.40
1.4 Mobil 0.26 Lts 500.00 130.00
Total fuel consumption / hour(A): 2054.80 (A)

2 Allowance
2.1 Dozer operator 1.00 Md 890.00 890.00
2.2 Dozer helper 1.00 Md 570.00 570.00
2.3 Dozer labour 5.00 Md 560.00 2800.00
Total Allowance per day : 4260.00 8hr/day
Total Allowance per hour(B): 532.50 (B)

3 Hiring of dozer per hour(C) 2500.00 (C)


Total Cost/hour(A+B+C): 5087.30
Assuming that dozer excavates,
89 m3 Ordinary soil / hour: 57.16 Per m3
60 m3 Hard soil / hour: 84.79 Per m3
30 m3 Ordinary rock / hour: 169.58 Per m3
13.126 m3 Medium rock / hour: 387.57 Per m3
3.86 m3 Hard rock / hour: 1317.95 Per m3

Prepared by: Checked by: Approved by:


RATE ANALYSIS 2072-73

Respective
Unit
S.N. clause of Description level Unit Rate Unit Cost Rs. Rmk
specification Quantity

Carying out the construction operation of granular sub base including full compensation for making arrangment for trafic in
3 1 accordance wih clause G-12 of the specification except for initial treatment to shoulders and construction of diversions ; - Furn
A- a. Class 1 Grading ( when CBR = 30%) 1m3
Labour
Procuring sieved river gravel aggregates having size of
63 mm down unskilled md 0.68 560.00 380.80
4.75 - 63mm unskilled md 1.65 560.00 924.00
75 microns - 4.75 mm unskilled md 0.10 560.00 56.00
preparation of sub grade that was finished earlier unskilled md 0.05 560.00 28.00
for laying aggregate including the incientals unskilled md 1.50 560.00 840.00
for laying aggregate including the incientals Skilled md 0.25 750.00 187.50
Royalty LS 1.00 50.00 50.00
Load/ Unload unskilled LS 1.00 100.00 100.00
Transportation & load/unload from 6 km 6 Km 16 2.7 259.20
2825.50 m3

Cost per m2 Rs 423.83 m2


b/ ljZn]if0f–)^#÷)^$
n]j/÷
n]j/÷lgdf{0f ;fdfu| s'n hDdf k|lt
s|=;+= ljj/0f k|lt OsfO{ kl/df0f OsfO{ b/ /sd lgdf{0f ;fdf OsfO{
L PsfO{ b/
u|L hDdf
sfo{:yn ;/;kmfO{ ug]
1 1 3=dL s=n]j/ HofdL 0.04 hgf 130.00 5.20 5.20 5.20 5.20 3=dL=
{ sfo{
9'ªuf df6f] vGg]÷ sf6\
2
g] sfo{-Aofs sl6Ë_

s=n]j/ HofdL 0.50 hgf 130.00 65.00


s= ;fwf/0f df6f]df 1 3=dL 66.95 66.95 66.95 3=dL=
oGq tyf pks/0f #Ü 1.95
s=n]j/ HofdL 0.60 hgf 130.00 78.00
v= s8f df6f]df 1 3=dL 80.34 80.34 80.34 3=dL=
oGq tyf pks/0f #Ü 2.34
s=n]j/ HofdL 2.00 hgf 130.00 260.00
u= ;fwff/0f 9'ªuf sf6\g] 1 3=dL 267.80 267.80 267.80 3=dL=
oGq tyf pks/0f #Ü 7.80
s=n]j/ HofdL 4.00 hgf 130.00 520.00
3= dWod 9'ªuf sf6\g] 1 3=dL 535.60 535.60 535.60 3=dL=
oGq tyf pks/0f #Ü 15.60
s8f 9'ªuf sf6\g] - s=n]j/ HofdL 17.00 hgf 130.00 2210.00
ª 1 3=dL 2276.30 2276.30 2276.30 3=dL=
l5gf]n] _ oGq tyf pks/0f #Ü 66.30

9'ªuf df6f] vGg]÷ sf6\


3
g] sfo{-husf nflu_

s=n]j/ HofdL 1.00 hgf 130.00 130.00


s= ;fwf/0f df6f]df 1 3=dL 133.90 133.90 133.90 3=dL=
oGq tyf pks/0f #Ü 3.90
s=n]j/ HofdL 2.00 hgf 130.00 260.00
v= s8f df6f]df 1 3=dL 267.80 267.80 267.80 3=dL=
oGq tyf pks/0f #Ü 7.80

b/ ljZn]if0f–44
b/ ljZn]if0f–)^#÷)^$
s=n]j/ HofdL 4.00 hgf 130.00 520.00
u= ;fwff/0f 9'ªuf sf6\g] 1 3=dL 535.60 535.60 535.60 3=dL=
oGq tyf pks/0f #Ü 15.60
s=n]j/ HofdL 8.00 hgf 130.00 1040.00
3= dWod 9'ªuf sf6\g] 1 3=dL 1071.20 1071.20 1071.20 3=dL=
oGq tyf pks/0f #Ü 31.20
s8f 9'ªuf sf6\g] - s=n]j/ HofdL 30.00 hgf 130.00 3900.00
ª 1 3=dL 4017.00 4017.00 4017.00 3=dL=
l5gf]n] _ oGq tyf pks/0f #Ü 117.00

4 9'ªuf ;f]lnª ug]{ sfo{

s=n]j/ HofdL 1.50 hgf 130.00 195.00


s. 1 3=dL 9'ªuf hDdf ug]{ 0.55 200.85 200.85 200.85 3=dL=
dWod 9'Fuf sf6\g] 5.85

b/ ljZn]if0f–45
b/ ljZn]if0f–)^#÷)^$

l;kfn' 14.00 ;+Vof 210.00 2940.00


n]j/ 5695.00
HofdL 19.00 ;+Vof 145.00 2755.00
l;d]G6 Knfi6/ -!M^_ j=dL
2 100 13662.00 j=dL=
@) dL=dL=df]6fO{ = lgdf{ afn'jf 2.20 3=dL= 860.00 1892.00
0f ;fd 7967.00
fu|L l;d]G6 16.20 Aofu 375.00 6075.00

b/ ljZn]if0f–46
District Rate (Labour) Palpa -070/71 47

cf=j= )&!
cf=j= )&)÷&!
÷&@
s|=;+= HofdLsf] ljj/0f k|lt OsfO{ sf] :jLs[t
sf] :jLs[t
b/ /]6
b/ /]6
s= HofdL Hofnf b/ /]6
1 HofdL ;fwf/0f-cbIf_ JolQm÷lbg 355.0 400.0
2 s'NnL gfOs]-d]7_ JolQm÷lbg 360.0 405.0
3 HofdL ;fwf/0f-cbIf_ JolQm÷lbg 407.4
4 HofdL 9'+uf kmf]g]{ JolQm÷lbg 407.4
l;sdL{,8sdL{,gsdL{,jh|sdL{,lrqsf/
3 L,KnDj/,cf/fs;L JolQm÷lbg 510.0 570.0
6 8sdL{ JolQm÷lbg 582.0
7 gsdL{ JolQm÷lbg 582.0
8 jh|sdL{ JolQm÷lbg 582.0
9 lrqsf/L JolQm÷lbg 582.0
4.0 l5gf]n] Kjfn kfg]{ HofdL
4.1 ;lhnf] 7fpFdf JolQm÷lbg 355.0 400.0
4.2 c;lhnf] 7fpFdf JolQm÷lbg 360.0 405.0
District Rate (Labour) Palpa -070/71 48

cf=j= )&!
cf=j= )&)÷&!
÷&@
s|=;+= HofdLsf] ljj/0f k|lt OsfO{ sf] :jLs[t
sf] :jLs[t
b/ /]6
b/ /]6

11 KnDj/ JolQm÷lbg 0.0 405.0


3 ;xfos KnDj/ JolQm÷lbg 360.0 405.0
13 cf/fs;L JolQm÷lbg 0.0 405.0
4 rf}lsbf/ JolQm÷lbg 0.0 400.0
5 ;e]{ x]Nk/-c4{bIf_/Nofa Aafo JolQm÷lbg 385.0 435.0
6 l8«n/ JolQm÷lbg 385.0 435.0
7 laiffbL cf}ifwLsf] sfd ug]{ HofdL JolQm÷lbg 385.0 435.0
8 g;{/L gfOs]÷jg x]/fn' JolQm÷dlxgf 7000.0 7500.0
9 s'lrsf/ JolQm÷lbg 0.0 400.0
10 ;'k/efOh/
11 OlGhlgo/ JolQm÷lbg 770.0 814.0
12 ;j–OlGhlgo/ JolQm÷lbg 600.0 627.0
;j–OlGhlgo/ -sDtLdf # jif{ cg'ej
13 ePsf]_ JolQm÷lbg 615.0 642.0
14 cl;:6]G6 ;j–OlGhlgo/ JolQm÷lbg 570.0 591.0

15 la1÷ laz]if1 -jg_ JolQm÷lbg


vf= kf= KnDa/ -;'k/efOh/_ !)
16 jif{ cg'ej ePsf] JolQm÷lbg 550.0 570.0
17 k/efOh/ ;fdfGo -P;=Pn=;L=pQL0f{_ JolQm÷lbg 515.0 570.0
19 gflk sfdbf/ -bIf_ JolQm÷lbg 0.0 575.0
20 Anfi6/ JolQm÷lbg 510.0 570.0
21 8f]h/ ck/]6/ JolQm÷lbg 605.0 675.0
22 8f]h/ x]Nk/ JolQm÷lbg 385.0 430.0
23 :6fkm d]g JolQm÷lbg 0.0 435.0
24 /]lGhË d]g JolQm÷lbg 0.0 400.0
25 j]N8/ JolQm÷lbg 0.0 400.0
26 On]lS6«l;og-xfp; jfol/Ë ug]{_ JolQm÷lbg 510.0 570.0
District Rate (Labour) Palpa -070/71 49

cf=j= )&!
cf=j= )&)÷&!
÷&@
s|=;+= HofdLsf] ljj/0f k|lt OsfO{ sf] :jLs[t
sf] :jLs[t
b/ /]6
b/ /]6

27 xfO6]G;g÷nf]6]FG;g÷cf]e/x]8df sfdJolQm÷lbg 510.0 570.0


28 d]t/ JolQm÷lbg 385.0 430.0
29 el/of JolQm÷lbg 385.0 430.0
30 b'/L ;+ef/ stf{ JolQm÷lbg 0.0 400.0
31 ljB't bIf JolQm÷lbg 510.0 570.0
32 ljB't c4{bIf JolQm÷lbg 385.0 430.0
33 l;lgo/ d]sflgS; JolQm÷lbg 395.0 440.0
34 xn'sf ;jf/L rfns JolQm÷lbg 435.0 489.0
35 ef/L ;jf/L rfns JolQm÷lbg 385.0 530.0
36 SofDk js{/ JolQm÷lbg 385.0 430.0
37 :ofDkn/÷6g]n JolQm÷lbg 385.0 430.0
38 dfOlgË ;e]{ x]Nk/ JolQm÷lbg 385.0 430.0
39 s[lif dhb"/ JolQm÷lbg 255.0 300.0
39 ;e]{Ifs JolQm÷lbg
39 cldg JolQm÷lbg
b. 9'jfgL
6«saf6 b/lkr/]6
af6f]df
1 9'jfgL-;lhnf] ;fdfg_ SjL=÷ls=dL= 2.2 2.5
6«saf6 lkr af6f]df 9'jfgL-
2 c;lhnf] ;fdfg_ SjL=÷ls=dL= 3.2 3.6
6«saf6 sRrL af6f]df
3 9'jfgL-;lhnf] ;fdfg_ SjL=÷ls=dL= 3.0 3.4
6«saf6 sRrL af6f]df 9'jfgL-
4 c;lhnf] ;fdfg_ SjL=÷ls=dL= 3.6 4.0
6}«S6/af6 lkr af6f]df
5 9'jfgL-;lhnf] ;fdfg_ SjL=÷ls=dL= 2.3 2.6
6}«S6/af6 lkr af6f]df 9'jfgL-c;lhnf]
6 ;fdfg_ SjL=÷ls=dL= 3.5 3.9
District Rate (Labour) Palpa -070/71 50

cf=j= )&!
cf=j= )&)÷&!
÷&@
s|=;+= HofdLsf] ljj/0f k|lt OsfO{ sf] :jLs[t
sf] :jLs[t
b/ /]6
b/ /]6

6}«S6/af6 sRrL af6f]df


7 9'jfgL-;lhnf] ;fdfg_ SjL=÷ls=dL= 3.2 3.6
6}«S6/af6 sRrL af6f]df 9'jfgL-
8 c;lhnf] ;fdfg_ SjL=÷ls=dL= 3.8 4.3
6}«S6/af6 lkr af6f]df 9'jfgL- lh
9 cfO tyf Pr l8 kL kfOk_ SjL=÷ls=dL= 15.0 16.8
6}«S6/af6 sRrL af6f]df 9'jfgL-
10 c;lhnf] ;fdfg_ SjL=÷ls=dL= 20.0 22.5
6}«S6/af6 lkr af6f]df 9'jfgL- Pr l8
11 kL kfOk ^# Pd Pd eGbf d'lg_ SjL=÷ls=dL=
6}«S6/af6 sRrL af6f]df 9'jfgL- Pr
l8 kL kfOk ^# Pd Pd eGbf d'lg_ SjL=÷ls=dL=
11 k}bn ;lhnf] ;fdfg 9'jfgL s]=hL=÷sf]if 1.9 2.1
12 k}bn c;lhnf] ;fdfg 9'jfgL s]=hL=÷sf]if 2.5 2.8

13 lj6'ldg !^% s]=hL= 6«sdf nf]8 k|lt 8«d 40.0 45.0


14 lj6'ldg !^% s]=hL= 6«sdf cgnf]8 k|lt 8«d 25.0 28.0
16 l;d]G6sf] af]/f nf]8÷cgnf]8 af]/f 7.0 7.8
17 kf]n 9'jfgL
*–( ld6/ nfdf] sf7 jf l:6nsf] -
17.1 g=kf=If]qleq_ uf]6f 0.0 406.0
*–( ld6/ nfdf] sf7 jf l:6nsf] -
17.2 g=kf=If]q aflx/_
*–( ld6/ nfdf] cf/=;L=;L= - uf]6f÷ls=dL= 24.0 27.0
17.3 g=kf=If]qleq_ uf]6f 411.0 459.0
District Rate (Labour) Palpa -070/71 51

cf=j= )&!
cf=j= )&)÷&!
÷&@
s|=;+= HofdLsf] ljj/0f k|lt OsfO{ sf] :jLs[t
sf] :jLs[t
b/ /]6
b/ /]6

*–( ld6/ nfdf] cf/=;L=;L= -


17.4 g=kf=If]qaflx/_ uf]6f÷ls=dL= 29.0 32.4
17.5 !!
!! ld6/
ld6/ nfdf]
nfdf] l:6nsf]
l:6nsf] -g=kf=If]qleq_
-g=kf=If]q uf]6f 399.0 446.0
17.6 aflx/_ uf]6f÷ls=dL= 25.0 28.0
17.7 &
&=%ld6/ld6/
nfdf] l:6nsf]
nfdf] -g=kf=If]qleq_
l:6nsf] -g=kf=If]q uf]6f 0.0 369.0
17.8 leq_ uf]6f 335.0 375.0
District Rate (Labour) Palpa -070/71 52

cf=j= )&@÷
cf=j= )&$
&# sf] :jLs[t
b/ /]6 ÷&% sf]
l:js[t b/ /]6

445.0 560.0
450.0 565.0

635.0 750.0

445.0 560.0
450.0 565.0
District Rate (Labour) Palpa -070/71 53

cf=j= )&@÷
cf=j= )&$
&# sf] :jLs[t
b/ /]6 ÷&% sf]
l:js[t b/ /]6
405.0
450.0 560.0
405.0
445.0 560.0
485.0 635.0
485.0 600.0
485.0 600.0
7500.0 9000.0
445.0

895.0 1015.0
690.0 780.0

706.00
650.0 735.0

1015.0

635.0
630.0 735.0
640.0 600.0
635.0 750.0
740.0 890.0
450.0 570.0
455.0 455.0
425.0 425.0
425.0 565.0
635.0 750.0
District Rate (Labour) Palpa -070/71 54

cf=j= )&@÷
cf=j= )&$
&# sf] :jLs[t
b/ /]6 ÷&% sf]
l:js[t b/ /]6
635.0 750.0
470.0 585.0
470.0 585.0
435.0 560.0
635.0 750.0
470.0 585.0
485.0 750.0
540.0 615.0
585.0 665.0
435.0 560.0
435.0 560.0
435.0 560.0
300.0 320.0
780.0
735.0

2.7 2.0

3.9 2.6

3.7 2.8

4.4 3.4

2.8 2.2

4.3 3.4
District Rate (Labour) Palpa -070/71 55

cf=j= )&@÷
cf=j= )&$
&# sf] :jLs[t
b/ /]6 ÷&% sf]
l:js[t b/ /]6

3.9 3.1

4.7 3.7

18.4 13.6

24.8 19.3

20.3 15.0

27.2 21.0
2.3 3.2
3.1 4.1

49.5 57.0
30.5 35.5
8.6 9.0
0.0

446.0 22.0

29.7 26.4
505.0
District Rate (Labour) Palpa -070/71 56

cf=j= )&@÷
cf=j= )&$
&# sf] :jLs[t
b/ /]6 ÷&% sf]
l:js[t b/ /]6

35.7
490.0 22.7
30.7
406.0 21.0
412.0 21.5