You are on page 1of 4
RECURRING GFR 12-4 [See Rute 238 (1) UTILIZATION CERTIFICATE (UC) FOR THE YEAR 2022-23, In respect of RECURRING ‘as on 3110/2025 to be submited to SERB 's the UC Provisional (ProvisionaV/Audited) (oe ivn spate fr ach ran y ng ons ec) 1. Name ofthe grant recelving Organ 2 Name of Principal Investigator?) zation: Indian Insitute of Technology Tirupat! Dr. Krahn § Addepal 3. SERB Sandton order no. & date: RIF20217000089 & 28-Sep-2022, 4. Tile ofthe Project: "Cartonless alternative fuels for transportation’. 5, Name ofthe SERB Scheme : RJF/2021/000099 (CRGINPOFIECR - ete) 6. Whether recuring or non-recuring 7. Grants postion atthe begining of grants: Recurring the Financial year (Grants released by SERB) 8, Cash In Hand/Bank Cary foward trom previous fnanclal year: Ni bother any Teta ‘i ni 8, Deas of rants received, expenditure incured and cing balances: (Actuals) [aloes mone | ota] maggie tanta reatmonse | stare | cng onene ornare | Son severe ey isa | Sm Es monk" | =e toane | Om arson * ° a z co Tok RIRORTRRRORT | SEINE | TERE RREDD | THAR GEORD | THRESH | AR TARO Component wise utlzaton of grants: { Grantsin-ad- General Totat FH 26 53500 TSB Details of grants position atthe end ofthe year Cash In Hand/Bank Refunds to SERB, any Rs 499,725 00 Rs 000 Bolance (Carry forward to nextf nancial year): Rs. 439,726.00 Signature of PL ee, icra {.e—) Signature with Seat. igh nenatok rmadesy nology Tirupatifier OFR 12-8 (See Rule 238 (4)) UTILIZATION CERTIFICATE (UC) FOR THE YEAR 2072.23 In respect of RECURRING as on 3170272023 to be submitted to SERB Is the UC Provisional (ProvisionaV/Audited) (ote glen separator ech rare your ering on 31s! ach) erties that have ste thatthe condtons on which grants were sanctlned have been di fuledre boing fled end that have exercised flowing checks fo see that tha money has been actualy ultzed fhe purpose for which was sanconed: (0 Tremain accounts and one subsidiary accouns and repsers (clung asses registers) are mebtained as presrbed inthe relevant AciRulestStancing ineucins (mention the AelRuls) nd have been duly audted by designated autors The ‘gure depcted above tly wih he audted fgues mentloned in fhancia statementslaccouns, (@) There exit temo contol for safeguarding publ fundslasele, walching outcomes and achievements of physical argets gaint the financial inputs, ensuring qual in asset creation et. & the perode evaluation of internal controls is exercised to ensure thei eectveness (@)_Tethe bes of eur knowledge and ble, ro taneactons have been ener thal are in olan of relevant Ac/Rukee/stan ng insructions and scheme guidelines. (6) The responstbities among the key funetonaries for exeeuton ofthe scheme have been asignd in lar tame and ate rot gerenalinnatve, (0) The benefts were eatended to the intended beneficiaries and only such areasseicts were covered where the scheme was intended to operate (H) The expenditure on various components ofthe scheme was in the propotons authorized as per the scheme guidelines and ferns and conditions ofthe grants-in-aid (il) ithas been ensured thatthe physical and financial perormanoe under RUF2021N00088 (CRGINPOFIECR....et.) (Name of the scheme has been according to the requirements, as preseibed in the guidelines issued by Gov. of India and the performancenargets achieved stalement forthe year to which the utization ofthe fund resuted in outcomes given at Annexure = lay enclose. (il) The uiitation of the fund resuted in outcomes given at Annexure - il duly enclosed (lo be formulated by the MinistryDepartment concemed as per thelr requirementsspecicalons.) (%) Details of various schemes executed by the agency through grants-in-aid received ttm the same Ministy or trom other Mristigs is enclosed at Annexure II (lo be formulated by the MintryDepartment concemed as per their requcements/speciteations) Date: 19162023 Place: Tirupat! (884 Signature with Seal: soneneoin: AGM.» | BRR TERT ince pyechnology Tir (Ste ot inappiate ems) Oo 1. REQUEST FOR ANNUAL INSTALMENT WITH UP-TO-DATE STATEMENT OF EXPENDITURE SERB Sanction Order Noand dale _: RJF/2021/000099 & 26-Sep-2022 Name ofthe Pl Dr. Krishna $ Addepalli Total Project Cost Rs.1,19,00,000/- Revised Project Cost NA (i€applicabte) Date of Commencement 29/09/2022 Statement of Expenditure (Month wise expenditure incurred during eurent financial year) Month & year | Expenditure incurred/ committed pra May-22 jun-22 jul 22 ged [Sep-22 (Oct-22 451,935) Nov-22 1.35, [Dec-22 135,000 jan-23 eb DB 2,70,000 [Mar-23 1,35,000 [Total 933 Grant received in eachyear. a Ist Year Rs. 15,66,660/- b. 2nd Year ©. 3rd Year d. Interest, ifany © Total (a+b+e+d) Rs. 15,66.660)- ‘Statement of Expenditure ancial year of 22-23 from. tember 2022 to 3) +h 2023) Expenditure Incurred (IV) Ist Year a Sr | Sanctioned (29th Total Expendit | Palanseas | Requirement No| Heads Sep. a by ‘on (date) | of Funds up remarks @| @ 202-9 3rd Year (vueivevevy | (Vit to3ist or revised | 31st oe Vil) | March 2024 (a) March 2023 Fund unavailable towards 1 | Fellowship 81,00,000 | 10,66,935 10,66,935 70,33,065 16,20,000 disburse t of Fellowship Payment of Rs 36,2277 bas been released on 26.05.2023 towards the purchase of 2| Research | 35,00,000 (0| 35,00,000} —_7,00,000 | Computer Peripherals & ra Purchase Order towards other accessories have been released forks. 74519 3 | Overhead 3,00,000 | _ 60,000 60,000 | __2,40,000 60,000 | OH for next FY. Total 1,19,00,000 | 11,26,935 11,26,935 | _1,07,73,065 23,80,000 Date: 19-06-2023 (with seal) Assistant Indian institute of Technology Tinupati ' ‘Name and Signature of Principal Investigator: i Ona * DOS — Date of Start of project Nate: ‘1. Expenditure under the sanctioned heads, at any point of time, should not exceed funds allocated under that head, without prior approval of SERB ic. Figures in Column (VIII) should not exceed corresponding figures in Column (II!) 2. Utilization Certificate (Annexure lil) for each financial year ending 31°* March has to be enclosed along with request for carry- forward permission to the next financial year.

You might also like