Proposal for 5 Kw Grid Tied Solar System


Sr #` DESCRIPTION Qty Price

1 Grade A Tier 1 Solar Panel 550 Watt Jinko 10 Rs 405,000


2 10 kw Grid Tied Inverter Growatt 10 KTL 1
Rs 290,000
3 Wifi Dongle for Monitoring of the system 1
4 Smart Energy Meter for Zero Export & Monitoring 1 Rs 50,000

5 Elevated Double Epoxy Coated Structure in 14 Guage 1 Job Rs 140,000


As Per
6 DC Cable 4 mm PVC/XLPE 1000 V (Pakistan Cables)
Requirement
As Per
7 AC Cable 4 mm 600 V 4 Core (Pakistan Cables)
Requirement
As Per
8 Earthing Cable 2.5 mm (Pakistan Cables)
Requirement
Solar Distribution Box
DC Fuses (Make: Siemens / Copper Bussman)
2 P, 20 Amp 1000Volts, MCB
Nos = As per Nos of strings
9 AC SPDs (Make: Schneider) 1 Rs 145,000
Uc= ~440V
In:20KA
Imax:40KA
Up: <2.2KV
Combined AC Distribution Box (10 kW X 1)
10 1
Breakers = 1 x 32 Amp, MCCB, Make Schneider
11 Earth Pit 1
Electrical Installation Components (Pipes, Conduits, Cables As Per
12 Ties Etc) Requirement
13 Documentation for Net Metering 1 Job Rs 15,000

Final Disocunted Price Rs 1,045,000


MAT ENERGY (SMC-PVT) LTD

Warranties
Panels 10 Years Replacement 25 Years Performance
Inverter 10 Years Warranty
System Complete System warranty for 1 years and 5 years service warranty

Payment Terms
70% Advance at the time of order
20% After Delivery of Material
10% After Completion of Work

Project Lead Time


3-4 Weeks After receipt of Advance Payment.

Net Metering
MAT Energy will assist its customer to procure Net metering facility through its AEDB License, in
no circumstances shall MAT Energy be held liable on any account if the said approval is not
Other Customer responsibilities for Net Metering include: Meter Name change, Sanction load change.
Net Metering process time: 3 months but it may vary as per DISCO/NEPRA approvals.
Net Metering charges are not included in Offer.
NEPRA Demand Notice payment
1000/- Per kw NEPRA Generation License Fee for system size greater than 20 kw Systems
Meter changing charges is in customer scope.
Net Metering application will be submitted only after complete payment of the installed system

Force Majeure
MAT Energyis not responsible for cost of repair of system if failure is caused by force majeure
including but not limited to inclement weather, theft, government regulation, fire, political
actions, terrorism and war.

Note:
Smart Energy Meter can be installed at additional cost and will be charged as per actual. Benefits of Smart Energy Meter
include:
System to be turned on before K-Electric bidirectional meter installation
Additional data visibility on consumption and export
MAT ENERGY (SMC-PVT) LTD

Project Details
5 kw Grid Tied Hybrid PV Solar system consisting of Design, Supply, Installation, Commissioning.

Scope of work

Design
• Detailed Site Survey
• Project Designing

Installation

• Setting up the roof access and the mobilization of Modules & Equipment
• Module and inverter installation
• Grid Termination
• System testing and commissioning
• Clearing of access and remaining material
• Acquiring NEPRA Generation License
• Installation of Bidirectional meter

Assumptions

• Our Quotation is based on information gathered at the site survey.


• Length of DC, AC and Earthing Cables, cable Tray could be changed according to routing of
cables and will be charged as per actual.

Exclusions

• Any Civil work for the setup of Inverter room.


• Wi-Fi Router or Any Provision of Internet Connectivity.
• Any re-decoration work following the installation.
• Any other work not explicitly included above.

Client Obligations

To ensure completion of following before starting work of installation and commissioning:


• Provision of neat and clean roof.
• Arrangement of temporary storage area for solar equipment and accessories.
• Room for Inverters, Main Distribution Box & any other related civil / Mechanical work.
• All the necessary approval, clearance, and requisites to carry out the scope of work.
• Availability of Wifi connectivity at the installation Location
MAT ENERGY (SMC-PVT) LTD

RETURN ON INVESTMENT (ROI)

Unit Rate Rs35


Increment % Each Year 10%
Energy Depreciation Per Year 0.55%
Total Investment Rs 1,045,000
Unit Generation in 1st Year 7,957 Kwh

PAY BACK PERIOD ( ROI) = 2.5 Years

Pay Back Period


Rs16,000,000

Rs14,000,000

Rs12,000,000

Rs10,000,000

Rs8,000,000
ROI

Rs6,000,000

Rs4,000,000

Rs2,000,000

Rs-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
-Rs2,000,000
Years

ROI

Address: Office # 316, International Auto Parts Market, Marston Road, Karachi.
Cell: 0307-3144614

CUSTOMER UNDERTAKING
MAT ENERGY (SMC-PVT) LTD

I acknowledge and represent that I have read the terms and conditions of this proposal and I fully understand
what is stated herein. I expressly agree to all the terms and conditions set out herein and to adhere to all
payment’s obligations and other ancillary obligations.

Customer Signature For: MAT Energy

You might also like